HIGH COURT OF CHHATTISGARH AT BILASPUR
SHARMA
ALOK
Date:
SHARMA 2026.08.20
11:55:18
+0530
WPC No. 4302 of 2026
Mdd Medical System India Pvt. Ltd. Through Its Authorised Representative
Being Rakesh Singh Having Registered Office At Santram Complex, Block L3, Mahilapur Extension, New Delhi And Corporate Office At Plot No. 125,
Udyog Vihar, Phase-1, Gurgaon
... Petitioner(s)
versus
1 - Hindustan Prefab Limited Jangupra, New Delhi – 110014
2 - Union Of India Through The Secretary Ministry Of Housing And Urban
Affairs Nirman Bhawan, Rajpath Area, Central Secretariat, New Delhi 110001
... Respondent(s)
(Cause-title taken from Cause Information System)
For Petitioner(s)
: Smt. Krishna Saroff, Advocate (through virtual
mode), and Mr. Praveen Kumar Tulsyan,
Advocate.
For Respondent No. 2.
: Mr. Rishabh Deo Singh, Advocate.
Hon'ble Shri Ramesh Sinha, Chief Justice
Hon'ble Shri Ravindra Kumar Agrawal, Judge
Order on Board
Per Ramesh Sinha, Chief Justice
19/08/2026
1.
Heard Smt. Krishna Saroff, Advocate (through virtual mode) and Mr.
Praveen Kumar Tulsyan, learned counsel for the petitioner. Also heard Mr.
Rishabh Deo Singh, learned counsel appearing for the respondent No. 2.
2.
By this petition under Article 226 of the Constitution of India, the
petitioner seek for the following relief(s):
“10.1 Issue an appropriate writ, order or direction, more
particularly in the nature of mandamus, directing
Respondent No. 1 to forthwith release and pay to the
Petitioner the admitted, crystallized and undisputed
outstanding amount of Rs. 27,29,083/- as duly
acknowledged and arising out of the concluded
contract;
10.2 Issue an appropriate writ, order or direction
directing Respondent No. 1 to pay interest on the
aforesaid amount at the contractual rate of 7.5% per
annum with annual compounding, or in the alternative
at such rate as this Hon'ble Court may deem fit and
proper, from the date the amount became due and
payable till the date of actual realisation;
10.3 Further direct that the Petitioner shall be entitled
to interest till the date of actual payment/realisation,
and any delay beyond the period fixed by this Hon'ble
Court shall carry further interest at an enhanced rate,
so as to ensure full restitution and prevent unjust
enrichment of Respondent No. 1;
10.4 Issue an appropriate writ, order or direction
directing the Respondents to act in a fair, reasonable,
and non-arbitrary manner in discharge of their public
law obligations and restraining them from withholding
admitted and undisputed contractual dues of the
Petitioner;
10.5 Pass an interim order, pending disposal of the
present petition, directing Respondent No. 1 to
forthwith
deposit
the
admitted
amount
of
Rs.
27,29,083/- before this Hon'ble Court or, in the
alternative, directly release the said amount to the
Petitioner within time-bound period.
10.6 Award costs of the present proceedings in favour
of the Petitioner and against the Respondents; and
10.7 Grant any other relief(s) which this Hon'ble Court
may deem fit and proper in the facts and circumstances
of the case, including costs of the petition.”
3.
The brief facts of the case that the petitioner, MDD Medical Systems
India Private Limited, is engaged in the business of supply, installation,
testing and commissioning of specialised medical equipment and systems.
Respondent No.1 issued NIT dated 31.03.2018 for supply, installation, testing
and commissioning of a Medical Gas Pipeline System and equipments for the
100-bedded ESIC Hospital at Raipur, Chhattisgarh, pursuant to which the
petitioner was declared the successful bidder and awarded the work vide
Work Order dated 05.05.2018 for Rs.1,25,14,900/-, which was subsequently
enhanced to Rs.2,09,68,712/- on account of approved deviated and extra
items. The petitioner duly completed the work on 30.03.2019 and raised the
requisite RA/final bills; however, an amount of Rs.27,29,083/- remained
outstanding despite repeated requests and representations. Clause 9 of the
General Rules and Directions forming part of the tender conditions provides
for payment of the final bill within the prescribed period and further stipulates
payment of interest at the rate of 7.5% per annum, compounded annually, in
case of delayed payment. Although Respondent No.1 sought certain
documents in connection with a GST communication, the petitioner duly
furnished the requisite documents on 13.02.2025. Thereafter, Respondent
No.1 itself issued a Performance/Completion Certificate dated 24.03.2026,
certifying satisfactory completion of the work by the petitioner, yet failed to
release the admitted outstanding dues. The petitioner had earlier approached
the Hon'ble High Court of Delhi by filing W.P.(C) No.7793/2026, which, vide
order dated 29.05.2026, granted liberty to the petitioner to approach the
jurisdictional forum. Hence, the present writ petition has been filed under
Article 226 of the Constitution of India seeking a direction to Respondent
No.1 to release the admitted amount of Rs.27,29,083/- along with contractual
interest at the stipulated rate till the date of actual realization.
4.
Learned counsel for the petitioner submits that the present petition has
been filed seeking release of the admitted and undisputed outstanding
amount of Rs.27,29,083/- payable by Respondent No.1 towards the work
duly executed and completed by the petitioner. It is submitted that the
petitioner has fully performed its contractual obligations and the same has
been
duly
acknowledged
by
Respondent
No.1
by
issuing
the
Performance/Completion Certificate dated 24.03.2026, certifying satisfactory
completion of the work. Despite such categorical acknowledgment,
Respondent No.1 has failed to release the outstanding dues, which is
arbitrary, unreasonable and violative of Article 14 of the Constitution of India.
Learned counsel further submits that the contractual conditions specifically
provide for payment of interest at the rate of 7.5% per annum, compounded
annually, in the event of delayed payment of the final bill. It is further
submitted that the existence of a contractual relationship or availability of an
alternative remedy does not constitute an absolute bar to exercise of writ
jurisdiction, particularly when the claim is admitted and undisputed and the
action of a State instrumentality is arbitrary and unreasonable. Learned
counsel submits that in the present case there is no disputed question of fact
requiring elaborate adjudication, as the petitioner's entitlement is evident from
the
contractual
records,
bills,
correspondence
and
the
Performance/Completion Certificate issued by Respondent No.1 itself. It is
therefore submitted that Respondent No.1 cannot unjustifiably withhold the
admitted dues after accepting and certifying satisfactory completion of the
work. Learned counsel accordingly prays that Respondent No.1 be directed
to forthwith release the admitted outstanding amount of Rs.27,29,083/-, along
with contractual interest at the stipulated rate from the date the amount
became due till the date of actual realization.
5.
Learned counsel appearing for Respondent No.2 submits that the
present writ petition is not maintainable as the entire claim of the petitioner
relates to the alleged non-payment of contractual dues by Respondent No.1,
Hindustan Prefab Limited. It is submitted that Respondent No.2 has neither
entered into any contract with the petitioner nor issued the Work Order in its
favour and, therefore, no liability can be fastened upon Respondent No.2 for
payment of the amount claimed by the petitioner. It is further submitted that
the dispute, if any, is purely contractual in nature and arises out of the terms
and conditions of the contract between the petitioner and Respondent No.1.
Respondent No.2 has no role in processing or releasing the petitioner's bills
or in determining the amount payable under the said contract. It is therefore
submitted that no specific cause of action has been disclosed against
Respondent No.2 and no relief is liable to be granted against it. Learned
counsel accordingly submits that the writ petition, insofar as Respondent
No.2 is concerned, deserves to be dismissed and Respondent No.2 may
kindly be deleted from the array of parties.
6.
We have learned counsel for the parties, perused the material annexed
with the petition.
7.
The Hon’ble Supreme Court in the case of Tata Motors Limited v
The
Brihan
Mumbai
Electric
Supply
&
Transport
Undertaking
(Best) and Others passed in Civil Appeal No. 3897 of 2023 vide
judgment dated 19.05.2023 held as follows :
“48. This Court being the guardian of fundamental rights is
duty-bound to interfere when there is arbitrariness,
irrationality, mala fides and bias. However, this Court has
cautioned time and again that courts should exercise a lot
of restraint while exercising their powers of judicial review
in contractual or commercial matters. This Court is normally
loathe to interfere in contractual matters unless a clear-cut
case of arbitrariness or mala fides or bias or irrationality is
made out. One must remember that today many public
sector
undertakings
compete
with
the
private
industry. The contracts entered into between private
parties are not subject to scrutiny under writ jurisdiction. No
doubt, the bodies which are State within the meaning of
Article 12 of the Constitution are bound to act fairly and are
amenable to the writ jurisdiction of superior courts but this
discretionary power must be exercised with a great deal of
restraint and caution. The courts must realise their
limitations and the havoc which needless interference in
commercial matters can cause. In contracts involving
technical issues the courts should be even more reluctant
because most of us in Judges' robes do not have the
necessary expertise to adjudicate upon technical issues
beyond our domain. The courts should not use a
magnifying glass while scanning the tenders and make
every small mistake appear like a big blunder. In fact, the
courts must give “fair play in the joints” to the government
and public sector undertakings in matters of contract.
Courts must also not interfere where such interference will
cause unnecessary loss to the public exchequer. (See:
Silppi Constructions Contractors v. Union of India, (2020)
16 SCC 489).
52. Ordinarily, a writ court should refrain itself from
imposing its decision over the decision of the employer
as to whether or not to accept the bid of a tenderer
unless something very gross or palpable is pointed out.
The court ordinarily should not interfere in matters
relating to tender or contract. To set at naught the entire
tender process at the stage when the contract is well
underway, would not be in public interest. Initiating a fresh
tender process at this stage may consume lot of time and
also loss to the public exchequer to the tune of crores of
rupees. The financial burden/implications on the public
exchequer that the State may have to meet with if the Court
directs issue of a fresh tender notice, should be one of the
guiding factors that the Court should keep in
mind. This is evident from a three-Judge Bench decision of
this Court in Association of Registration Plates v. Union of
India and Others, reported in (2005) 1 SCC 679.
53. The law relating to award of contract by the State
and public sector corporations was reviewed in Air India
Ltd. v. Cochin International Airport Ltd., reported in (2000) 2
SCC 617 and it was held that the award of a contract,
whether by a private party or by a State, is
essentially a commercial transaction. It can choose its
own method to arrive at a decision and it is free to grant
any relaxation for bona fide reasons, if the tender
conditions permit such a relaxation. It was further held
that the State, its corporations, instrumentalities and
agencies have the public duty to be fair to all concerned.
Even when some defect is found in the decision-making
process, the court must exercise its discretionary powers
under Article 226 with great caution and should exercise it
only in furtherance of public interest and not merely on the
making out of a legal point. The court should always keep
the larger public interest in mind in order to decide whether
its intervention is called for or not. Only when it comes to a
conclusion that overwhelming public interest requires
interference, the court should interfere.
54. As observed by this Court in Jagdish Mandal v.
State of Orissa and Others, reported in (2007) 14 SCC
517, that while invoking power of judicial review in
matters as to tenders or award of contracts, certain
special features should be borne in mind that evaluations of
tenders and awarding of contracts are essentially
commercial functions and principles of equity and natural
justice stay at a distance in such matters. If the decision
relating to award of contract is bona fide and is in public
interest, courts will not interfere by exercising powers of
judicial review even if a procedural aberration or error in
assessment or prejudice to a tenderer, is made out. Power
of judicial review will not be invoked to protect private
interest at the cost of public interest, or to decide
contractual disputes.”
8.
It is trite law that writ jurisdiction is not intended to supplant ordinary
civil remedies, particularly in matters involving contractual disputes requiring
adjudication of complex and disputed questions of fact. In "State of Bihar v.
Jain Plastics and Chemicals Ltd.", 2002 (1) SCC 216, the Hon'ble Supreme
Court has held that where the claim arises out of breach of contract and
involves disputed facts, the appropriate remedy lies in a civil suit and not in a
writ petition. In paragraph 7, it has been observed that:“7. In the present case many matters could be decided after
referring to the contentions raised in the affidavits and
counter-affidavits, but that would hardly be a ground for
exercise of extraordinary jurisdiction under Article 226 of the
Constitution in case of alleged breach of contract. Whether
the alleged non-supply of road permits by the appellants
would justify breach of contract by the respondent would
depend upon facts and evidence and is not required to be
decided or dealt with in a writ petition. Such seriously
disputed questions or rival claims of the parties with regard to
breach of contract are to be investigated and determined on
the basis of evidence which may be led by the parties in a
properly instituted civil suit rather than by a court exercising
prerogative of issuing writs.”
9.
Though in "ABL International Ltd. v. Export Credit Guarantee
Corporation of India Ltd.", 2004 (3) SCC 553, the Hon'ble Apex Court
recognized that a writ petition may be maintainable in contractual matters in
limited circumstances, it was clearly observed that such jurisdiction is to be
exercised where the facts are undisputed or where the State action is
patently arbitrary, unreasonable, or in violation of Article 14. The present case
does not fall within such an exception, as the very substratum of the
petitioner's claim is contested.
10.
The Hon'ble Supreme Court in "Joshi Technologies International
Inc. v. Union of India", 2015 (7) SCC 728, where adjudication involves
serious factual controversies necessitating evidence, the writ court should
decline to exercise jurisdiction and relegate the parties to appropriate forums.
In paragraphs 69 and 70, the legal position has been summarised that:“69. The position thus summarised in the aforesaid principles
has to be understood in the context of discussion that
preceded which we have pointed out above. As per this, no
doubt, there is no absolute bar to the maintainability of the
writ petition even in contractual matters or where there are
disputed questions of fact or even when monetary claim is
raised. At the same time, discretion lies with the High Court
which under certain circumstances, it can refuse to exercise.
It also follows that under the following circumstances,
"normally", the Court would not exercise such a discretion:
69.1. The Court may not examine the issue unless the action
has some public law character attached to it.
69.2. Whenever a particular mode of settlement of dispute is
provided in the contract, the High Court would refuse to
exercise its discretion under Article 226 of the Constitution
and relegate the party to the said mode of settlement,
particularly when settlement of disputes is to be resorted to
through the means of arbitration.
69.3. If there are very serious disputed questions of fact which
are of complex nature and require oral evidence for their
determination.
69.4. Money claims per se particularly arising out of
contractual obligations are normally not to be entertained
except in exceptional circumstances.
70. Further, the legal position which emerges from various
Judgments
of
this
Court
dealing
with
different
situations/aspects relating to contracts entered into by the
State/public authority with private parties, can be summarised
as under:
70.1. At the stage of entering into a contract, the State acts
purely in its executive capacity and is bound by the
obligations of fairness.
70.2. State in its executive capacity, even in the contractual
field, is under obligation to act fairly and cannot practise some
discriminations.
70.3. Even in cases where question is of choice or
consideration of competing claims before entering into the
field of contract, facts have to be investigated and found
before the question of a violation of Article 14 of the
Constitution could arise. If those facts are disputed and
require assessment of evidence the correctness of which can
only be tested satisfactorily by taking detailed evidence,
involving examination and cross-examination of witnesses,
the case could not be conveniently or satisfactorily decided in
proceedings under Article 226 of the Constitution. In such
cases the Court can direct the aggrieved party to resort to
alternate remedy of civil suit, etc.
70.4. Writ jurisdiction of the High Court under Article 226 of
the Constitution was not intended to facilitate avoidance of
obligation voluntarily incurred.
70.5. Writ petition was not maintainable to avoid contractual
obligation. Occurrence of commercial difficulty, inconvenience
or hardship in performance of the conditions agreed to in the
contract can provide no justification in not complying with the
terms of contract which the parties had accepted with open
eyes. It cannot ever be that a licensee can work out the
licence if he finds it profitable to do so: and he can challenge
the conditions under which he agreed to take the licence, if he
finds it commercially inexpedient to conduct his business.
70.6. Ordinarily, where a breach of contract is complained of,
the party complaining of such breach may sue for specific
performance of the contract, if contract is capable of being
specifically performed. Otherwise, the party may sue for
damages.
70.7. Writ can be issued where there is executive action
unsupported by law or even in respect of a corporation there
is denial of equality before law or equal protection of law or if
it can be shown that action of the public authorities was
without giving any hearing and violation of principles of
natural justice after holding that action could not have been
taken without observing principles of natural justice.
70.8. If the and the contract between private party
State/instrumentality and/or agency of the State is under the
realm of a private law and there is no element of public law,
the normal course for the aggrieved party, is to invoke the
remedies provided under ordinary civil law rather than
approaching the High Court under Article 226 of the
Constitution of India and Invoking its extraordinary jurisdiction.
70.9. The distinction between public law and private law
element in the contract with the State is getting blurred.
However, it has not been totally obliterated and where the
matter falls purely in private field of contract, this Court has
maintained the position that writ petition is not maintainable.
The dichotomy between public law and private law rights and
remedies would depend on the factual matrix of each case
and the distinction between the public law remedies and
private law field, cannot be demarcated with precision. In fact,
each case has to be examined, on its facts whether the
contractual relations between the parties bear insignia of
public element. Once on the facts of a particular case it is
found that nature of the activity or controversy involves public
law element, then the matter can be examined by the High
Court in writ petitions under Article 226 of the Constitution of
India to see whether action of the State and/or instrumentality
or agency of the State is fair, just and equitable or that
relevant factors are taken into consideration and irrelevant
factors have not gone into the decision-making process or
that the decision is not arbitrary.
70.10. Mere reasonable or legitimate expectation of a citizen,
in such a situation, may not by itself be a distinct enforceable
right, but failure to consider and give due weight to it may
render the decision arbitrary, and this is how the requirements
of due consideration of a legitimate expectation forms part of
the principle of non-arbitrariness.
70.11. The scope of judicial review in respect of disputes
falling within the domain of contractual obligations may be
more limited and in doubtful cases the parties may be
relegated to adjudication of their rights by resort to remedies
provided for adjudication of purely contractual disputes.”
11.
The claim of the petitioner arises out of a concluded contractual
relationship with Respondent No.1 and essentially seeks recovery of
Rs.27,29,083/- along with interest. Though the existence of a contractual
relationship does not constitute an absolute bar to exercise of jurisdiction
under Article 226 of the Constitution of India, such jurisdiction is discretionary
and is ordinarily not exercised for adjudication of purely contractual and
monetary disputes. In Joshi Technologies International Inc. v. Union of
India, (2015) 7 SCC 728, the Hon'ble Supreme Court has held that money
claims arising out of contractual obligations are normally not to be entertained
in writ jurisdiction except in exceptional circumstances, particularly where the
dispute falls within the private law field and involves no public law element.
Likewise, in State of Bihar v. Jain Plastics and Chemicals Ltd., (2002) 1
SCC 216, it has been held that contractual disputes involving disputed
questions of fact are more appropriately adjudicated before the competent
civil forum.
12.
In the present case, the petitioner seeks a positive direction for
payment of a particular amount along with contractual interest. The precise
liability of Respondent No.1, the effect of the running account/final bills, the
amount already paid, the contractual conditions governing final payment and
the date from which interest, if any, would become payable are matters which
arise from the contractual records and require appropriate adjudication. The
Performance/Completion Certificate dated 24.03.2026, relied upon by the
Petitioner, may establish satisfactory completion of the work, but by itself
cannot be treated as an unconditional admission of the precise monetary
liability claimed. Though in ABL International Ltd. v. Export Credit
Guarantee Corporation of India Ltd., (2004) 3 SCC 553, the Hon'ble
Supreme Court has held that a contractual or monetary claim is not per se
barred under Article 226, the exercise of such jurisdiction remains
discretionary. Further, in Tata Motors Ltd. v. Brihan Mumbai Electric
Supply & Transport Undertaking (BEST) & Ors., 2023 SCC OnLine SC
671, the Hon'ble Supreme Court has reiterated that courts should exercise
considerable restraint in contractual and commercial matters. In the facts of
the present case, no exceptional circumstance or independent public law
element warranting interference under Article 226 has been established.
13.
We also take note of the fact that the petitioner had earlier approached
the Hon'ble High Court of Delhi in W.P.(C) No.7793/2026, wherein, vide order
dated 29.05.2026, liberty was granted to the Petitioner to approach the
jurisdictional forum. The said order does not adjudicate the petitioner's
entitlement to the amount claimed. In view of the aforesaid discussion, we are
of the considered opinion that the present petition, being essentially a claim
for recovery of contractual dues, does not warrant exercise of the
extraordinary jurisdiction of this Court.
14.
Accordingly, the present writ petition is dismissed, leaving it open to
the Petitioner to avail such other remedy as may be available to it under law
for adjudication and recovery of its claim, including the claim for interest. It is
made clear that this Court has not expressed any opinion on the merits of the
petitioner's claim.
15.
Alok
All pending applications, if any, stand disposed of.
Sd/-
Sd/-
(Ravindra Kumar Agrawal)
(Ramesh Sinha)
Judge
Chief Justice
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review