Constitutional

Mrs. Rekha Devi vs Bank of Baroda

Add to a compilation

Keep judgments in folders, mark the paragraphs you rely on, and print a compilation with an index. It comes with the Research and Advocate Pro judgment plans and with a campus licence. Sign in · See the plans

Court
Karnataka High Court
Date
17 August 2026
Case No.
WP 30854/2025
Result
Disposed
Bench
Suraj Govindaraj
Cite this judgment
Citation
Link for your website or blog
Cite the court's own record or the law report in court filings.

The court's order

The closing paragraphs of the judgment, in the court's own words. The reasons are in the full text below.

14. 3. In view of the above observations, this Court passes the following: (i) Writ Petition is allowed (ii) A Mandamus is issued; the respondents are directed to impose the rate of interest for housing loan and not impose the interest - 28 HC-KAR NC: 2026:KHC:44148 WP No. 30854 of 2025 CNR: KAHC010651092025 considering the same as commercial loan; and (iii) A Mandamus is issued; the respondent bank is directed to adjust the interest already collected under commercial rate of interest towards the regular housing loan and restructure the loan account as per housing loan schedule from the date of sanction of loan during the tenure of the loan. Sd/(SURAJ GOVINDARAJ) List No.: 1 Sl No.: 28

Filed under

Constitution of India Article 226, Constitution of India Article 227, Constitution of India

The sections, explained

The law this judgment cites

Opens the section on Law Maker (lawmaker.in), our sister site for law students.

Full Judgment Text

Text read from the judgment PDF published on the High Court's eCourts portal, through the Indian High Court Judgments open data set (Dattam Labs, CC BY 4.0). The court's own copy is the authoritative text.

-1HC-KAR NC: 2026:KHC:44148 WP No. 30854 of 2025 CNR: KAHC010651092025 IN THE HIGH COURT OF KARNATAKA AT BENGALURU DATED THIS THE 17TH DAY OF AUGUST, 2026 BEFORE THE HON'BLE MR. JUSTICE SURAJ GOVINDARAJ WRIT PETITION NO. 30854 OF 2025 (GM-RES) BETWEEN: Digitally signed by SHWETHA RAGHAVENDRA Location: HIGH COURT OF KARNATAKA 1. MRS. REKHA DEVI, S/O. MR. DILIP KUMAR, AGED ABOUT 49 YEARS, 2. MRS. SEEMA DEVI, W/O. MR. HANSMUKH KUMAR, AGED ABOUT 45 YEARS, 3. MRS. SEEMA, W/O. MR. CHANDRAPRAKASH JAIN, AGED ABOUT 41 YEARS, 4. MR. SUNIL KUMAR S/O. MR. LADULAL JAIN, AGED ABOUT 35 YEARS, 5. MR KAMALESH JAIN S/O MR LADULAL JAIN AGED ABOUT 33 YEARS ALL ARE RESIDENTS OF NO.46, 8TH MAIN, SHAKAMBARI NAGAR, JP NAGAR 1ST PHASE, BENGALURU - 560 078. … PETITIONERS (BY SRI. PARAMESWARAPPA C., ADVOCATE) AND: 1. BANK OF BARODA REPRESENTED BY BRANCH MANAGER. BANASHANKARI BRANCH, -2HC-KAR NC: 2026:KHC:44148 WP No. 30854 of 2025 CNR: KAHC010651092025 NO.334/22, 41ST CROSS, 8TH BLOCK, JAYANAGAR, BENGALURU - 560 082. … RESPONDENT (BY SRI. SHETTY VIGNESH SHIVARAM., ADVOCATE) THIS W.P. IS FILED UNDER ARTICLES 226 AND 227 OF THE CONSTITUTION OF INDIA, PRAYING TO DIRECT THE RESPONDENT TO IMPOSE THE RATE OF INTEREST FOR HOUSING LOAN AND NOT IMPOSING THE INTEREST CONSIDERING THE SAME AS COMMERCIAL LOAN AND ETC. THIS PETITION, COMING ON FOR PRELIMINARY HEARING IN 'B' GROUP, THIS DAY, ORDER WAS MADE THEREIN AS UNDER: CORAM: HON'BLE MR. JUSTICE SURAJ GOVINDARAJ ORAL ORDER 1. The petitioners are before this Court seeking for the following reliefs: (a) Issue a writ of Mandamus directing the respondent to impose the rate of interest for housing loan and not imposing the interest considering the same as commercial loan; and (b) Issue a writ of Mandamus directing the respondent bank to adjust the interest already collected under commercial rate of interest towards the regular housing loan and restructure the loan account as per housing loan schedule from the date of sanction of loan; (c) Pass such other orders or issue such other directions as this Hon'ble Court deems fit in the facts and circumstances of the case in the interest of justice and equity. -3HC-KAR NC: 2026:KHC:44148 WP No. 30854 of 2025 CNR: KAHC010651092025 2. The petitioners approached the respondent-Bank for a composite loan for two purposes, namely, (i) purchase of a residential site; and (ii) construction of a residential building thereon. The respondent-Bank sanctioned a composite loan of Rs.1,40,00,000/-, comprising Rs.70,00,000/- towards purchase of the site and Rs.70,00,000/- towards construction of the building. 3. The stated purpose of the loan was accordingly the purchase of a residential site and the subsequent construction of a residential building thereon. Pursuant to such sanction, the petitioners received the first tranche of Rs.70,00,000/- and purchased the property under a registered sale deed dated 16.03.2016. 4. Thereafter, the petitioners submitted an application before the competent Authority seeking sanction of the building plan. The application came to be rejected on the ground that the subject site fell within the buffer zone under the Revised Master Plan, (RMP-2015). The petitioners consequently pursued the matter with the concerned Authorities. -4HC-KAR NC: 2026:KHC:44148 WP No. 30854 of 2025 CNR: KAHC010651092025 5. As the building plan was not sanctioned, the petitioners were constrained to approach this Court in W.P.No.20133/2022. The said writ petition came to be disposed of by a Co-ordinate Bench of this Court by order dated 30.01.2025. The Co-ordinate Bench held that layouts/sites formed prior to 2007, i.e., prior to the date on which the RMP-2015 came into force, would not be governed by the buffer-zone restriction and consequently directed the BDA to consider and sanction the building plan without insisting upon the buffer-zone requirement. 6. While the aforesaid proceedings were pending, the respondent-Bank, purporting to exercise its power under Clause under the heading “Towards Construction of House” contained in the terms and conditions of sanction, commenced levying interest at the commercial rate on the loan on the ground that construction of the residential building had not been completed within a period of 36 months. The said Clause 2, which is material for consideration of the controversy, is extracted hereunder for ready reference: “2. On plan sanction by the competent authority construction of house on the site financed by the bank will have to be completed with overall period of 36 -5HC-KAR NC: 2026:KHC:44148 WP No. 30854 of 2025 CNR: KAHC010651092025 months recokoned from the date of the first drawal of the loan for purchase of site, otherwise Bank will charge commercial rate of interest for the proposed loan from the date of first release. An affidavit-cum undertaking from the borrower regarding the compliance with sanctioned plan and adherence to the terms and conditions of the same should be obtained.” 7. Even prior to the order passed by the Co-ordinate Bench and thereafter, the petitioners had been approaching the respondent-Bank requesting that commercial-rate interest not be levied, contending that the delay in commencement and completion of construction was not attributable to them. According to the petitioners, the delay was occasioned by the BDA’s refusal to sanction the building plan on the ground that the subject property fell within the buffer zone introduced under the RMP-2015. The petitioners accordingly contended that they ought not to be subjected to the levy of interest at the commercial rate for a circumstance beyond their control. As the respondent-Bank did not accede to the said request, the petitioners have approached this Court seeking the aforesaid reliefs. 8. Sri Parameshwarappa, petitioners is that: learned counsel for the -6HC-KAR NC: 2026:KHC:44148 WP No. 30854 of 2025 CNR: KAHC010651092025 8.1. The petitioners cannot be attributed any blame for the delay in commencement and completion of the construction. They were at all times ready and willing to commence and undertake the construction of the residential building. Their bona fides are evident from the fact that immediately upon sanction and disbursement of the first tranche of Rs.70,00,000/- towards purchase of the site, the petitioners purchased the property under a registered sale deed dated 16.03.2016. Thereafter, they promptly applied for sanction of the building plan. The failure to sanction the plan was a matter wholly beyond the control of the petitioners and, consequently, the resultant delay cannot be attributed to them. 8.2. The petitioners, it is submitted, pursued all remedies available to them and ultimately succeeded in W.P.No.20133/2022, wherein the Co-ordinate Bench directed the BDA to consider and sanction the building plan without insisting upon the buffer-zone restriction. Thus, even assuming that Clause 2 extracted hereinabove required the construction to be completed within the stipulated period, the delay in the -7HC-KAR NC: 2026:KHC:44148 WP No. 30854 of 2025 CNR: KAHC010651092025 present case cannot be construed as arising from any deliberate, negligent or wanton disregard of the terms of the loan sanction by the petitioners. The delay was occasioned by the inability to secure sanction of the building plan on account of the policy adopted by the BDA and other Urban Development Authorities in applying the buffer-zone restriction under the RMP-2015 to the subject property. 9. Sri Vignesh Shetty, learned counsel for the respondent-Bank would submit that: 9.1. The respondent-Bank is not concerned with the delay occasioned on account of non-sanction of the building plan by the competent Authorities. Clause 2 of the terms sanction expressly petitioners were and conditions of stipulates required to that the complete the construction within 36 months from the date of first drawal of the loan amount towards purchase of the site. Since the petitioners failed to commence and complete the construction within the stipulated period, the respondentBank was entitled, in terms of the said clause, -8HC-KAR NC: 2026:KHC:44148 WP No. 30854 of 2025 CNR: KAHC010651092025 to levy interest at the commercial rate on the loan from the date of first release. 9.2. It is submitted that the action of the respondent-Bank is strictly in accordance with Clause 2 of the terms and conditions governing the sanction of the loan and, therefore, no illegality or infirmity can be attributed to such action. Learned counsel would further submit that the claim raised by the petitioners involves disputed and contractual matters which cannot appropriately be adjudicated in exercise of the writ jurisdiction of this Court under Articles 226 and 227 of the Constitution of India. 9.3. In this regard, he relies upon the decision of the Hon'ble Apex Court in Joshi Technologies International Inc. Vs. Union of India and Others1, more particularly para 55 thereof, which is reproduced hereunder for easy reference: “55. Law in this aspect has developed through catena of judgments of this Court and from the reading of these judgments it would follow that in pure contractual matters the extraordinary remedy of writ under Article 226 or Article 32 of the 1 (2015) 7 SCC 728 -9HC-KAR NC: 2026:KHC:44148 WP No. 30854 of 2025 CNR: KAHC010651092025 Constitution cannot be invoked. However, in a limited sphere such remedies are available only when the non-Government contracting party is able to demonstrate that it is a public law remedy which such party seeks to invoke, in contradistinction to the private law remedy simpliciter under the contract. Some of the case law to bring home this cardinal principle is taken note of hereinafter.” 9.4. By relying upon the decision in Joshi Technologies, his submission is that where the dispute arises purely out of contractual terms and conditions, the extraordinary jurisdiction of this Court under Article 226 of the Constitution ought not to be invoked. According to him, the grievance of the petitioners relates solely to the manner in which the terms and conditions of the loan sanction have been applied by the respondentBank and does not involve any public-law element. Consequently, it is submitted that the petitioners ought to be relegated to the remedy available before the competent Civil Court, if they seek to enforce or contest any rights arising under the loan agreement. 9.5. He relies upon the decision of the Hon’ble Apex Court in South Indian Bank Limited and Others Vs. Naveen Mathew Philip and - 10 HC-KAR NC: 2026:KHC:44148 WP No. 30854 of 2025 CNR: KAHC010651092025 Another2 more particularly paras 18 and 19 thereof, which are reproduced hereunder for easy reference: “18. While doing so, we are conscious of the fact that the powers conferred under Article 226 of the Constitution of India are rather wide but are required to be exercised only in extraordinary circumstances in matters pertaining to proceedings and adjudicatory scheme qua a statute, more so in commercial matters involving a lender and a borrower, when the legislature has provided for a specific mechanism for appropriate redressal. 19. Reiterating the concern expressed, the present appeals are disposed of. The Registry is directed to mark a copy of this order to the High Court of Kerala and the High Court of Punjab and Haryana. No costs.” 9.6. His submission again by relying on Naveen Mathew’s case is that notwithstanding the wide amplitude of the jurisdiction conferred under Article 226 of the Constitution, such jurisdiction is required to be exercised only in extraordinary circumstances, particularly in matters governed by a statutory adjudicatory mechanism. It is submitted that greater restraint is warranted in commercial matters involving a lender and a borrower, where the parties’ rights and obligations arise out of a 2 (2023) 17 SCC 311 - 11 HC-KAR NC: 2026:KHC:44148 WP No. 30854 of 2025 CNR: KAHC010651092025 contractual relationship and appropriate mechanisms are available for redressal of their grievances. Consequently, according to learned counsel, the present dispute, being essentially contractual and commercial in nature, does not warrant exercise of the extraordinary writ jurisdiction of this Court. 9.7. Learned counsel would further submit that the loan was sanctioned in the year 2016 and, in terms of the conditions of sanction, the construction was required to be completed within 36 months, i.e., by the year 2019. However, the petitioners approached this Court only in the year 2025, despite the respondentBank having commenced levy of interest at the commercial rate from the year 2020. It is therefore contended that the petition suffers from inordinate delay and laches and, on that ground also, the petitioners are not entitled to invoke the extraordinary jurisdiction of this Court. 9.8. On the aforesaid grounds, learned counsel for the respondent-Bank submits that the writ - 12 HC-KAR NC: 2026:KHC:44148 WP No. 30854 of 2025 CNR: KAHC010651092025 petition is devoid of merit and is liable to be dismissed. 10. Heard Sri Parameshwarappa C., learned counsel for the petitioners and Sri Vignesh Shetty, learned counsel for respondent. Perused papers. 11. The points that would arise for determination are: 1) Whether the respondent-bank was right in levying a commercial rate of interest in the peculiar facts and circumstances? 2) Whether this court is required to exercise extraordinary powers under Articles 226 and 227 of the Constitution of India in the present matter? 3) 12. What order? Answer to point No.1: Whether the respondentbank was right in levying a commercial rate of interest in the peculiar facts and circumstances? 12.1. Sri. Vignesh Shetty, learned counsel appearing for the respondent-Bank, has placed reliance upon Clause 2 under the heading “Towards - 13 HC-KAR NC: 2026:KHC:44148 WP No. 30854 of 2025 CNR: KAHC010651092025 Construction of House” contained in the terms and conditions governing sanction of the loan. His contention is that the relationship between the parties arises out of a commercial loan transaction and is governed by the contractual terms agreed between them. According to him, the respondent-Bank has merely acted in accordance with the said contractual stipulation and, consequently, the levy of interest at the commercial rate cannot be faulted. 12.2. There can be no dispute with the general proposition that the relationship between a lender and borrower is ordinarily contractual in nature and that the rights and obligations of the parties are governed by the terms of the loan transaction. Equally, however, the respondent-Bank, though engaged in commercial activities, is an instrumentality discharging public functions and is expected to act fairly, reasonably and in accordance with the principles of non-arbitrariness. Consequently, in an appropriate case, where the facts warrant such intervention, this Court is not precluded from exercising its jurisdiction under Articles 226 and 227 of the Constitution. - 14 HC-KAR NC: 2026:KHC:44148 WP No. 30854 of 2025 CNR: KAHC010651092025 12.3. In the peculiar facts of the present case, the conduct of the petitioners assumes considerable significance. Immediately upon sanction and disbursement of the first tranche of the loan, the petitioners purchased the subject property under a registered sale deed dated 16.03.2016. The loan itself was a composite loan, sanctioned partly for acquisition of the site and partly for construction of a residential building thereon. Thereafter, the petitioners promptly applied for sanction of the building plan. 12.4. The respondent-Bank, before sanctioning a composite loan for acquisition of the property and construction thereon, would necessarily have examined the title and relevant particulars of the property. The Bank was thus aware, or ought reasonably to have been aware, of the location and nature of the property. It is significant that, at the time of sanction of the loan, the respondent-Bank did not raise any objection as to the suitability of the property for construction or indicate that any statutory or regulatory impediment existed which would prevent the proposed construction. - 15 HC-KAR NC: 2026:KHC:44148 WP No. 30854 of 2025 CNR: KAHC010651092025 12.5. The sanction of a composite loan comprising a specific component towards construction proceeds on the premise that the property is capable of being utilised for the purpose for which the loan is sanctioned. In the present case, neither the petitioners nor, apparently, the respondent-Bank was aware, at the time of sanction of the loan or at the time of purchase of the property, of the subsequent impediment that would arise in obtaining sanction of the building plan on account of the buffer-zone restriction under the RMP-2015. 12.6. The subsequent inability to obtain sanction was therefore not reasonably a have circumstance been which anticipated by could the petitioners at the time of entering into the loan transaction. 12.7. This Court can also take judicial notice of the background in which the issue relating to buffer zones arose. Pursuant to the proceedings before the Hon’ble National Green Tribunal in Forward Foundation Vs. State of Karnataka (O.A.No.224/2014), directions came to be issued requiring maintenance of buffer zones in - 16 HC-KAR NC: 2026:KHC:44148 WP No. 30854 of 2025 CNR: KAHC010651092025 respect of properties falling within the areas in question. Consequent thereto, the Authorities declined to sanction building plans even in respect of certain layouts which had been formed prior to the coming into force of the RMP-2015 on 24.06.2007. This resulted in considerable litigation before this Court, which ultimately held, in several matters, that the restrictions flowing from the aforesaid proceedings would not apply to layouts/sites formed prior to the coming into force of the RMP-2015. 12.8. The significance of this background is that, when the loan was sanctioned and when the petitioners applied for sanction of the building plan, it could not reasonably have been presumed that the plan would subsequently be rejected on the ground of the buffer-zone restriction. Had such an impediment been known or reasonably foreseeable, the very sanction of a construction component of the composite loan would have required reconsideration. The subsequent refusal of the Authorities to sanction the plan was thus not - 17 HC-KAR NC: 2026:KHC:44148 WP No. 30854 of 2025 CNR: KAHC010651092025 attributable to any act or omission on the part of the petitioners 12.9. The conduct of the petitioners throughout has also been bona fide and above board. Having purchased the disbursement property of the immediately first tranche, upon the petitioners proceeded to obtain sanction of the building plan. When such sanction was denied, they pursued the matter before the concerned Authorities and Court W.P.No.20133/2022. in thereafter approached The said for proceedings remained pending approximately three and years this ultimately culminated in an order dated 30.01.2025 in favour of the petitioners, whereby the Coordinate Bench directed the BDA to consider sanction of the plan without insisting upon the buffer-zone restriction. 12.10. Thus, the petitioners cannot be said to have remained inactive or to have deliberately delayed construction. On the contrary, the material on record demonstrates that they took steps to overcome the impediment created by the refusal of the Authorities to sanction the - 18 HC-KAR NC: 2026:KHC:44148 WP No. 30854 of 2025 CNR: KAHC010651092025 building plan and pursued the available legal remedies. The consequently delay in occasioned construction by was circumstances beyond their control. 12.11. These circumstances were brought to the notice of the respondent-Bank. Once the Bank was apprised of the circumstances which prevented the petitioners from commencing construction within the stipulated period, the Bank was required to consider the matter in its proper factual perspective rather than mechanically applying the stipulation relating to levy of interest at the commercial rate. A contractual stipulation cannot be considered in isolation from the circumstances in which its operation is sought to be enforced, particularly when the consequence sought to be imposed is attributable not to any default or deliberate omission on the part of the borrower, but to an external regulatory impediment. 12.12. The respondent-Bank, being an instrumentality discharging public functions, is expected to act fairly and reasonably in its dealings with its customers. The fact that the transaction is - 19 HC-KAR NC: 2026:KHC:44148 WP No. 30854 of 2025 CNR: KAHC010651092025 commercial in character does not authorise the Bank to disregard demonstrate that circumstances the which petitioners were prevented from complying with the construction timeline for reasons wholly beyond their control. The Bank was therefore required to consider whether invocation of the commercialrate stipulation, in the peculiar circumstances of the case, would result in an unfair and inequitable consequence. 12.13. The Court is conscious that it is not sitting in appeal over the contractual terms agreed between the parties, nor is it rewriting the loan agreement. The question is narrower: whether, in the peculiar facts of the present case, the respondent-Bank was justified in mechanically imposing the penal consequence contemplated by Clause 2 when the petitioners had taken all reasonable steps to commence construction but were prevented from doing so by an impediment created by the Authorities and were thereafter diligently pursuing their legal remedies. - 20 HC-KAR NC: 2026:KHC:44148 WP No. 30854 of 2025 CNR: KAHC010651092025 12.14. On consideration of the aforesaid circumstances, this Court is of the considered view that the petitioners cannot be faulted for the delay in construction. They had purchased the property promptly upon disbursement of the first tranche, applied for sanction of the building plan, pursued the matter with the Authorities and, upon failure to obtain the necessary sanction, approached this Court and ultimately succeeded in W.P.No.20133/2022. The impediment to construction was thus not attributable to any default, negligence or deliberate inaction on their part. 12.15. The restriction which prevented construction was subsequently held not to operate against the petitioners’ property by the order dated 30.01.2025 passed by the Co-ordinate Bench in W.P.No.20133/2022. In such circumstances, the respondent-Bank ought to have taken into account the intervening regulatory impediment and the bona fide conduct of the petitioners before invoking Clause 2 and levying interest at the commercial rate. - 21 HC-KAR NC: 2026:KHC:44148 WP No. 30854 of 2025 CNR: KAHC010651092025 12.16. Accordingly, Point No.1 is answered in favour of the petitioners, holding that, in the peculiar facts and circumstances of the present case, the respondent-Bank was not justified in levying interest at the commercial rate merely on the ground that the construction had not been completed within the period stipulated in Clause 2 of the terms and conditions of sanction. 13. Answer to point No.2: Whether this court is required to exercise extraordinary powers under Articles 226 and 227 of the Constitution of India in the present matter? 13.1. The reliance placed by Sri. Vignesh Shetty, learned counsel appearing for the respondentBank, upon the decisions in South Indian Bank Limited v. Naveen Mathew Philip and Another and Joshi Technologies International Inc. v. Union of India and Others cannot be disputed. The principles enunciated therein as to the exercise of writ jurisdiction in contractual and commercial matters are well settled. Ordinarily, where the dispute arises purely out of a contractual - 22 HC-KAR NC: 2026:KHC:44148 WP No. 30854 of 2025 CNR: KAHC010651092025 relationship, particularly where adjudication involves disputed questions of fact or where an efficacious alternative remedy is available, this Court would exercise restraint in invoking its extraordinary jurisdiction under Articles 226 and 227 of the Constitution. 13.2. At the same time, the jurisdiction conferred upon this Court under Articles 226 and 227 is of wide amplitude. The limitation in exercise of such jurisdiction in contractual matters is essentially a rule of self-imposed restraint and judicial discretion, and not one of want of jurisdiction. The existence of a contractual relationship, by itself, does not operate as an absolute bar against the exercise of writ jurisdiction. Where the facts are undisputed, the question raised is capable of determination on the material available on record and the action complained of has the potential of resulting in an arbitrary or unreasonable consequence, this Court may, in an appropriate case, exercise its jurisdiction notwithstanding the contractual nature of the dispute. - 23 HC-KAR NC: 2026:KHC:44148 WP No. 30854 of 2025 CNR: KAHC010651092025 13.3. The question, therefore, is not merely whether the dispute arises out of a loan transaction, but whether the determination of the grievance raised by the petitioners requires adjudication of disputed questions of fact warranting relegation of the parties to an alternative forum. In the present case, as noticed while answering Point No.1, there is no such disputed question of fact which requires adjudication by a Civil Court. 13.4. The material facts are substantially undisputed. The composite loan was sanctioned for purchase of the property as well as construction thereon; the first tranche was disbursed; the petitioners purchased the property; they thereafter applied for sanction of the building plan; sanction was not granted on account of the buffer-zone restriction; the petitioners pursued the matter before the Authorities and thereafter approached this Court in W.P.No.20133/2022; and the said writ petition ultimately came to be disposed of by order dated 30.01.2025. The question arising for consideration is essentially whether, in these admitted circumstances, the respondent-Bank - 24 HC-KAR NC: 2026:KHC:44148 WP No. 30854 of 2025 CNR: KAHC010651092025 was justified in invoking Clause 2 and levying interest at the commercial rate. 13.5. That question has already been answered while considering Point No.1. The conclusion arrived at by this Court is that the delay in construction was not attributable to the petitioners and that, in the peculiar circumstances of the case, the respondent-Bank ought not to have imposed the consequence contemplated under Clause 2 by levying interest at the commercial rate. 13.6. In such circumstances, relegating the petitioners to a Civil Court merely because the underlying transaction is contractual would serve no meaningful purpose. The controversy does not require examination of complicated evidence or resolution of disputed questions of fact. It concerns the application of an otherwise undisputed contractual stipulation to a set of circumstances which are borne out by the material on record and are substantially undisputed. 13.7. The rule of self-imposed restraint governing the exercise of writ jurisdiction is intended to - 25 HC-KAR NC: 2026:KHC:44148 WP No. 30854 of 2025 CNR: KAHC010651092025 ensure that the extraordinary jurisdiction of this Court is not routinely invoked in matters for which ordinary statutory or contractual remedies are available. It cannot, however, be elevated into an inflexible rule that prevents this Court from intervening even where the facts are clear, the issue is capable of determination on the existing record and the action complained of warrants correction in exercise of the constitutional jurisdiction of this Court. 13.8. The present case falls within that limited category. The petitioners have been subjected to levy of interest at the commercial rate for a delay which, on the facts noticed hereinabove, was not occasioned by any default or inaction on their part. The petitioners had pursued the remedies available to them and ultimately succeeded in obtaining an order removing the impediment to sanction of the building plan. To decline interference solely on the ground that the transaction is contractual would, in the peculiar facts petitioners of being the case, subjected result in to financial a the - 26 HC-KAR NC: 2026:KHC:44148 WP No. 30854 of 2025 CNR: KAHC010651092025 burden which this Court has already found to be unjustified. 13.9. This Court is therefore of the considered view that the circumstances of the present case warrant exercise of the extraordinary jurisdiction under Articles 226 and 227 of the Constitution. The applicable contractual to self-imposed and restraint commercial disputes does not operate as a bar in the facts of the present case. 13.10. Accordingly, Point No.2 is answered in the affirmative, holding that the nature of the dispute and the peculiar and undisputed facts of the present case warrant exercise of the extraordinary jurisdiction of this Court under Articles 226 and 227 of the Constitution of India. 14. Answer to point No.3: What order? 14.1. In the above circumstances, in view of the submission made by the counsel for the petitioners that the petitioners would obtain necessary plan sanction within three months from now and commence construction of the - 27 HC-KAR NC: 2026:KHC:44148 WP No. 30854 of 2025 CNR: KAHC010651092025 property, the respondent is restrained from levying commercial rate of interest post the petitioners obtaining such plan sanction. On the petitioners obtaining the plan sanction and commencing the construction, the terms and conditions of the sanction Memo dated 09.02.2016 would be applicable and the release of the monies would be subject to the conditions as detailed therein. 14.2. The commercial rate of interest which has been levied from the year 2020 till now shall be appropriately reworked and adjusted over the remaining tenure of the loan. 14.3. In view of the above observations, this Court passes the following: ORDER (i) Writ Petition is allowed (ii) A Mandamus is issued; the respondents are directed to impose the rate of interest for housing loan and not impose the interest - 28 HC-KAR NC: 2026:KHC:44148 WP No. 30854 of 2025 CNR: KAHC010651092025 considering the same as commercial loan; and (iii) A Mandamus is issued; the respondent bank is directed to adjust the interest already collected under commercial rate of interest towards the regular housing loan and restructure the loan account as per housing loan schedule from the date of sanction of loan during the tenure of the loan. Sd/(SURAJ GOVINDARAJ) JUDGE KTY List No.: 1 Sl No.: 28

This page is for informational and research purposes only and does not constitute legal advice. Consult a qualified advocate for advice specific to your situation.

Is your name in this judgment and should it be masked, or is something on this page wrong? Request a review

All Karnataka HC judgments →

Banking & Finance advocates near the Karnataka High Court

Dealing with a similar matter? Send a free enquiry to advocates who handle it. Fees are agreed with the advocate directly.

All Banking & Finance advocates in India