Page No.# 1 of 42
GAHC010125902023
2026:GAU-AS:8154
THE GAUHATI HIGH COURT
[THE HIGH COURT OF ASSAM, NAGALAND, MIZORAM & ARUNACHAL PRADESH]
WRIT PETITION [C] No. 3367/2023
Oil India Ltd., a company registered under the
Indian Companies Act, having its registered
office at Duliajan, in the district of Dibrugarh,
Assam,
represented
by
its
resident
Chief
Executive.
………………Petitioner
-Versus1.
The State of Assam, represented by the
Commissioner
and
Secretary
to
The
Government of Assam, Revenue & Disaster
Management
[LR]
Department,
Dispur,
Guwahati-6.
2.
The Principal Secretary to the Government of
Assam, Revenue & Disaster Management [LR]
Department, Dispur, Guwahati-6.
3.
The Deputy Secretary to the Government of
Assam, Revenue & Disaster Management [LR]
Department, Dispur, Guwahati-6
4.
The Deputy Commissioner -cum- Collector
Tinsukia, District – Tinsukia, Assam.
5.
Nandlal & Sons Tea Industries Pvt. Ltd. having
its administrative office at Bishmile Chabua in
the district of Dibrugarh, Assam, PIN- 78618
Page No.# 2 of 42
……………….Respondents
BEFORE
HON’BLE MR. JUSTICE MANISH CHOUDHURY
Advocates :
Petitioner
:
Mr. M.K. Choudhury, Senior Advocate
Mr. K. Kalita, Advocate
Respondent nos. 1, 2 & 3
:
Mr. J. Handique, Standing Counsel, Revenue
& Disaster Management Department, Govt.
of Assam
Respondent no. 4
:
Mr. D. Nath, Senior Government Advocate,
Assam
Respondent no. 5
:
Ms. G. Goswami, Advocate
Date on which judgment is reserved
:
10.03.2023
Date of pronouncement of judgment
:
10.06.2026
:
No
:
Yes
Whether the pronouncement is of the
Operative part of the judgment?
Whether the full judgment has been
Pronounced ?
Page No.# 3 of 42
JUDGMENT & ORDER
1.
In this writ petition instituted under Article 226 of the Constitution of India, the
bone of contention is to a process of acquisition of two parcels of land. The
dispute began in the year 2000 and at that stage, the petitioner, Oil India
Limited sought for the right to use the two parcels of land for carrying out its
drilling operation and at a subsequent stage, its role had transitioned from an
user to a requiring body. The respondent no. 5 is the proprietor of M/s
Hukanpukhuri Tea Estate, who is the land owner of the two parcels of land.
2.
The petitioner, Oil India Limited [OIL] is a Government of India Undertaking and
it has its Registered Office at Duliajan, District – Dibrugarh, Assam. Its core
activities are exploration, production and transportation of crude oil and natural
gas. For carrying out its operation, the petitioner [OIL] acquires land in various
parts of India, primarily via bipartite settlement. In case of failure to arrive at
any such settlement, it used to acquire land under the provisions of Land
Acquisition Act, 1894 [since repealed]. Presently, acquisition of land is made
under the provisions of the Right to Fair Compensation and Transparency in Land
Acquisition, Rehabilitation and Resettlement Act, 2013 or, else, it secures the
right to use land under the provisions of the Petroleum and Minerals Pipelines
[Acquisition of Right of User in Land] Act, 1962 and/or Rules 189 and Rule 190
of the Rules framed under Section 155 [f] of the Assam Land and Revenue
Regulation, 1886.
3.
This is the 8th round of litigation among the parties. The role of the petitioner
[OIL] is of the user as well as the requiring body for the two parcels of land. The
role attributable to the respondent nos. 1 – 4 is that of the acquiring authority
with the role of the respondent no. 5 as the land owner of the two parcels of
land. For appreciation of the issues raised and involved in this round, a narration
of the previous events and the previous rounds of litigation are necessary.
4.
The two parcels of land involved are located in Village – Sukanpukhuri Tea
Estate, Mouza – Tinsukia in the district of Tinsukia, Assam and the total area in
Page No.# 4 of 42
the two parcels of land is 56 Bighas, 4 Kathas & 3 Lessas [56B-04K-03L]. Their
descriptions are as under :Table-I
1st Parcel of Land
Schedule
Village
Patta No.
Dag No.
Area B-K-L
Sukanpukhuri T.E.
No. 1 Tea Miyadi
1 [Part]
00-01-00
2 [Part]
00-02-00
3 [Part]
00-01-10
30 [Part]
00-02-10
31 [Part]
00-01-03
43[Part]
00-00-07
32 [Part]
00-02-17
33 [Part]
00-03-09
34 [Part]
00-02-08
100 [Part]
03-04-03
104 [Part]
00-03-09
101 [Part]
00-04-01
106 [Part]
02-03-03
109 [Part]
00-00-17
103 [Part]
00-00-12
132 [Part]
23-01-06
180 [Part]
00-01-15
181 [Part]
00-04-04
182 [Part]
03-03-03
95 [Part]
16-02-15
Total
53-01-09
37 NLR
Table-II
2nd Parcel of Land
Schedule
Page No.# 5 of 42
Village
Patta No.
Dag No.
Area B-K-L
Sukanpukhuri T.E.
No. 1 T.P.
7 [Part]
00-02-12
8 [Part]
00-02-05
9 [Part]
01-04-08
10 [Part]
00-00-10
22 [Part]
00-02-01
36 [Part]
00-00-15
Total
03-02-14
B = Bigha
K = Katha
L = Lessa
The two parcels of land together are also hereinafter referred to as ‘the subjectland’, at places, for ease of reference.
5.
The petitioner [OIL] approached the respondent no. 5, which owns and runs M/s
Hukanpukhuri Tea Estate, for procurement of the subject-land for use in the
course of its drilling locations, namely, HNE/HNF, HNG, DET and TH under the
Bipartite Settlement procedure based on the rates fixed by the jurisdictional
Deputy Commissioner, that is, the District Commissioner, Tinsukia [the
respondent no. 4] for land value and surface compensation [zirat]. But, the
respondent no. 5 refused to accept the land value and surface compensation as
per the rates fixed by the respondent no. 4. As a result, the process of
procurement of the subject-land through the Bipartite Settlement procedure
failed.
6.
In view of failure to procure the subject-land by way of a Bipartite Settlement
and an urgency arose for using the subject-land for oil exploration, the petitioner
[OIL] vide its Letter dated 29.06.2000 requested the respondent no. 4 to grant
‘Right of User’ status in respect of the subject-land under the provisions of Rule
190 of the Rules framed under Section 155[f] of the Assam Land and Revenue
Regulation, 1886 [‘the Regulation, 1886’, for short]. By the said Letter, it was
informed that the petitioner [OIL] would also construct, develop and maintain
the existing road during the operational period.
Page No.# 6 of 42
7.
On the basis of the Letter dated 29.06.2000, the respondent no. 4 vide an Order
dated 17.11.2000, followed by a Corrigendum dated 21.11.2000, granted
authority to the petitioner [OIL] to enter upon and carry out surface operation
upon the subject-land and also to remove the dwelling houses, buildings, other
structures standing on the land or any cultivation over the land. The Order dated
17.11.2000 and the Corrigendum dated 21.11.2000 were issued in exercise of
powers vested in him under Rule 190 r/w Rule 189 of the Rules framed under
Section 155 [f] of the Regulation, 1886.
8.
Pursuant to the Order dated 17.11.2000 and the Corrigendum dated 21.11.2000,
the two parcels of land were handed over to the petitioner [OIL] and it took
physical possession of the subject-land on 27.11.2000. Subsequently, the
respondent no. 4 after an evaluation process, informed the petitioner [OIL] vide
an Office Letter dated 11.01.2001 about payment towards surface compensation
in respect of the subject-land used by it for drilling locations [HNE/HNF, HNG,
DET and TH]. In turn, the petitioner [OIL] vide its Office Letter dated 07.02.2011
informed the respondent no. 5 to collect the payment. But the respondent no. 5
refused to accept the amount offered and took up the matter with the
respondent no. 4 demanding higher surface compensation.
9.
The respondent no. 5 had thereafter, instituted a number of writ petitions –
W.P.[C] no. 1680/2002, W.P.[C] no. 1681/2002, W.P.[C] no. 1721/2002 &
W.P.[C] no. 1722/2002 – challenging the legality and validity of the Right to User
status granted to the petitioner [OIL] by the respondent no. 4 under Rule 190
r/w Rule 189 of the Rules framed under Section 155[f] of the Regulation, 1886.
All those writ petitions were heard by a Division Bench of this Court. The four
writ petitions were disposed of by a common Judgment and Order dated
05.04.2011 with the following directions :-
[i]
The Deputy Commissioner, Tinsukia would take Immediate
steps [if not already taken] to initiate a process under the Land
Acquisition Act, 1894 for compensation thereunder vis-à-vis the land[s]
Page No.# 7 of 42
of the petitioner company involved in the instant proceeding and in
occupation of the respondent OIL.
[ii]
If meanwhile, the respondent OIL has not yet submitted its
proposal to the above effect, it would do so within two [2] weeks
herefrom with the Deputy Commissioner, Tinsukia, whereafter the said
authority would take steps in terms of Clause [i] as above.
[iii]
The Deputy Commissioner, Tinsukia would act strictly under the
provisions of the Assam [Sic] Land Acquisition Act, 1894, however, in
utmost expedition in view of the time lag in between. The initiation
would be done within three [3] weeks herefrom and it would be the
responsibility of the said authority to obtain the fresh proposal from the
respondent OIL, if in the meantime, though necessary, the same has
not been submitted.
[iv]
The Deputy Commissioner, Tinsukia would ensure that the
process of acquisition of the land is speeded up avoiding undue delay
therein. The parties, needless to say, would cooperate with the exercise
to be so undertaken.
[v]
The acquisition proceeding should be completed within a period
of six [6] months herefrom.
9.1.
In the course of argument in those four writ petitions, it was contended on
behalf of the petitioner therein, who is the respondent no. 5 herein, that the
acquisition of the subject-land if done, the compensation awardable should relate
to the period on and from which the same was initiated by a notification under
Section 4 of the Land Acquisition Act, 1894 and its claim with regard thereto for
the period prior to such proceeding would remain unattended. Taking note of the
same, the Hon’ble Division Bench considered it appropriate to permit the M/s
Nandlall & Son Tea Industries Pct. Ltd [the respondent no. 5] therein to lay its
claim for the subject-land for the period on and from which its possession was
taken over by the OIL till the initiation of the land acquisition proceeding under
the Land Acquisition Act, 1894. The Hon’ble Division Bench observed that if the
Page No.# 8 of 42
claim was made by the petitioner therein, the respondent no. 4 therein would
take a decision thereon after hearing both the parties and strictly in accordance
with law applicable thereto. The issue would be independent of the one for the
compensation under the Land Acquisition Act, 1894 and would be undertaken by
the respondent no. 4 parallelly and complete it within a period of three months
from the claim made by the petitioner therein. It was clarified that whatever
amount had, in the meanwhile, been paid by the OIL in favour of the petitioner
therein would be set-off against its claim admissible in law.
10.
It is clear that the matter of payment of surface compensation is independent of
the matter of acquisition of the subject-land. The present writ petition is only
concerned with the matter of acquisition of the subject-land and henceforth, the
discussion will proceed accordingly.
11.
After the Judgment and Order dated 05.04.2011, the respondent no. 4 called a
Meeting on 30.04.2011 to fix the rate of land value to be offered for both the
parcels of land. After a discussion with the representatives of the parties and
upon consideration of a Report of the Circle Officer, Tinsukia Revenue Circle as
regards the rate of land as per the latest sale deed, decisions were arrived at on
a nos. of issues and the decisions were recorded in the Minutes of the said
Meeting as under :-
In view of the above, the following decisions were taken in the meeting :
[1]
The rate of Rs. 10,07,872/- per Bigha for land in Semi Urban area
i.e. Hukanpukhuri Tea Estate was approved to comply with Hon’ble
Court’s order.
[2]
The rate was approved as a special case and will not be
applicable to other OIL related cases.
[3]
Any enhancement of rate at a later date after the approval of
Zonal valuation would have retrospective effect on this case provided Oil
India has not yet done the full payment of this matter to Deputy
Commissioner by that time.
Page No.# 9 of 42
12.
After the above decisions were arrived at in the Meeting held on 30.04.2011, the
respondent no. 4 had issued an Order on 03.05.2011 fixing the rate for per
Bigha of the subject-land in M/s Hukanpukhuri Tea Estate [falling within 3 KMs
from the notified town boundary of Tinsukia Town], under occupation of the
petitioner [OIL], and to be acquired by the petitioner [OIL] for oil exploration /
location / storage and any other purpose related to oil exploration, at Rs.
10,07,872/-. The Order also reflected the decisions recorded in the Minutes of
the Meeting, held on 30.04.2011. The terms and conditions of the Order dated
03.05.2011 were recorded as follows :-
The terms and conditions of the Order
The rate of Rs. 10,07,872/- per bigha for land in Semi Urban area i.e.
Hukanpukhuri Tea Estate was approved to comply with Hon’ble High
Court’s order.
The rate was approved as a special case and will not be applicable to
other OIL related cases.
Any enhancement of rate at a later date after the approval of Zonal
valuation would have retrospective effect on this case provided Oil India
has not yet done the payment to Deputy Commissioner, Tinsukia.
13.
In the meantime, the respondent no. 4 drew up land acquisition proceedings by
registering L.A. Case no. 192/2011 for the 1st parcel of land and L.A. Case no.
193/2011 for the 2nd parcel of land. After passing the Order dated 03.05.2011,
the respondent no. 4 also prepared two land acquisition estimates for acquisition
of the subject-land and forwarded them to the Government vide Office Letter no.
TRQ.1/95-2005/Pt-II/144 dated 07.05.2011 in respect of L.A. Case no. 192/2011
for the 1st parcel for land & Office Letter no. TRQ.1/95-2005/Pt-II/115 dated
07.05.2011 in respect of L.A. Case no. 193/2011 for the 2nd parcel of land.
14.
Being aggrieved by the rate of Rs. 10,07,872/- fixed per Bigha by the respondent
no. 4, the petitioner [OIL] submitted its objection to the respondent no. 4 vide
an Office Letter dated 18.05.2011 requesting the respondent no. 4 to review the
Page No.# 10 of 42
valuation of the land. The petitioner [OIL] objected on the point that the
procedure adopted by the respondent no. 4 for valuation of land for the two
parcels of land was not in accordance with the procedure prescribed by the Land
Acquisition Act, 1894.
15.
On 16.07.2011, the respondent no. 4 wrote the petitioner [OIL] in reference to
the rate already fixed, pursuant to the decisions taken in the Meeting held on
30.04.2011 and by the Order passed on 03.05.2011. It was mentioned that the
value of the land was fixed as per Valuation Report received from the Circle
Officer, Tinsukia Revenue Circle @ Rs. 4,06,400/- + 30% addl. compensation
under Section 23C of the L.A. Act @ Rs. 12,192/- + 12% damage under Clause
23 [1] of the L.A. Act @ Rs. 48,768/- + rent for use of the land for about 12
years @ Rs. 4,30,784/- [@ Rs. 35,000/- per year + addl. rent of Rs. 10,784/- for
addl. part year], together totaling Rs. 10,07,872/- only per Bigha. By the Letter
dated 16.07.2011, the respondent no. 4 requested the petitioner [OIL] to deposit
the amounts of Rs. 5,90,94,812/- for the 1st parcel of land and Rs. 39,26,405/for the 2nd parcel of land, which were calculated on the basis of the rate above.
16.
In the meantime, the Government of Assam in the Revenue & Disaster
Management Department issued two Notifications under Section 4 of the Land
Acquisition Act, 1894 [‘the LA Act’ or ‘the 1894 Act’, for short] in connection with
the two land acquisition proceedings, drawn up as L.A. Case no. 192/2011 & L.A.
Case no. 193/2011. The Notification dated 20.05.2011 was in connection with
L.A. Case no. 192/2011 for acquisition of the 1st parcel of land. The Notification
bearing no RLA.197/2011/7 dated 20.05.2011 was in connection with L.A. Case
no. 193/2011 for acquisition of the 2nd parcel of land. Both the Notifications were
issued invoking Section 17 [4] of the 1894 Act whereby the procedure prescribed
in Section 5A was dispensed with. Both the Notifications were published in the
Assam Gazette in Issue no. 254 dated 08.08.2011.
17.
Closely thereafter, the State Government published two Declarations under
Section 6 of the 1894 Act bearing nos. RLA.196/2011/9 pertaining to L.A. Case
no. 192/2011 and RLA.197/2011/9 pertaining to L.A. Case no. 193/2011 on the
Page No.# 11 of 42
same date, 17.09.2011 stating that both the parcels of land were to be taken by
the Government at public expense for a public purpose viz. for drilling location.
Both the Declarations were published in the Assam Gazette in Issue no. 351
dated 20.09.2011.
18.
The State Government in the Revenue & Disaster Management Department
conveyed its approval to the respondent no. 4 on the land acquisition estimates
amounting to Rs. 5,90,94,812/- for the 1st parcel of land involved in L.A. Case no.
192/2011 on 29.10.2011 and Rs. 39,26,405/- for the 2nd parcel of land involved
in L.A. Case no. 193/2011on 13.10.2011 and requested the respondent no. 4 to
take necessary action from his end.
19.
On receipt of the approval, the respondent no. 4 wrote to the petitioner [OIL],
on 17.11.2011, to deposit the amount of Rs. 39,26,405/- and, on 22.12.2011, to
deposit the amount of Rs. 5,90,94,812/- at an early date for taking further
necessary action from his end. The petitioner [OIL] claimed to have received the
Letter dated 16.07.2011 only on 05.11.2012 and apprising the said fact, it wrote
to the respondent no. 4 on 09.11.2012. Thereafter, challenging the Letter dated
16.07.2011 of the respondent no. 4, the petitioner [OIL] preferred a writ
petition, W.P.[C.] no. 5372/2013. During the pendency of the writ petition,
W.P.[C.] no. 5372/2013, the respondent no. 5 herein as the writ petitioner
preferred another writ petition, W.P.[C.] no. 587/2017 with a grievance that the
two parcels of land were taken away from it without payment of compensation.
20.
Both the writ petitions came up for consideration before the Court on
08.02.2017. The Court took note of the fact that initially, the two parcels of land
were taken over by the petitioner [OIL] on the strength of an Order dated
17.11.2000 for the purpose of carrying out drilling activities. As the two parcels
of land were permanently required by it, land acquisition proceedings were
drawn up vide L.A. Case no. 192/2011 and L.A. Case no. 193/2011. The Court
took also notice of the fact that though Notifications under Section 4 and
Declarations under Section 6 of the 1894 Act were issued, no further progress
Page No.# 12 of 42
was made in the land acquisition proceedings and no determination of the
compensation amounts had been made by the Land Acquisition Officer.
20.1. On 08.02.2017, both the writ petitions – W.P.[C.] no. 5372/2013 & W.P.[C.] no.
587/2017 – were disposed of by a common Order. As regards W.P.[C.] no.
587/2017, the Court took note of the fact that though land acquisition
proceedings were initiated vide L.A. Case no. 192/2011 and L.A. Case no.
193/2011 the petitioner therein, M/s Nandlall & Sons Tea Industries Pvt. Ltd.
[the respondent no. 5 herein] was not paid the compensation amount because
those proceedings were not completed. As agreed to by the parties, the writ
petition was disposed of with a direction to the Deputy Commissioner, Tinsukia –
cum – Land Revenue Officer to immediately proceed with the two land
acquisition proceedings, that is, L.A. Case no. 192/2011 and L.A. Case no.
193/2011 to bring them to their logical conclusion. It was directed that the
respondent no. 4 would arrive at a definite determination as to what
compensation was to be paid to M/s Nandlall & Sons Tea Industries Pvt. Ltd.
[the respondent no. 5 herein]. It was directed that the Deputy Commissioner,
Tinsukia shall bring the proceedings to conclusion by arriving at an appropriate
determination of the compensation amounts to be paid within a period of two
months from the date of receipt of the Order.
20.2. The Court having regard to the contents of the Letter dated 16.07.2011 of the
respondent no. 4 observed that the amounts of Rs. 5,90,94,812/- was fixed for
the 1st parcel of land involved in L.A. Case no. 192/2011 and Rs. 39,26,405/- was
fixed for the 2nd parcel of land involved in L.A. Case no. 193/2011, purportedly in
terms of the common Judgment and Order dated 05.04.2011. The Court took
note of the fact that the petitioner [OIL] took over the two parcels of land under
Rule 189 and Rule 190 of the Rules framed under Section 155[f] of the
Regulation, 1886. The Court also took note of the fact that in the writ petitions
wherein the common Judgment and Order was delivered on 05.04.2011, a
challenge was made by the land-owner [M/s Nandlall & Sons Industries Pvt. Ltd.]
as regards the taking over of the two parcels of land. The Coordinate Bench also
took notice of the fact that the Division Bench had closed the writ petitions
Page No.# 13 of 42
without interfering with the process of taking over of the two parcels of land, by
directing the respondent no. 4 to take a decision in accordance with the
applicable law. The writ petition, W.P.[C.] 5372/2013 was disposed with a
direction to the respondent no. 4 to revisit the provisions of the Letter dated
16.07.2011 and to arrive at a proper and due compensation payable to the
landowner by following due procedure of law.
21.
On 28.04.2017, the petitioner [OIL] wrote to the respondent no. 4 to cavass that
as per the zonal value, the land value should be Rs. 3,00,000/- per Bigha and Rs.
2,00,000/- per Bigha for tea and paddy land respectively involved in the process
of land acquisition. The fixation of the rate for the subject-land @ Rs.
10,07,782/- per Bigha was higher than the prevailing market rate and therefore,
there was a need to re-visit the rates mentioned in the Letter dated 16.07.2011
and to arrive at a proper and due compensation following due procedure of law.
22.
On 21.05.2017, the Deputy Commissioner, Tinsukia [the respondent no. 4]
passed the following order :-
GOVERNMENT OF ASSAM
OFFICE OF THE DEPUTY COMMISSIONER :::: TINSUKIA DISTRICT
[LAND ACQUISITION BRANCH]
No.TRQ.1/95-2005/PT.1/
Dated Tinsukia the 21st May,
ORDER
*
*
*
*
*
*
*
*
*
*
*
*
Whereas, both the parties has submitted their respective written statement in
support of their claims and objection in regard to the value of the land as
determined in the instant LA Case No. 17/2008 and examining the case
records of Land Acquisition Case No. 17/2008, the Oil India Limited has not
deposited the award amount till date, whatever be the amount nor ask any
Page No.# 14 of 42
time for depositing the award amount consistent with the record that the
Hukanpukhuri T.E. has not received any amount of award and hence as per
the provision of under Section 24 [2] it is decided that since Oil India Limited
has not deposited the award amount as per Section 11 of the LA Act 1894,
hence the proceeding drawn under provision of 1894, the same is deserved to
be lapsed. In this context, the views furnished by Govt. Pleader, Tinsukia has
also been seen.
In view of the above, further proceeding in the LA Case No. 192 and 193 of
2011 should be carried out as per provision of the new Act i.e. the Right to
Fair Compensation and Transparency in Land Acquisition, Rehabilitation and
Resettlement Act, 2013 and to calculate the amount of compensation
accordingly.
Let the parties concerned be informed accordingly. In the meantime, Land
Acquisition Branch of the D.C.'s Office, Tinsukia will prepare proposal
regarding quantum of compensation payable in accordance with the relevant
provision of the Right to Fair Compensation and Transparency in Land
Acquisition, Rehabilitation and Resettlement Act, 2013 within a month from
the date of passing this order for onward submission to the Government in the
Revenue & DM [LR] Department.
Deputy Commissioner Tinsukia
Dated Tinsukia the 21st May, 2017
23.
The petitioner [OIL] on 22.06.2017, submitted an objection against the decision
of the respondent no. 4 regarding his decision dated 21.05.2017 to process the
case under the Right to Fair Compensation and Transparency in Land
Acquisition, Rehabilitation and Resettlement Act, 2013 [‘the RFCTLARR Act’ or
‘the 2013 Act’, for short]. The same objection was reiterated in a subsequent
Letter dated 03.07.2017.
Page No.# 15 of 42
24.
The Government in the Revenue & Disaster Management Department vide an
Office Letter dated 25.07.2017, returned the award statements prepared and
submitted by the respondent no. 4 in L.A. Case no. 192/2011 and L.A. Case no.
193/2011 with a request to him to submit the same through the petitioner [OIL],
as it was the requiring body for the subject-land and a party in W.P.[C] no.
587/2017 [Nandlall & Sons Tea Industries Pvt. Ltd. vs. the State of Assam
and others] & W.P.[C] no. 2372/2013 [Oil India Limited vs. the State of
Assam and others], wherein the Order dated 08.02.2017 was passed by the
Court.
25.
The respondent no. 4 on 15.09.2017 and 19.09.2017, forwarded two award
statements prepared for amounts of Rs. 10,81,59,720/- and Rs. 71,84,939/- in
respect of the 1st parcel of land and 2nd parcel of land respectively in connection
with L.A. Case no. 192/2011 and L.A. Case no. 193/2011. It was mentioned that
the award statements were prepared following the direction made in the Order
dated 08.02.2017 and after going through the land acquisition case records and
the written statements submitted by both the parties and determining the
compensation amounts under the provisions of the 2013 Act.
26.
The petitioner [OIL] on 09.10.2017 had once again made objection to the
manner in which the award statements under the 2013 Act were prepared and
forwarded by the respondent no. 4. It its Letter addressed to the Revenue &
Disaster Management Department, Government of Assam, it had projected that
by the Order dated 08.02.2017, direction was made to re-visit the matter of
compensation in terms of the Letter dated 16.07.2011.
27.
Assailing the legality of the process undertaken by the respondent no. 4 for
assessment of compensation under the 2013 Act, the petitioner [OIL] had
preferred a writ petition, W.P.[C] no. 7797/2017. The Court while issuing notice
on 15.12.2017, passed an interim order staying the operation of the Order /
Letter dated 15.09.2017 of the respondent no. 4, till the returnable date. On
19.04.2018, on expression of difficulties faced by M/s Nandlall & Sons Tea
Industries Pvt. Ltd. [the respondent no. 5 herein] in clearing its provident fund
Page No.# 16 of 42
liabilities, the Court directed the petitioner [OIL] to deposit an amount of Rs.
1.50 Crore in the account of Assam Tea Employees Provident Fund Organization
within a period of one month. The amount of Rs. 1.50 Crore, as directed, was
deposited accordingly by the petitioner [OIL] on 18.05.2018.
28.
The writ petition, W.P.[C] no. 7797/2017 came to be disposed of by a Judgment
and Order dated 02.03.2023. The Court took notice of the distinction made in
two parts by the Division Bench - the first part being the stage prior to issuing
the Notification under Section 4 of the 1894 Act; and the other part being the
period subsequent to the issuance of Notification under Section 4 of the 1894
Act; and their determination independently. The Court also perused the records
produced by the learned State Counsel. Upon perusal of the records, the Court
observed that except an Order dated 03.05.2011, there was nothing in the case
record in the nature of an award under Section 11 of the 1894 Act. The Order
dated 03.05.2011 fixing the rate of Rs. 10,07,872/- per Bigha was held to be not
an award under Section 11 of the 1894 Act.
28.1. The relevant excerpts of the Judgment and Order dated 02.03.2023 are quoted
hereinbelow :-
12. A perusal of the records does not make it discernible that there
exists any award under Section 11 of the Act of 1894 which was made
prior to five years of the date of the Act of 2013 coming into force,
although a confusion may remain whether there is any such award in
existence, but atleast no award is discernible which may have been
made prior to five years of the date of the Act of 2013 coming into force,
which came into force 01.01.2014. As no award is available on record
that may have been made prior to five years of the date of the Act of
2013 coming into force, we are in agreement with the submission of the
learned senior counsel Mr. XXX that the provisions of Section 24 [2] of
the Act of 2013 would be inapplicable in the present case. As the
provisions of Section 24[2] of the Act of 2013 would be inapplicable, the
Page No.# 17 of 42
conclusion arrived at by the Deputy Commissioner, Tinsukia in its Order
dated 21.05.2017 would be unsustainable in law whereby a conclusion
is arrived that in view of the provision of Section 24[2] of the Act of 2013,
the earlier proceeding under Section 11 of the Act of 1894 had lapsed in
the meantime. But a further issue would remain whether there is any
award made by the Deputy Commissioner at all in the aforesaid
proceedings.
13. If the Deputy Commissioner upon perusal of his own records can
find out whether there exists an award which may have been made
under Section 11 of the Act of 1894, the provisions of Section 24[1][b] of
the Act of 2013 would be applicable and in such case, whatever award
is available on record, the same has to be brought to its logical end,
meaning thereby, that the beneficiaries of the land would have to make
the payment of the compensation to the land owners. If, on the other
hand, no award can be found out by the Deputy Commissioner, Tinsukia
from the records which may have been made under Section 11 of the
Act of 1894, the provisions of Section 24[1][a] would be made
applicable, meaning thereby, that the provisions of the Act of 2013
would be applicable in respect of the compensation that is to be made to
the land owner namely, Nandalal & Sons Tea Industries Private Ltd.
14. Accordingly, we direct the Deputy Commissioner, Tinsukia to look
into the records and arrive at its own fair conclusion. In the event, an
award under Section 11 of the Act of 1894 exists, the implication thereof
be followed so that the land owner receives the appropriate
compensation for the land that had been acquired, and if on the other
hand, the Deputy Commissioner, Tinsukia arrives at his conclusion that
no award had been made under Section 11 of the Act of 1894, the
provisions of Section 24[1][a] be made applicable and the process be
brought to its logical end.
Page No.# 18 of 42
15. […] But nevertheless, to arrive at the conclusion whether there
exists any award or not, a reasoned order be passed within a period of
one month of the receipt of the certified copy of this order and thereupon
bring the process to its logical end within a period of another two
months.
16. As regards the compensation to the land owner, for the period prior
to the issuance of the Section 4 notification, the Deputy Commissioner is
directed to expedite the process and make a determination and pass a
separate reasoned order within the period of three months as indicated
above from the date of receipt of the certified copy of this order.
29.
After the Judgment and Order dated 02.03.2023, the respondent no. 4 in
deference to the direction to pass a reasoned order, passed an Order on
13.04.2023. The relevant excerpts of the Order dated 13.04.2023 are quoted
hereinbelow :-
ORDER
*
*
*
*
*
*
*
*
*
[…] it is seen that the then Deputy Commissioner, Tinsukia vide letter
dated 16.07.2011 fixed the value of land and asked the OIL authorities
to deposit the value of compensation. Before issuing the letter dated
16.07.2011, Govt. approval should have been taken as enjoined in the
provision of Section 11 of LA Act, 1894. It is evident that the
proceedings of LA Act, 1894 has not been completed and disposed till
date. Any amount of compensation has not been paid in respect of the
said proceedings to the land owners except Rs 1.5 crores deposited in
the provident fund account of Assam Tea Employees Provident Fund
Organization as per the order dated 19.04.2018 passed by Hon'ble
Gauhati High Court in W.P.[C] no. 7797/2017.
Page No.# 19 of 42
*
*
*
*
*
*
*
*
*
Whereas, the proceedings in LA Case no. 192/11 and 193/11 are not
disposed, neither any payment as ordered by Deputy Commissioner,
Tinsukia has been deposited in the account of the land owners, as such
the Land Acquisition proceedings deemed to be lapsed as per the
provisions of section 24 of the Right to Fair Compensation and
Transparency in Land Acquisition, Rehabilitation and Resettlement Act,
2013.
In view of the above, it is decided upon that there were no awards
passed in LA case no. 192/2011 and 193/2011 as per Section 11 of LA
act 1894.
Further, the LA case no.192/2011 and 193/2011 will be proceeded as
per the provision of the Right to Fair Compensation and Transparency
in Land Acquisition, Rehabilitation and Resettlement Act, 2013 to
determine the compensation. Proposal to be prepared accordingly for
onward submission to the Revenue and Disaster Management
Department, Dispur, Assam.
30.
By observing that the land acquisition proceedings would proceed in accordance
with the 2013 Act, thereby, indicating clearly that Section 24[1][a] would be
applicable, the respondent no. 4 prepared revised awards under Section 30 of
the 2013 Act and on 27.05.2023, the petitioner [OIL] was informed regarding
the awards amounting to Rs. 20,89,67,500/- and Rs. 1,32,05,294/- respectively
in respect of L.A. Case no. 192/2011 and L.A. Case no. 193/2011, that is, for a
total amount of Rs. 22,21,72,794/-, which would be payable to the affected landowner, that is, the respondent no. 5.
31.
In the above backdrop, the petitioner [OIL] has preferred the present writ
petition seeking the following reliefs :-
Page No.# 20 of 42
1.
To issue a writ in the nature of Certiorari, setting aside and
quashing the impugned Order dated 13.04.2023 bearing Memo no.
TRQ.1/95-2005/PT.II/222 issued by the Deputy Commissioner,
Tinsukia, whereby, it was ordered that further proceeding in the L.A.
Case no. 192 and 193 of 2011 should be carried out as per provision
of the new Act i.e. the Right to Fair Compensation and Transparency
in Land Acquisition, Rehabilitation and Resettlement Act, 2013 and to
calculate the amount of land compensation accordingly;
2. To issue a writ in the nature of Certiorari, setting aside and quashing
the impugned Letter dated 27.05.2023 bearing Memo no. TRQ.1/952005/PT-II/235 issued by the Collector, Tinsukia, submitting the
impugned revised award estimate prepared under the new L.A. Act,
2013 of Rs. 22,21,72,794/- in both L.A. Case no. 192 of 2011 and L.A.
Case no. 193 of 2011 payable to the affected landowner;
3.
To issue a writ in the nature of Mandamus, declaring the
existence of an award in terms with Section 11 of the Land Acquisition
Act, 1894 with regard to the L.A. Case no. 192 of 2011 and L.A. Case
no. 193 of 2011;
4.
To issue a writ in the nature of Mandamus, directing the
respondent authorities to allow the petitioner to tender the awarded
land compensation as per the Land Acquisition Act, 1894;
and/or, pass such further order/orders as your Lordship may deem fit
and proper in the facts and circumstances of the case.
32.
I have heard Mr. M.K. Choudhury, learned Senior Counsel assisted by Mr. K.
Kalita, learned counsel for the petitioner; Mr. J. Handique, learned Standing
Counsel, Revenue & Disaster Management Department, Government of Assam
for the respondent nos. 1 – 3; Mr. D. Nath, learned Senior Government
Advocate, Assam for the respondent no. 4; and Ms. G. Goswami, learned counsel
for the respondent no. 5.
Page No.# 21 of 42
33.
Mr. Choudhury, learned Senior Counsel appearing for the petitioner has
submitted that the Deputy Commissioner prepared land acquisition estimate
proposals on 07.05.2011 for L.A. Case no. 192/2011 and L.A. Case no. 193/2011
and forwarded them to the State Government. The State Government had, in
turn, approved the land acquisition estimate amounts of Rs. 5,90,94,812/- for
L.A. Case no. 192/2011 on 29.10.2011 and Rs. 39,26,405/- for L.A. Case no.
193/2011 on 13.10.2011. Thereafter, the Deputy Commissioner, by Letter dated
17.11.2011 and Letter dated 22.12.2011, wrote to the petitioner [OIL] to deposit
the two amounts. By referring to such facts, Mr. Choudhury has contended that
there were awards under Section 11 of the 1894 Act and those were valid and
operative. He has submitted that the observations recorded by the Deputy
Commissioner on the Order dated 13.04.2023 were perverse and arbitrary.
33.1. The learned Senior counsel has submitted that in addition to the amount of Rs.
1.50 Crore deposited earlier, the petitioner [OIL] deposited a further sum of Rs.
9.00 Crore pursuant to an interim Order dated 16.06.2023 passed in the present
petition. According to him, the respondent no. 5 had already received a part of
the amount of Rs. 1.50 crore in the provident fund account as per this Court’s
Order dated 19.04.2018 passed in W.P.[C] no. 7797/2017. Meaning thereby, the
respondent no. 5 had already received more than the awards. As a total amount
of Rs. 10.50 Crore had already been deposited by the petitioner [OIL] against
the awards, there cannot be any process for assessment of compensation under
Section 24[1][a] of the 2013 Act, and therefore, the impugned Order dated
13.04.2023 is unsustainable in law.
33.2. It is further contended by him that the Collector had acted mechanically to hold
that no awards existed and the same was in total ignorance of the previous
Letter dated 07.05.2011 whereby proposals for land acquisition estimates were
forwarded, which received Government approvals on 13.10.2011 and 29.10.2011
respectively. By the Collector’s Letter dated 17.11.2011, the petitioner [OIL] was
directed to deposit the awarded amounts for both the land acquisition cases.
Page No.# 22 of 42
33.3. It is further submitted that after a challenge made to the Letter dated
16.07.2011 in W.P.[C] no. 5372/2013, the Court had directed the Deputy
Commissioner to revisit the matter of compensation. This Court had already
clarified in its Judgment and Order dated 02.03.2023 that the relevant provisions
of the 2013 Act would be applicable if there was no existence of any award. As
there were already awards under Section 11 of the 1894 Act, therefore, the
provisions of the 2013 Act would be applicable only prospectively. In view of
such obtaining fact situation, the petitioner [OIL] is entitled to the reliefs sought
for in this writ petition.
33.4. Mr. Choudhury has referred to the decision of the Constitution Bench of the
Hon’ble Supreme Court in Indore Development Authority vs. Manoharlal and
others etc., [2020] 8 SCC 129, to buttress his submissions. He has also referred
to the decisions in Delhi Development Authority vs. Damini Wadhwa and
others, [2022] 10 SCC 519; Assam Industrial Development Corporation
Limited vs. Gillapukri Tea Company Limited and others, [2021] 3 SCC 388 ;
and Delhi Development Authority vs. Jagan Singh and others, [2024] 20 SCC
609.
33.5. By referring to the afore-cited authorities, it has been submitted that the
proceedings under the 1894 Act could not have been held to have lapsed. He
has highlighted that the petitioner [OIL] has been in possession of the subjectland since 27.11.2000 after the subject-land was handed over to it. As the aspect
of the petitioner [OIL]’s possession of the subject-land and deposit of Rs. 10.50
Crores are not in dispute, there is no question of applicability of Section 24[1][a]
of the 2013 Act in the present case.
34.
The stand of the Collector/Deputy Commissioner, Tinsukia [the respondent no.
4] has been brought in an affidavit filed on 29.08.2024 and Mr. Nath has
submitted in similar lines. The respondent no. 4 has stated that records of L.A.
Case no. 192/2011 as well as L.A. Case no. 193/2011 were thoroughly
scrutinized and it did not reveal existence of any award made on or before
31.12.2013 or on or after 01.04.2014 under Section 11 of the 1894 Act. It is
Page No.# 23 of 42
stated that Notifications under Section 4 of the 1894 Act were issued on
20.05.2011 and were published in the Assam Gazette on 08.08.2011.
Declarations under Section 6 of the 1894 Act were issued on 16.09.2011 and
17.09.2011 respectively and were published in the Assam Gazette on
20.09.2011.
34.1. It is further mentioned that when after fixation of gross value of the subject-plot
@ Rs. 10,07,827/- per Bigha, the petitioner [OIL] was requested to deposit the
amounts of Rs. 5,90,94,812/- in connection with L.A. Case no. 192/2011 and Rs.
39,26,405/- in connection with L.A. Case no. 193/2011 by the Office Letter dated
07.05.2011, no deposit was made by the petitioner [OIL]. Instead, the
subsequent Office Letter dated 16.07.2011 was challenged in W.P.[C] no.
5372/2013. When by the Order dated 08.02.2017, direction was made to revisit
the provisions of the Letter dated 16.07.2011 for arriving at a proper and due
compensation, the matter was duly examined and it was observed that the
proceedings drawn under the 1894 Act had lapsed for applicability of the
provisions of Section 24 [1][b] as well as Section 24[2] of the 2013 Act and
accordingly, it was decided that further proceedings would be carried out as per
the provisions of Section 24 [1][a] of the 2013 Act and calculation would have to
be made accordingly. The revised estimates were accordingly forwarded to the
Government for approval. But, the same were returned with the instruction to
submit the same through the petitioner [OIL] it being the requiring body.
Accordingly on 15.09.2017, the same were forwarded to the petitioner [OIL].
The petitioner [OIL] obtained an interim stay on the Office Letter dated
15.09.2017 on 15.12.2017 in the writ petition, W.P.[C] no. 7797/2017, preferred
by it.
34.2. When the writ petition was finally disposed of on 02.03.2023 with certain
observations and directions, the Deputy Commissioner had once again gone
through the records of L.A. Case no. 192/2011 and L.A. Case no. 193/2011 and
came to a conclusion that there were no awards made under Section 11 of the
1894 Act in the said two cases and it was again decided to proceed as per the
provisions of 2013 Act. Accordingly, the Order dated 13.04.2023 was passed and
Page No.# 24 of 42
steps were taken for preparation of award proposals. Thereafter, revised awards
were prepared as per the provisions of 2013 Act amounting to Rs.
20,89,67,500/- for L.A. Case no. 192/2011 and Rs. 1,32,05,294/- for L.A. Case
no. 193/2011. By Office Letter dated 27.05.2023, those revised awards were
submitted to the petitioner [OIL] for necessary action. It is mentioned that by a
Notification dated 07.04.2022, the State Government has delegated the powers
to the District Collector to act as the Appropriate Government in their respective
territorial jurisdiction and therefore, the revised awards are to be considered as
approved by the State Government. It is stated that after carrying out all the
required exercise in compliance of the Judgment and Order dated 02.03.2023,
the Order dated 31.04.2023 has been passed.
34.3. Apart from the deposit of Rs. 1.50 Crores by the petitioner [OIL] in terms of the
direction made in the Order dated 19.04.2018 passed in W.P.[C] no. 7797/2017,
the petitioner [OIL] deposited the said amount. Thereafter, the petitioner [OIL]
deposited another amount of Rs. 9.00 Crores pursuant to an Order dated
16.06.2023 passed in the present writ petition at an interim stage and after the
deposit, the amount was released in favour of the respondent no. 5 on
24.08.2023.
35.
Ms. Goswami, learned counsel appearing for the respondent no. 5, that is, the
land owner has made submissions in support of the impugned Order dated
13.04.2023 and the revised awards submitted on 27.05.2023. While supporting
the stand of the State respondents, Ms. Goswami has submitted that as the preconditions laid down in the provisions of the 1894 Act were not present, the
submission advanced on behalf of the petitioner as regards existence of an
award is misconceived. Similarly, the submission advanced on behalf of the
petitioner as regards fulfilment of the conditions of possession and deposit is also
misconceived. The issue has already been addressed in the Judgment and Order
dated 02.03.2023 and the petitioner [OIL] had also accepted the said position.
Therefore, the only issue which remained for examination was whether the
process was required to be carried forward in terms of Section 24 [1][a] or in
terms of Section 24 [2][b] of the 2013 Act.
Page No.# 25 of 42
35.1. Elaborating further, Ms. Goswami has submitted that prior to the Notification
dated 07.04.2022 of the Revenue & Disaster Management Department,
Government of Assam, the situation was different in that the jurisdictional
District Collector was required to obtain approval from the State Government for
the approval under the 1894 Act and also, under the 2013 Act and, therefore,
only an award made with the approval of the State Government can be termed
as final award. As per the provisions of the Assam Land Acquisition Manual,
which was recognized in the case of Gillapukri Tea Company Limited [supra],
the preliminary estimate was to be submitted by the Collector in the prescribed
format, Form-5 whereas the award was to be submitted by the Collector in
Form-15. The respondent no. 4 on 07.05.2011 forwarded preliminary estimates
to the State Government in Form-5 only and there was no submission of awards
in Form-15. Therefore, the State Government had accorded approval to the
preliminary estimates submitted in Form-5 only and there was no approval to the
awards in Form-15. Therefore, it cannot be contended by the petitioner that
there was existence of an award as per Section 11 of the 1894 Act.
35.2. It is further contended that the awards prepared and submitted by the
respondent no. 4 on 15.09.2017 and 19.09.2017 in Form-X in terms of Rule 36
of the Assam Right to Fair Compensation and Transparency in Land Acquisition,
Rehabilitation and Re-Settlement Rules, 2015 [‘the Assam RFCTLARR Rules’, for
short] was not final. As the petitioner [OIL] as the requiring body who was to
express opinion on the market value, objected to it and due to the amount
involved, the award required prior approval of the State Government before
declaration. As the award in Form-X did not receive approval of the State
Government, the award was not final.
36.
I have given due consideration to the submissions of the learned counsel for the
parties and I have also gone through the materials brought on record by the
parties through their pleadings.
Page No.# 26 of 42
37.
By stressing on the possession of the petitioner [OIL] on the subject-land since
27.11.2000 and the deposit of Rs. 10.50 Crores made during the process, the
prime ground urged on behalf of the petitioner [OIL] in the present case is that
in view of the interpretation given to the provisions of Section 24 of the 2013 Act
in Indore Development Authority [supra], the present case could not have
proceeded under Section 24[1][a] of the 2013 Act. It is the case of the petitioner
[OIL] that it had legal possession of the subject-land, there were awards made
under Section 11 of the 1894 Act and it had paid a sum of Rs. 10.50 Crores to
the land owner towards compensation. Even if it is assumed that compensation
has not been paid, then also, the legal possession of the subject-land is not in
dispute. In case possession has been taken with the awards made and even if
compensation has not been paid, then there is no lapse of the land acquisition
proceedings by virtue of Section 24[1][b] and Section 24 [2] of the 2013 Act.
38.
Therefore, it is appropriate to quote Section 24 of the 2013 Act for ready
reference. Section 24 reads as under :-
24. Land acquisition process under Act No. 1 of 1894 shall be deemed to
have lapsed in certain cases.–
[1] Notwithstanding anything contained in this Act, in any case of land
acquisition proceedings initiated under the Land Acquisition Act,
1894,—
[a] where no award under Section 11 of the said Land Acquisition Act
has been made, then, all provisions of this Act relating to the
determination of compensation shall apply; or
[b] where an award under said Section 11 has been made, then such
proceedings shall continue under the provisions of the said Land
Acquisition Act, as if the said Act has not been repealed.
[2] Notwithstanding anything contained in sub-section [1], in case of land
acquisition proceedings initiated under the Land Acquisition Act, 1894 [1
of 1894], where an award under the said Section 11 has been made five
years or more prior to the commencement of this Act but the physical
Page No.# 27 of 42
possession of the land has not been taken or the compensation has not
been paid the said proceedings shall be deemed to have lapsed and the
appropriate Government, if it so chooses, shall initiate the proceedings
of such land acquisition afresh in accordance with the provisions of this
Act :
Provided that where an award has been made and compensation in
respect of a majority of land holdings has not been deposited in the
account of the beneficiaries, then, all beneficiaries specified in the
notification for acquisition under Section 4 of the said Land Acquisition
Act, shall be entitled to compensation in accordance with the provisions
of this Act.
39.
Section 24 [1][a] of the RFCTLARR/2013 Act, with the non-obstante clause, has
laid down that in case of land acquisition proceedings initiated under the
LA/1894 Act no award was made under Section 11 of the 1894 Act, then all the
provisions of the 2013 Act relating to the determination of compensation would
apply. Section 24 [1][b] of the 2013 Act has prescribed that in case of any land
acquisition proceedings initiated under the 1894 Act, where an award under
Section 11 of the 1894 Act has been made, then such land acquisition
proceedings would continue under the provisions of the 1894 Act, as if the 1894
Act has not been repealed. Section 24 [1][b] has, thus, contemplated that such
pending land acquisition proceedings, as on the date on which the 2013 Act
came into force, would continue and would have to be taken to their logical end.
40.
Section 24 of the 2013 Act, more particularly, sub-section [2] thereof, has come
up for consideration and interpretation before a Constitution Bench of the
Hon’ble Supreme Court in Indore Development Authority [supra]. The
Constitution Bench has observed that an exception to Section 24 [1][b] of the
2013 Act has been provided in Section 24 [2] in case of pending proceedings : in
case where the award has been made five years or more prior to the
commencement of the 2013 Act, the physical possession of the land has not
been taken, or the compensation has not been paid, the proceeding shall be
Page No.# 28 of 42
deemed to have lapsed, and such proceedings cannot continue as per the
provisions of 24 [1][b] of the 2013 Act. There are twin requirements : firstly,
physical possession has not been taken and, secondly, compensation has not
been paid. The question that has been posed by the Constitution Bench to
answer is whether the conditions are cumulative i.e. both are to be fulfilled, for
lapsing of acquisition proceedings, or the conditions are in the alternative [‘either
/ or’].
41.
To answer, the following questions from the provisions of Section 24 [2] of the
RFCTLARR/2013 Act came up for interpretation :-
5.1. [i] Whether the word ‘or’ in Section 24 [2] of the 2013 Act used in
between possession has not been taken or compensation has not
been paid to be read as ‘and’?
5.2. [ii] Whether the proviso to Section 24 [2] of the 2013 Act has to be
construed as part thereof or the proviso to Section 24 [1][b]?
5.3. [iii] What meaning is to be given to the word ‘paid’ used in Section 24[2]
and ‘deposited’ used in the proviso to Section 24 [2]?
5.4. [iv] What are the consequences of payment not made?
5.5. [v] What are the consequences of the amount not deposited?
5.6. [vi] What is the effect of a person refusing to accept the compensation?
41.1. The Constitution Bench has answered the questions, which are quoted
hereunder :-
366.1. Under the provisions of Section 24[1][a] in case the award is not made
as on 1.1.2014, the date of commencement of the 2013 Act, there is no
lapse of proceedings. Compensation has to be determined under the
provisions of the 2013 Act.
366.2. In case the award has been passed within the window period of five
years excluding the period covered by an interim order of the court,
Page No.# 29 of 42
then proceedings shall continue as provided under Section 24[1][b] of
the 2013 Act under the 1894 Act as if it has not been repealed.
366.3. The word ‘or’ used in Section 24[2] between possession and
compensation has to be read as ‘nor’ or as ‘and’. The deemed lapse of
land acquisition proceedings under Section 24[2] of the 2013 Act takes
place where due to inaction of authorities for five years or more prior to
commencement of the said Act, the possession of land has not been
taken nor compensation has been paid. In other words, in case
possession has been taken, compensation has not been paid then
there is no lapse. Similarly, if compensation has been paid, possession
has not been taken then there is no lapse.
366.4. The expression 'paid' in the main part of Section 24[2] of the 2013 Act
does not include a deposit of compensation in court. The consequence
of non-deposit is provided in the proviso to Section 24[2] in case it has
not been deposited with respect to majority of landholdings then all
beneficiaries [landowners] as on the date of notification for land
acquisition under Section 4 of the 1894 Act shall be entitled to
compensation in accordance with the provisions of the 2013 Act. In
case the obligation under Section 31 of the Land Acquisition Act, 1894
has not been fulfilled, interest under Section 34 of the said Act can be
granted. Non-deposit of compensation [in court] does not result in the
lapse of land acquisition proceedings. In case of non-deposit with
respect to the majority of holdings for five years or more, compensation
under the 2013 Act has to be paid to the ‘landowners’ as on the date of
notification for land acquisition under Section 4 of the 1894 Act.
366.5. In case a person has been tendered the compensation as provided
under Section 31[1] of the 1894 Act, it is not open to him to claim that
acquisition has lapsed under Section 24[2] due to non-payment or nondeposit of compensation in court. The obligation to pay is complete by
tendering the amount under Section 31[1]. The landowners who had
refused to accept compensation or who sought reference for higher
Page No.# 30 of 42
compensation, cannot claim that the acquisition proceedings had
lapsed under Section 24[2] of the 2013 Act.
366.6. The proviso to Section 24[2] of the 2013 Act is to be treated as part of
Section 24[2], not part of Section 24[1][b].
366.7. The mode of taking possession under the 1894 Act and as
contemplated under Section 24[2] is by drawing of inquest report/
memorandum. Once award has been passed on taking possession
under Section 16 of the 1894 Act, the land vests in State there is no
divesting provided under Section 24[2] of the 2013 Act, as once
possession has been taken there is no lapse under Section 24[2].
366.8. The provisions of Section 24[2] providing for a deemed lapse of
proceedings are applicable in case authorities have failed due to their
inaction to take possession and pay compensation for five years or
more before the 2013 Act came into force, in a proceeding for land
acquisition pending with the authority concerned as on 1.1.2014. The
period of subsistence of interim orders passed by court has to be
excluded in the computation of five years.
366.9. Section 24[2] of the 2013 Act does not give rise to new cause of action
to question the legality of concluded proceedings of land acquisition.
Section 24 applies to a proceeding pending on the date of enforcement
of the 2013 Act, i.e., 1.1.2014. It does not revive stale and time-barred
claims and does not reopen concluded proceedings nor allow
landowners to question the legality of mode of taking possession to
reopen proceedings or mode of deposit of compensation in the treasury
instead of court to invalidate acquisition.
42.
The first issue for consideration is whether the present case comes under the
provisions of Section 24[2] of the 2013 Act of the proviso thereof. To make the
provisions of sub-section [2] of Section 24 of the 2013 Act applicable, the
foremost requirements are two :- firstly, there had to be an award under Section
11 of the 1894 Act; and secondly, such award had to be made five years or more
Page No.# 31 of 42
prior to the commencement of the 2013 Act. It is only when the above preconditions are fulfilled, the questions regarding possession of the land and
payment of compensation can be gone into.
43.
The 2013 Act came into force on and from 01.01.2014. The land acquisition
proceedings of L.A. Case no. 192/2011 and L.A. Case no. 193/2011 under the
provisions of the 1894 Act can be said to have commenced only on publication of
the two Notifications, dated 20.05.2011, issued under Section 4 of the 1897 Act
in the Assam Gazette on 20.09.2011. To bring the provisions of Section 24 [2] of
the 2013 Act into action, the award under Section 11 of the 1894 Act in the
concerned land acquisition proceeding was required to have been passed on or
before 01.01.2009, that is, five years prior to 01.01.2014. As the land acquisition
proceedings in L.A. Case no. 192/2011 and L.A. Case no. 193/2011 commenced
only in the year 2011, there is no question of applicability of Section 24 [2] of
the 2013 Act in the present case as no award under Section 11 of the 1894 Act
was possible before 01.01.2009.
44.
The award under Section 11 of the 1894 Act in Damini Wadhwa [supra] was
declared by the Collector on 17.06.1987. Physical possession of a substantial
portion of the acquired land was taken over thereafter. Possession of some
parcels of land could not be taken over because of the pending litigations and
even the compensation could not be deposited due to pending litigations. In
Jagan Singh [supra], the award under Section 11 of the 1894 Act was made on
18.06.1992 and the physical possession of the acquired land was taken over on
19.01.2006. It was in those facts and circumstances, the Hon’ble Supreme Court
has held that the concerned land acquisition proceedings did not lapse in view of
Section 24 [2] of the 2013 Act and the interpretation given by the Hon’ble
Supreme Court in Indore Development Authority [supra].
44.1. In the fact situation obtaining in the present case, the above two decisions are
not found applicable, as no award under Section 11 of the 1894 Act was possible
on or before 01.01.2009 in view of commencement of the land acquisition
proceedings only in the year 2011. In view of non-fulfillment of the conditions
Page No.# 32 of 42
precedent for passing of an award under Section 11 of the 1894 Act, due to
impossibility, the two conditions subsequent i.e. possession and payment do not
have any significance at all to make the provisions of Section 24[2] of the 2013
Act operational.
45.
It is also not open for the petitioner [OIL] to contend regarding non-lapse of the
acquisition proceeding in terms of Section 24 [2] of the 2013 Act in view of the
common Judgment and Order dated 24.03.2023. The petitioner [OIL] was the
writ petitioner in the writ petition, W.P.[C] no. 7797/2017, which was disposed of
by the said common Judgment and Order. It was pointed out by the learned
Senior Counsel appearing for the petitioner [OIL] therein that as per the records,
no such award was available which might have been made prior to five years of
the date on which the 2013 Act had come into force. The Court observed that a
perusal of the record did not make it discernible that there existed any award
under Section 11 of the 1894 Act which was made prior to five years of the date
the 2013 Act came into force. The Court observed that no award was discernible
which might have been made prior to five years of the date, 01.01.2014 when
the 2013 Act came into force. As no award was available on record that might
have been made prior to five years from 01.01.2014, the Court was in
agreement with the learned Senior Counsel appearing for the petitioner [OIL]
that the provisions of Section 24 [2] of the 2013 Act would be inapplicable in the
case. As the proviso to Section 24[2] is to be treated as part of Section 24[2]
only and not to Section 24[1][b], existence of an award prior to 01.01.2014 was
mandatory. In the absence of any such award, the aspects of possession and
deposit do not have any relevance for the purpose of Section 24 [2] as well as of
the proviso to Section 24 [2] of the 2013 Act.
46.
The petitioner [OIL] to urge its case has claimed to have legal possession of the
subject-land. As mentioned above, the petitioner [OIL] took over physical
possession of the subject-land with the right to use on 27.11.2000, pursuant to
the Order dated 17.11.2000 and the Corrigendum dated 21.11.2000 passed by
the respondent no. 4 in exercise of the powers vested in him under Rule 190 r/w
Rule 189 of the Rules framed under Section 155[f] of the Regulation, 1886. It is
Page No.# 33 of 42
required to find out about the nature of possession associated with the right to
use.
47.
Rule 155[f] of the Regulation, 1886 has empowered the State Governments to
make rules inter-alia for granting of licences of oil-wells and for payment of
consideration and the conditions on which such licences may be granted. In
exercise of the above powers, the State Government has framed a set of rules,
‘Rules framed under Section 155[f] regulating the entry by mining licensees on
settled land’. Rule 189 has inter alia empowered the Deputy Commissioner to
permit entry upon such land when the surface of such land is covered by a
prospecting licence or a petroleum exploration licence to the licensee, if such
land is in occupation of any person other than the licensee. Rule 189 has also
provided a power to the Deputy Commissioner to assess any damage or injury
which may be done by the licensee to the property of the occupier of the land or
of any other person and to direct the licensee to make deposit of an amount for
making payment to such occupier or other person. Rule 190 has empowered the
Deputy Commissioner to grant authority to a mining lessee to enter any land
when the surface of such land is covered by a mining lease and when such land
is in occupation of any person other than the lessee. With the grant of written
authority under Rule 190, the lessee can enter upon such land for carrying out
the conditions of the mining lease. Rule 190 has also provided for assessment of
any damage or injury which may be done by the lessee to the property of the
occupier of such land or of any other person and also the authority to make a
direction to the lessee to pay the amount so assessed. The issue which is
necessary to find out whether this kind of possession can be equated with the
possession envisaged in the 1894 Act.
48.
The other bone of contention among the parties also revolves around the issue
of applicability of the provisions of Section 24[1][b] of the 2013 Act. The said
issue is also dependent on the existence of an award under Section 11 of the
1894 Act. For the said purpose, a survey of few provisions of the 1894 Act would
be necessary to find out as to when an award under Section 11 of the said Act
Page No.# 34 of 42
can be said to have been made and when the possession of the acquired land
can be taken over.
49.
As per definition clause in Section 3 [ee] of the LA/1894 Act, the expression
‘Appropriate Government’ inter alia meant in relation to acquisition of land, the
State Government. This part of definition of ‘Appropriate Government’ is
applicable in the present case. Section 4 provided that whenever it appeared to
the Appropriate Government that any land in any locality was needed or was
likely to be needed for any purpose or for a company, a notification to that effect
was to be published in the Official Gazette and through other modes including in
two daily newspapers, as laid down therein. When the Appropriate Government
was satisfied, subject to compliance of other requisite formalities, that any
particular land was needed for a public purpose, or for a company, a declaration
under Section 6 was required to be made by the Secretary to such Government
or by an officer duly authorized to certify the order of the Appropriate
Government. It was also mandatory to publish the declaration under Section 6 in
the Official Gazette and in two daily newspapers. By Section 7, it was prescribed
that after the declaration, the Appropriate Government shall direct the Collector
to take order for acquisition of the land. It was mandatory under Section 9 to
serve notices upon the persons interested.
50.
It was laid down in Section 11 [1] of the 1894 Act that the Collector would
enquire into the objections, if any, submitted by any person interested pursuant
to a notice given under Section 9 and shall make an award under his hand inter
alia of the true area of the land, and the compensation which in his opinion
should be allowed for the land. A mandatory prescription was contained to the
effect that no award shall be made by the Collector under Section 11 [1] without
the previous approval of the Appropriate Government or of such officer as the
Appropriate Government had authorized in that behalf.
51.
It was laid down in Section 12 [1] of the 1894 Act that such award shall be filed
in the Collector’s office and shall, except as thereafter provided, be final and
conclusive evidence, as between the Collector and the persons interested,
Page No.# 35 of 42
whether they had respectively appeared before the Collector or not, of the true
area and value of the land. The Collector was required to give notice of his
award to such of the interested persons as mentioned in Section 12 [2]. After
the Collector had made an award under Section 11, he was authorized by
Section 16 to take possession of the land, which shall thereupon vest absolutely
in the Government, free from all encumbrances.
52.
It is clear from the prescription contained in Section 16 of the 1894 Act that the
land vest in the Government absolutely when possession is taken after the award
is made. Once an award is made and possession is taken, by virtue of Section 16
land vests absolutely in the State, free from all encumbrances. Vesting of land is
automatic on the happening of the two exigencies of passing award and taking
possession, as prescribed in Section 16. Once possession is taken under Section
16 of the 1894 Act, the owner of the land loses title to it and the Government
becomes the absolute owner of the land.
53.
In the considered view of the Court, the meaning of ‘possession’ which is
contemplated by Section 24[2] of the 2013 Act is possession after an award was
made under Section 11 of the 1894 Act. It is only after the Collector had made
an award under Section 11 of the 1894 Act, he could have assumed the power to
take possession of the land under Section 16 of the 1894 Act, which shall
thereupon vest in the Government, free from all encumbrances. Only when the
land had vested in the Government, it was possible to hand over possession of
the acquired land to the requiring body. By the Order dated 17.11.2000 and the
Corrigendum dated 21.11.2000, passed under Rule 190 r/w Rule 189 of the
Rules framed under Section 155[f] of the Regulation of 1886, the petitioner
[OIL] had got the Right of User only and by virtue of that right, it took cover
physical possession of the subject-land on 27.11.2000. But all throughout the
period since 27.11.2000, the ownership of the subject-land remained with the
land owner i.e. the respondent no. 5. In case of absence of any award under
Section 11 of the 1894 Act, the subject-land could not have been vested in the
State Government to hand over the possession of the subject-land to the
petitioner [OIL] in the manner as envisaged by the 1894 Act.
Page No.# 36 of 42
54.
The plea regarding existence of an award on the basis of the preliminary cost
estimates submitted by the respondent no. 4 in Form-5, which also received
Government approval on 13.10.2011 and 29.10.2011, is erroneous on the
ground, as evident from the Letter dated 16.07.2011, that it included an amount
towards rent for use of the subject-land for about twelve years to arrive at the
rate of Rs. 10,07,872/- per Bigha to arrive, in turn, at the amounts of Rs.
5,90,94,812/- and Rs. 39,26,405/- respectively. Such inclusion of rent is clearly
not in congruity with the direction made in the Judgment and Order dated
05.04.2011 [supra] to keep the issue of determination and payment of
compensation to the land owner prior to the commencement of land acquisition
proceeding under the 1894 Act independent.
55.
As per Paragraph 24 [c] of the Assam Land Acquisition Manual [‘the Acquisition
Manual’, for short], the Collector was required to submit the preliminary estimate
of cost of acquisition prepared for the land to be acquired in Form-5. Paragraph
64 of the Acquisition Manual contained a condition that no award shall be made
unless an estimate had been duly prepared and sanctioned. As per Paragraph 65
of the Acquisition Manual, the form prescribed for award was Form-15, which
should be written out, signed and dated before any payment was made. From
the decision of the Hon’ble Supreme Court in Gillapukari Tea Company
Limited [supra], it clearly emerges that the jurisdictional Collector was required
to seek prior approval in respect of both of the land acquisition estimate and the
award in prescribed Form-5 and Form-15 respectively. It was observed by the
Hon’ble Supreme Court that the format of Form-15 was the statutorily prescribed
form for a land acquisition Award under the Acquisition Manual. Finding that the
State Government accorded approval to the land acquisition estimate submitted
in Form-5 and also to the award submitted in Form-15 on 05.03.2010, the
Hon’ble Supreme Court in Gillapukari Tea Company has held that the award
stood approved. The Hon’ble Court has held that once the award was approved,
compensation was paid thereunder and possession of the land was handed over
to the Government, acquisition proceedings could not have been opened and
there was no question of lapsing under Section 24 of the 2013 Act.
Page No.# 37 of 42
56.
Reverting back to the facts of the case in hand, it is found that on 13.10.2011
and 29.10.2011, the State Government accorded approval to the preliminary
estimates submitted by the respondent no. 4 in statutorily prescribed Form-5 of
the Acquisition Manual towards probable cost of acquiring the 2nd parcel of land
involved in L.A. Case no. 193/2011 at Rs. 39,26,405/- and the 1st parcel of land
involved in L.A. Case no. 192/2011 at Rs. 5,90,94,812/-. It is the case of the
State respondents including the respondent no. 4, and the respondent no. 5 that
there was no submission of any award by the respondent no. 4 in the statutorily
prescribed Form-15 at any point of time and consequently, there was no
approval of the State Government to any award submitted in Form-15. In the
absence of any approval of the State Government to the award submitted in
statutory prescribed Form-15, there is no question of an award under Section 11
of the 1894 Act and there is also no question of application of Section 24[1][b]
as well as Section 24[2] of the 2013 Act in the present case. It is not the case of
the petitioner [OIL] that there was approval of the State Government to any
award prepared and submitted by the respondent no. 4 in Form-15 of the
Acquisition Manual at any point of time. Therefore, this Court finds itself in
agreement with the common stand taken by the State respondents, more
particularly, the respondent no. 4 in the impugned Order dated 13.04.2023, and
also that of the respondent no. 5 that there were no awards made under Section
11 of the 1894 Act in the year 2011.
57.
It was an admitted position on 08.02.2017, the date when the two writ petitions
– W.P.[C] no. 5372/2013 & W.P.[C] no. 587/2017 – were disposed of by a
common order, that there was no award under Section 11 of the 1894 Act on
that date. It was upon agreement of the parties, the writ petitions were disposed
of with a direction to the respondent no. 4 to proceed further with the land
acquisition proceedings of L.A. Case no. 192/2013 and L.A. Case no. 193/2013 to
bring those two proceedings to their logical ends by arriving at a definite
determination as regards the compensation required to be paid to the land
owner and by revisiting the provisions of the Letter dated 16.11.2011 submitted
by the petitioner [OIL]. Thereafter, in the Order dated 21.05.2017, the
Page No.# 38 of 42
respondent no. 4 recorded a view that further proceedings of L.A. Case no.
192/2013 and L.A. Case no. 193/2013 would be carried out under the 2013 Act.
58.
Thus, the other issue of which requires examination is whether the conditions
required not to proceed under Section 24 [1][a] of the 2013 Act exist in the
present case or not. For not to proceed in terms of Section 24 [1][b], existence
of an award under Section 11 of the 1894 Act is necessary. The respondent no. 4
after going through the entire records, as directed in the Judgment and Order
dated 02.03.2023, had recorded a finding in the Order dated 13.04.2023 that at
the time of issuing the Letter dated 16.07.2011, there was no prior Government
approval.
59.
It is pertinent to mention, at the cost of repetition, the prescription contained in
Section 24 [1][b] of the 2013 Act is to the effect that in a case of land acquisition
proceedings initiated under the 1894 Act, where an award under Section 11 has
been made then such proceedings would continue under the provision of the
1894 Act only, as if the 1894 Act has not been repealed. Section 11 of the 1894
Act contained a mandate that no award under Section 11 of the 1894 Act shall
be made by the Collector without the previous approval of the State Government
or of such officer as the State Government had authorized in that behalf.
60.
Land acquisition estimates under Section 23 of the 2013 Act read with Rule 36
[1] of the Assam RFCTLARR Rules were prepared and submitted by the
respondent no. 4 in prescribed Form-X on 15.09.2017 and 19.09.2017, to which
the petitioner [OIL] objected to it at first, and, later on, preferred the writ
petition, W.P.[C] no. 7797/2017. Rule 36 of the Assam RFCTLARR Rules has
made it mandatory for the Collector obtain prior approval of the State
Government before declaration of the award. With no prior approval accorded to
those land acquisition estimates submitted in Form-X, it cannot be held that
there was existence of any award.
61.
In view of the discussion made above and for the reasons recorded, it is,
therefore, evident that the land acquisition proceedings of L.A. Case no.
Page No.# 39 of 42
192/2011 and L.A. Case no. 193/2011 are required to be proceeded as per the
provisions of Section 24[1][a] of the 2013 Act. In view of failure on the part of
the petitioner [OIL] to establish that there was existence of awards in terms of
the Section 11 of the 1894 Act with regard to L.A. Case no. 192/2011 and L.A.
Case no. 193/2011, no direction in the nature of mandamus declaring existence
of such awards can be made. As a natural consequence, the land acquisition
proceedings, L.A. Case no. 192/2011 and L.A. Case no. 193/2011 have to be
brought to their conclusions by following the provision of Section 24[1][a] of the
2013 Act. Resultantly, the challenge made by the petitioner [OIL] to the Order
dated 13.04.2023 is found unmerited. Therefore, the first prayer and the third
prayer of the petitioner [OIL] are found to be without any merit.
62.
The petitioner [OIL] has also mounted a challenge to the Letter no. TRQ.1/952005/Pt.II/235 dated 27.05.2023. In such view of the matter, it requires an
examination about the authority and jurisdiction of the respondent no. 4 for
issuance of the Letter dated 27.05.2023.
63.
By the Letter dated 27.05.2023, the respondent no. 4 has forwarded revised
awards in Form-VII in respect of L.A. Case no. 192/2011 and L.A. Case no.
193/2011 to the petitioner [OIL]. The petitioner [OIL] has been informed that
pursuant to the Judgment and Order dated 02.03.2023 and on receipt of
Assessment Reports of land from the Circle Officer, Tinsukia Revenue Circle, the
revised awards amounting to Rs. 20,89,67,500/- for L.A. Case no. 192/2011 and
Rs. 1,32,05,294/- for L.A. Case no. 193/2011 have been made. The petitioner
[OIL] has been informed that an amount of Rs. 22,21,72,794/-, in total, is found
payable to the affected landowner and the revised awards have been submitted
for its necessary action.
64.
Sub-section [2] of Section 15 of the 2013 Act has empowered the Collector to
prepare a report on the approximate cost of land acquisition for the decision of
the Appropriate Government. Rule 24 of the Assam RFCTLARR Rules has
provided that the Collector shall prepare an estimate of an approximate cost of
land acquisition as required under Section 15[2] of the 2013 Act, on the basis of
Page No.# 40 of 42
the components defined in Clause [i] of Section 3 of the said Act, in Form-VII.
Section 19[1] of the RFCTLARR/2013 Act r/w Rule 27[1] of the Assam RFCTLARR
Rules has prescribed that the State Government upon receipt of such a report,
has to issue a declaration in terms of Section 19[4] read with Rule 27[2] in
prescribed Form-VIII. As per the Second Proviso to sub-section [2] of Section 19,
no such declaration shall be made unless the requiring body deposits an amount
in full or part, as may be prescribed by the Appropriate Government towards the
cost of acquisition of the land. The Third Provisio to sub-section [2] of Section 19
has provided that the requiring body shall deposit the complete amount so as to
enable the Appropriate Government to publish a declaration and such
declaration, as per Section 19[6], shall be conclusive evidence that the land is
required for a public purpose, and after making such declaration, the Appropriate
Government may acquire the land in the manner prescribed under the 2013 Act.
65.
The definition of ‘Appropriate Government’ has been provided in Section 3 [e] of
the 2013 Act. ‘Appropriate Government’ in relation to acquisition of land situated
within the territory of a State, is the State Government. It has been provided
that in respect of a public purpose in a District for an area not exceeding such as
may be notified by the Appropriate Government, the Collector of such District
shall be deemed to be the Appropriate Government.
66.
The State Government in the Revenue & Disaster Management Department
issued a Notification no. RLA.300/2013/Pt./160 on 07.04.2022, which was
published in the Assam Gazette in its Issue no. 287 dated 27.04.2022. The said
Notification was issued in exercise of the powers conferred by the proviso to
clause [e] of Section 3 of the 2013 Act read with Rule 2 [1][d] of the Assam
2013 Rules and of all other enabling powers in that behalf. By the Notification
dated 07.04.2022, the State Government has appointed the District Collectors of
the districts, except the Sixth Scheduled areas, as the ‘Appropriate Government’
in relation to acquisition of any extent of land for a public purpose within the
jurisdiction of the respective district under the provision of 2013 Act.
Page No.# 41 of 42
67.
In view of the powers conferred by the Notification dated 07.04.2022, the
respondent no. 4 on and from 07.04.2022 has been vested with the authority
and jurisdiction to act as the Appropriate Government in respect of the subjectland. In view of such authority and jurisdiction, the respondent no. 4 is not
required to obtain any prior approval from the State Government with regard to
any award prepared and finalized by him, which stood forwarded to the
petitioner [OIL] on 27.05.2023. By virtue of the powers conferred by the
Notification dated 07.04.2022, it will be the respondent no. 4 as the Collector
who will only issue the declaration, mentioned above, after compliance of the
provisions mentioned hereinabove by him as well as the petitioner [OIL] as the
requiring body, so as to proceed for acquisition of the subject-land.
68.
Section 26 [1] of the 2013 Act has outlined the criteria which the Collector shall
adopt in assessing and determining the market value of the land to be acquired.
Section 26 [2] has prescribed that the market value calculated as per Section 26
[1] shall be multiplied by a factor specified in the first Schedule. Section 30 has
provided for award of Solatium. As per sub-section [1] of Section 30, the
Collector having determined the total compensation to be paid, shall, to arrive at
the final award, impose a ‘Solatium’ amount equivalent to one hundred percent
of the compensation amount. Section 30 [3] requires the Collector to award an
amount calculated at the rate of twelve percent per annum on such market value
for the period from the date of commencement of the original notification till the
date of the award of the Collector or the date of taking possession of the land,
whichever is earlier.
69.
In the award submitted in Form-VII on 27.05.2023, which is under Section 30 of
the 2013 Act, the respondent no. 4 is found to have determined the market
value of the land under Section 26[1] of the 2013 Act. To the market value the
factor [1.2] has been added under Section 26[2]. In the award, the respondent
no. 4 has added the Solatium amount as per Section 30[1] and the interest
component as per Section 30[2] of the 2013 Act, apart from other components
like administrative cost, etc. It is thereafter, the final award amounts of Rs.
20,89,67,500/- and Rs. 1,32,05,294/- have been determined.
Page No.# 42 of 42
70.
As no specific challenge has been made by the petitioner [OIL] with regard to
the manner of determination of the award amounts by the respondent no. 4
under the provisions of the 2013 Act, other than the authority and jurisdiction of
the respondent no. 4 to proceed under Section 24[1][a] of the 2013 Act, a
discussion on determination of the award amounts is not necessary.
71.
As the respondent no. 4 is found to have the authority and jurisdiction to issue
the Letter dated 27.05.2023 along with Form-VII; and the same is found to have
been issued following the requisite procedure; this Court finds no merit in the
challenge made by the petitioner [OIL] as regards the authority and jurisdiction
of the respondent no. 4 to forward such awards in exercise of the powers
conferred by the provisions of the 2013 Act; the Assam RFCTLARR Rules and the
Notification dated 07.04.2022, as discussed hereinabove. This Court, therefore,
does not find any reason to make any interference to the Letter dated
27.05.2023 whereby awards which require no prior previous approval of the
State Government, have been submitted by the respondent no. 4 as the
jurisdictional Collector to the petitioner [OIL] as the requiring body to make
payment of the awarded amounts for the two parcels of land, which the
petitioner [OIL] is seeking to acquire for its drilling activities. Consequently, the
second prayer is also rejected.
72.
In view of the discussion and the observations made, the reasons recorded, and
the findings reached at, as above, the present writ petition is found to be devoid
of merit and therefore, the writ petition is liable to be dismissed. The writ
petition is therefore, dismissed. Interim order, if any, passed earlier stands
recalled. There shall, however, be no order as to cost.
JUDGE
Comparing Assistant
Date: 2026.06.10 00:46:23
+05'30'
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review