Full Judgment Text
Text read from the judgment PDF published on the High Court's eCourts portal, through the
Indian High Court Judgments open data set (Dattam Labs,
CC BY 4.0).
The court's own copy is the authoritative text.
C/SCA/302/2013
JUDGMENT DATED: 03/07/2025
IN THE HIGH COURT OF GUJARAT AT AHMEDABAD
R/SPECIAL CIVIL APPLICATION NO. 302 of 2013
FOR APPROVAL AND SIGNATURE:
HONOURABLE MRS. JUSTICE MAUNA M. BHATT
sd/-
==========================================================
Approved for Reporting
Yes
Yes
No
==========================================================
MANAJI PUNJAJI THAKOR & ORS.
Versus
STATE OF GUJARAT & ORS.
==========================================================
Appearance:
DECEASED LITIGANT THROUGH LEGAL HEIRS/ REPRESTENTATIVES
for the Petitioner(s) No. 1,2
MR VIKRAM J THAKOR(2221) for the Petitioner(s) No.
1.1,1.2,1.3,1.4,1.5,2.1,2.2,2.3,2.4
G H VIRK(7392) for the Respondent(s) No. 2,3
MR SIMRANJITSINGH H VIRK(11607) for the Respondent(s) No. 2,3
MS SONAL D VYAS(999) for the Respondent(s) No. 4
RULE SERVED for the Respondent(s) No. 5,6
MR SAHIL TRIVEDI, LD.AGP for Respondent No. 1
==========================================================
CORAM:HONOURABLE MRS. JUSTICE MAUNA M. BHATT
Date : 03/07/2025
ORAL JUDGMENT
1. This petition is filed with the following prayers:
“(A) Your Lordships may be pleased to admit and allow this
petition.
(B) Your Lordships may
be
pleased
to issue
writ
of
C/SCA/302/2013
JUDGMENT DATED: 03/07/2025
mandamus or appropriate writ of certiorari or appropriate
writ, order or direction quashing and setting aside the
impugned Town Planning Scheme No. 241 (Nana Chiloda) so
far as it relates to land in question i.e. Survey No.33/1 and
33/2 of Nana Chiloda (Naroda), Tal. & Dist. Gandhinagar
and impugned eviction notice dated 23/10/2012 (Annexure-J)
and all the notifications, orders and proceedings undertaken
to frame Draft T.P. Scheme. No. 241 (Nana Chiloda) so far
as it relates to survey nos. 33/1 and 33/2.
(BB) Your Lordships may be pleased to quash and set aside
the notice dated 2.1.2013 Annexure “S:"
(BBB) Your Lordships may be pleased to quash and set aside
the impugned notice dated 28.10.2024 (Annexure- M/1 and
order dated 26.11.2024 (Annexure-M/3) and be pleased to
pass appropriate direction against the concerned officer of
the respondent no. 26 for issuing the eviction notice dated
28.10.2024 and passing the order dated 26.11.2024 in spite
pendency of the petition.
(C) In alternative of prayer made in Para (B)
Your Lordships may be pleased to direct the revenue
authorities more particularly the Mamlatdar (E-dhara),
Gandhinagar to make appropriate correction in village Form
No. 7/12 by correcting measurement of survey no. 33/2 as
21044 sq. mtrs. instead of 16289 sq.mtrs. and be pleased to
direct the Town Planning Authority and the State
Government to allot the final plot in lieu of survey no.33/2
as per the corrected measurement i.e., 21044 sq. mtrs. of
survey no. 33/2.
(D) In alternative of prayer made in Para-(B), Your Lordships
may be further pleased to direct the Town Planning Officer
to make the valuation of the constructed properties of the
petitioners being affected because of laying down of T.P.
Road, calculate the loss likely to be suffered by the
petitioners and to make the payment of compensation with
further direction to town planning authority and revenue
authority to grant permission to reconstruct residential and
other constructions including temple and tubewell before
C/SCA/302/2013
JUDGMENT DATED: 03/07/2025
implementing the T.P. Scheme.
(E)
During the pendency and till final disposal of this
petition, by way of interim relief, Your Lordships may be
pleased to stay the implementation, operation and execution
of T.P. Scheme No.241 (Nana Chiloda) and impugned
eviction notice dated 23/10/2012 (Annexure-J) with further
directions to the respondents not to interfere with the actual
physical possession of the petitioners over the land in
question.
(F) Any other relief deemed just and proper may please be
granted justice. in the interest of justice.”
2. Facts in brief, as referred in the petition, are as under:
2.1
The
petitioners
and
their
family
members
are
owners and occupiers of various lands bearing survey
No.33/1 admeasuring 24484 sq.mtrs. and survey No.33/2
admeasuring 21044 sq.mtrs. situated in sim of village:
Chiloda
(Naroda),
Taluka
&
District:
Gandhinagar
(hereinafter referred to as “subject land”). It is case of
the petitioners that they are cultivating the subject land
and also residing there. For the purpose of residence,
they
have
constructed
their
residential
houses
and
keeping their agriculture produce, equipments and cattle.
There exists a Tube well there. To justify ownership of
land, 7/12 extracts of survey No.33/1 and 33/2 are
placed on record at Annexure “B” (Page 29 to 30). As
C/SCA/302/2013
JUDGMENT DATED: 03/07/2025
per revenue record Survey No.33/1, the same is restricted
tenure land and survey No.33/2 is old tenure land.
2.2
It is case of the petitioners that so far as survey
No.33/2 is concerned, its actual measurement is 5 Acre
08 Guntha (21044 sq.mtrs.), however, by mistake in
village Form No.7/12, it is mentioned lesser as 16289
sq.mtrs. For the correct measurement of area of survey
No.33/2, the petitioners have placed reliance on map
dated 04.06.1926 at Annexure “C” (Page-31).
In view
of map dated 04.06.1926, Mamlatdar, Gandhinagar under
order dated 10.09.2008 Annexure “D” (Page 33) had
communicated to correct the measurement in revenue
records (7/12 extract). However since record of survey
No.33/2
was
not
corrected
in
7/12
extracts,
the
petitioners made an application dated 22.09.2010 to
Mamlatdar, E-dhara, Gandhinagar to correct the same by
placing
reliance
on
map
of
year
1926,
where
measurement of 5 Acre 08 Guntha (21044 sq.mtrs.) is
referred. It is stated in the application that measurement
referred in 7/12 extracts i.e. 16289 sq.mtrs. is erroneous
and deserves to be replaced as 21044 sq.mtrs. Application
of the petitioners is annexed at Annexure “E” (Page-34).
Pursuant
to
an
application,
reply
was
received
on
C/SCA/302/2013
JUDGMENT DATED: 03/07/2025
05.08.2010 by office of DILR that measurement of survey
No.33/2 is 5 Acre 08 Guntha, which comes to 21044
sq.mtrs. The communication of DILR dated 14.07.2016
addressed to the petitioners is annexed at Annexure “F”
(Page-35).
2.3
It is case of the petitioners that during pendency of
petitioners’ application seeking correction of measurement
in revenue records (7/12 extract) of survey no. 33/2, a
resolution No.57 dated 20.02.2009 was passed to frame
Draft Town Planning Scheme- 241 (Nana Chiloda) and
accordingly Public Notice dated 06.03.2009 at Annexure
“G” (Page-36) was issued declaring intention to frame
Draft
Town
Planning
Scheme-
(Nana
Chiloda).
Pursuant to intention to frame Draft Town Planning
Scheme- 241 (Nana Chiloda), the petitioners were served
upon Notice dated 05.09.2009 calling upon them to
remain present in the meeting of land owners on
11.09.2009. The said notice was served to the petitioners
because their land bearing survey Nos.33/1 and 33/2 was
included in Draft Town Planning Scheme- 241 (Nana
Chiloda). The petitioners accordingly
submitted their
objections on 25.09.2009 to Town Planning Authority
(Annexure “I” Page-38). It is case of the petitioners that
C/SCA/302/2013
JUDGMENT DATED: 03/07/2025
along with other objections, one of the objections was
with regard to area of survey No.33/2, considered as
16289 sq.mtrs. instead of 21044 sq.mtrs. (5 Acre 08
Guntha).
2.4
It is case of the petitioners that without considering
their objections and without issuance of any Notice of
hearing, the petitioners were served with the Eviction
Notice
dated
23.10.2012
(Annexure
“J”
Page-47).
Respondent No.4- AUDA directed the petitioners to hand
over possession of the land for the purpose of Draft Town
Planning Scheme- 241 (Nana Chiloda). The said scheme
was
thereafter
sanctioned
by
Notification
dated
10.09.2012. The petitioners once again objected to the
Notification dated 10.09.2012 by raising objections dated
12.11.2012
(Annexure
“K”
Page-49).
Despite
raising
objections, without considering the same, Town Planning
Officer published public notice dated 17.12.2012 under
Rule 26(1) and 26(3) of Gujarat Town Planning and
Urban Development Rules, where survey Nos.33/1 and
33/2 have been referred. Once again, objections were
raised. Aggrieved by Notice dated 23.10.2012 Annexure
“J”, the present petition was filed.
C/SCA/302/2013
2.5
JUDGMENT DATED: 03/07/2025
Thereafter,
on
account
of
incorporation
of
petitioners’ survey Nos.33/1 and 33/2 in the city limit of
Ahmedabad Municipal Corporation, eviction order dated
26.11.2024 was passed by the Ahmedabad Municipal
Corporation under Section 68 of the T.P. Act read with
Rule
of
Gujarat
Development
Rules.
Town
Planning
and
Urban
Aggrieved
by
notice
dated
26.11.2024, the petition was amended, which is also
subject matter of this petition.
3. Heard
learned
petitioners,
Mr.Sahil
advocate
learned
Trivedi
Mr.Vikram
Assistant
for
respondent
Thakor
Government
No.1
and
for
the
Pleader
learned
Government Pleader Mr.G.H.Virk assisted by learned
advocate Mr.S.H.Virk for respondent Nos.2 and 3.
4. Learned advocate Mr.Vikram Thakor for the petitioners
submitted that pursuant to
finalization of Draft Town
Planning Scheme- 241 (Nana Chiloda) vide Notification
dated 10.09.2012 (Annexure R-Page-91), Notice dated
23.10.2012 was issued directing to vacate the subject
land. The said notice is erroneous and deserves to be
quashed and set aside. Inviting attention of this Court to
the Notice dated 23.10.2012, Learned Advocate submitted
C/SCA/302/2013
JUDGMENT DATED: 03/07/2025
that undisputedly, the petitioners land bearing survey
No.33/1 is restricted tenure land admeasuring 24484
sq.mtrs. whereas land bearing survey No.33/2 is old
tenure land admeasuring 21044 sq.mtrs. Despite that, in
the Notice against survey No.33/2, land admeasuring
16289 sq.mtrs. has been referred. For this mistake the
petitioners immediately raised objection inviting attention
to direct revenue authority (Mamlatdar) to first make
correction in the measurement in relation to survey
No.33/2. It was also brought to the notice of Town
Planning Authority that the petitioners’ application before
Mamlatdar seeking correction in 7/12 extracts in relation
to survey No.33/2 is pending. This aspect was not
considered and therefore, Notice dated 23.10.2012 and
last
Notice
dated
26.11.2024
issued
by
Ahmedabad
Municipal Corporation deserve to be quashed and set
aside.
4.1
Learned advocate Mr.Thakor further submitted that
this is second round of litigation. Earlier Special Civil
Application No.302 of 2013 was filed challenging earlier
Notices dated 23.10.2012 and 02.01.2013. In the said
petition, one of the grounds of challenge was with regard
to lessor area mentioned against petitioners’ original
C/SCA/302/2013
JUDGMENT DATED: 03/07/2025
survey no. 33/2. It is true that against petitioners’ survey
Nos.33/1 and 33/2, Final Plot was given, however area of
original plot no 33/2, instead of 21044 sq.mtrs, was
considered as 16289 sq.mtrs. Thereafter, upon hearing of
petition, this court vide order dated 06.09.2013 granted
interim relief in terms of Para 8(e) of the petition.
Thereafter, upon pleadings being completed, the petition
was heard finally, wherein revenue authority was directed
to
consider
application
of
the
petitioners,
seeking
correction in measurement in relation to survey No.33/2.
Liberty was also reserved in favour of the petitioners to
revive the petition in case of difficulty.
Since,
application
of
the
petitioners
seeking
correction in measurements of survey no.33/2, was not
decided, with the allegation of willful disobedience of the
directions dated 14.07.2016, the petitioners moved an
application seeking revival of captioned writ petition.
This court allowed Misc. application and revived the
petition to its original file. Despite pendency of above
petition,
respondent
No.26-
Ahmedabad
Municipal
Corporation, once again issued Notice dated 28.10.2024,
which was challenged by filing amendment application.
Therefore, since application of the petitioners seeking
correction
in
measurement
is
pending,
appropriate
C/SCA/302/2013
JUDGMENT DATED: 03/07/2025
direction may be issued to respondent - revenue authority
to correct the measurement and then to consider the
petitioners case for grant of final plot against his original
plot.
4.2
Learned
advocate
for
the
petitioners
further
submitted that other grounds may also be considered.
Prior to Notice dated 02.01.2013 directing the petitioners
to vacate the land for proposed road, the petitioners were
neither served with any Notice nor they were heard. This
aspect is in violation of principle of natural justice and
therefore, the notices deserve to be quashed and set
aside.
4.3
Learned advocate for the petitioners submitted that
it may be considered that actual area of survey No.33/2
is 21044 sq.mtrs., which is confirmed by DILR (Page-35)
and since respondent Nos.5 and 6 have not corrected the
revenue records and Town Planning Authority has not
considered the correct measurement,
prejudice has been
caused to the petitioners. Therefore, revenue authority
may be directed to consider and rectify the error as held
by this court in case of Manilal Devjibhai Solanki V/s.
State of Gujarat and others in Special Civil Application
C/SCA/302/2013
JUDGMENT DATED: 03/07/2025
No.14500 of 2010. Once rectification is done, direction
may be issued to Town Planning Authority to allot Final
Plot with corrected measurement against old revenue
survey No.33/2.
4.4
Learned
advocate
further
submitted
that
since
correction is not done in the measurement of survey no.
33/2,
Draft
Town
Planning
Scheme
may
not
be
implemented, directing the petitioners to give peaceful
vacant possession of plot no 33/2.
4.5
Further, proposed Draft Town Planning Scheme
covers residential houses, temple and other structures for
livelihood. Demolition would cause prejudice to the
petitioners, which is also referred in the objections
raised.
Therefore, the State may be directed to do
variation in the Draft Town Planning Scheme to the
above extent. In this case, it is reiterated that before
finalization of Draft Town Planning Scheme No.241, the
petitioners were not heard with their objections. With the
objections pending, order passed being in breach of
principles of natural justice, finalization of Draft Town
Planning Scheme and Notice dated 23.10.2012 followed
by subsequent Notice dated 26.11.2024 deserve to be
C/SCA/302/2013
JUDGMENT DATED: 03/07/2025
quashed and set aside.
4.6
relief
On contention of revival of this petition and interim
granted
therein,
learned
advocate
by
placing
reliance on the decision of Hon’ble Supreme Court in the
case of Vareed Gecob V/s. Sosamma Geevarghese reported
in 2004(6) SCC 378, submitted that in view of revival of
main petition, the earlier order of interim relief gets
revived, and in view of continuation of interim relief, the
Notice dated 26.11.2024 issued by Ahmedabad Municipal
Corporation being in breach of direction, appropriate
action may be initiated against respondent No.26 and its
erring officer.
5.
Opposing the petition, learned Government Pleader
Mr.G.H.Virk for respondent Nos.2 and 3 submitted that
earlier this petition was filed seeking to quash and set
aside the Draft Town Planning Scheme No.241 (Nana
Chiloda) so far as it relates to survey Nos.33/1 and 33/2
of Nana Chiloda (Naroda), Taluka & District: Gandhinagar
and therefore Notice dated 23.10.2012 (Annexure “J”
Page-47) was challenged. An alternative prayer seeking to
direct
the
revenue
authority
(Mamlatdar)
to
make
correction in Village Form No.7/12 for measurement of
C/SCA/302/2013
JUDGMENT DATED: 03/07/2025
survey No.33/2 was made. It was prayed that so far as
survey No.33/2 is concerned, the correct measurement is
21044 sq.mtrs. and not 16289 sq.mtrs.; and therefore, the
Mamlatdar, Gandhinagar may be directed to correct
revenue record (7/12 extract). By way of interim relief,
stay was sought against effect and implementation of
Notice dated 23.10.2012 Annexure -J. That petition was
heard and by an order dated 06.09.2013 of this Court,
while admitting the petition, stay was granted in terms of
para 8(e). Thus, the effect and implementation of eviction
Notice dated 23.10.2012 was stayed under order dated
06.09.2013. Thereafter, the said petition was heard and
after having bi-parte hearing, an order dated 14.07.2016
was
passed
directions.
disposing
Under
the
of
the
order
petition
dated
with
certain
14.07.2016,
the
petitioners were directed to approach respondent Nos.5
and 6, and respondent Nos.5 and 6 were directed to
redress the grievance of the petitioners within 15 days
from their applications. The petitioners thereafter were
further directed to approach Town Planning Officer with
corrected record to redress the grievance. Time was given
to complete exercise within two months from the date of
order. It was held in the order that alignment of the road
will
not
be
changed.
Accordingly,
the
petitioners
C/SCA/302/2013
JUDGMENT DATED: 03/07/2025
approached respondent Nos.5 and 6 (revenue authority)
seeking correction in revenue record in relation to
measurement of survey No.33/2. The said application was
decided by an order dated 12.08.2016. Since under order
dated 12.08.2016, no decision was taken by revenue
authority, the petitioners made an application seeking
revival of the petition and the same was revived by an
order dated 14.07.2016. However, at the time of revival,
interim relief earlier granted in terms of 8(e) was not
continued and therefore, in absence of any order of
continuation of any interim relief, the submission made
in the amendment application of continuation of Interim
relief is wrong. Therefore, the order dated 28.10.2024, of
continuation of interim relief was on erroneous facts. The
interim relief dated 28.10.2024 may not be continued and
notice dated 28.10.2024 issued by Ahmedabad Municipal
Corporation may be permitted to be implemented.
5.1
Further, since the subject land was transferred from
AUDA to Ahmedabad Municipal Corporation, Notice dated
28.10.2024 was issued and there is no illegality in
issuance
of
Notice
dated
28.10.2024.
Notice
dated
28.10.2024 was responded by filing representation dated
08.11.2024. Thereafter, pursuant to finalization of Draft
C/SCA/302/2013
JUDGMENT DATED: 03/07/2025
Town Planning Scheme No.241 (Nana Chiloda), another
Notice dated 26.11.2024 was issued. The said Draft Town
Planning Scheme No.241 (Nana Chiloda) was sanctioned
where subject land is allotted for 30 mtrs. public road.
Since the Town Planning Scheme is for public purpose,
peaceful Vacant possession of entire land was taken
except the land of the petitioners. The petitioners are not
vacating premises since last more than 11 years. Learned
Government Pleader further submitted that by virtue of
section 48-A of the Act, upon sanctioning of Draft Town
Planning
Scheme
No.241
(Nana
Chiloda),
all
land
specified under section 40(3) vests with the authority free
from all encumbrances. In support, reliance is placed on
decision of this court dated 18.07.2018 in the case of
Ashokkumar Ramanlal Shah V/s. State of Gujarat in
Special Civil Application No.15298 of 2017 and allied
matters, as also the decision dated 09.04.2018 passed by
Division Bench of this court in the case of Iqbal Ibrahim
Qureshi V/s.
State of Gujarat in Letters Patent Appeal
No.401 of 2018 in Special Civil Application No.3359 of
2018.
5.2
Learned Government Pleader further submitted that
grievance of the petitioners that no opportunity of
C/SCA/302/2013
JUDGMENT DATED: 03/07/2025
hearing was provided, is contrary to the facts on record.
Prior to sanctioning of Draft Town Planning Scheme
No.241, the procedure contemplated under the provisions
of the Act, was followed. Further, relief sought in this
petition seeking to direct the revenue authority to make
correction in 7/12 extracts will not fall within the
purview of jurisdiction of this court. The petitioners,
against their original plot, are given final plot and if any
correction will be made pursuant to the application of
the petitioners, it will be open for the petitioners to raise
their claim accordingly, at a future date. In other words,
at this stage, in view of sanctioning of Draft Town
Planning Scheme No.241 (Nana Chiloda), the land vests
with the competent authority and therefore, Notice issued
dated 23.10.2012 followed by Notices dated 28.10.2024
and 26.11.2024 are in accordance with law. Therefore,
this petition being devoid of merits, deserves to be
rejected.
6. Learned Assistant Government Pleader Mr.Sahil Trivedi
supported
the
contention
canvassed
by
learned
Government Pleader Mr.G.H.Virk for respondent Nos.2
and 3. Learned Assistant Government Pleader further
submitted that as on date, the petitioners have not
C/SCA/302/2013
JUDGMENT DATED: 03/07/2025
challenged the order dated 12.08.2016 of not considering
his application seeking correction in the revenue record.
Therefore also, the present petition deserves rejection.
7. Considered the submissions and documents on record,
revisitation of facts would be necessary.
7.1
Sanctioning of Draft Town Planning Scheme No.241
(Nana Chiloda) under section 48(2) of the Town Planning
Act by Notification dated 10.09.2012 is not in dispute.
Upon sanctioning of draft Town Planning Scheme No. 241
(Nana Chiloda), against petitioners’ original plot No.33,
final plot no. 33/1 and 33/2 were allotted, wherein
against survey No.33/1 area of 24484 sq.mtrs. has been
referred and against survey No.33/2, area of 16289
sq.mtrs. has been referred. Thus, total area of original
plot has been referred as 40779 sq.mtrs. In the notice
dated 23.10.2012, it was stated that original plot with
the area of 40779 sq.mtrs. is taken for development of
town planning road, and accordingly the petitioners being
owners were provided with an opportunity of hearing on
05.11.2012
between
12:00
pm
to
2:00
pm.
The
petitioners responded to the Notice dated 23.10.2012 by
raising
their
objections
dated
12.11.2012.
In
the
C/SCA/302/2013
JUDGMENT DATED: 03/07/2025
objections, it was stated that petitioners are residing and
using the subject lands for agricultural purpose also.
Difficulties likely to be faced were narrated in the
objections. Reference of survey No.33/2 being old tenure
land having measurement of 21044 sq.mtrs. was referred
in the objections. It was case of the petitioners that
measurement referred against original plot no. 33/2 is
erroneous
and
application
seeking
correction
of
measurement is made on E-dhara portal to Mamlatdar.
Further, grievance of allotted plot no.33/2, in agricultural
zone was also made. Request to allot some other plot
free from all encumbrances is also made.
7.2
Thereafter, Notice dated 17.12.2012 was published
inviting objections in relation to sanctioning of Draft
Town Planning Scheme No.241 (Nana Chiloda). The
petitioners
in
response
to
the
public
notice
dated
17.12.2012, once again raised their objections dated
24.12.2012. Therefore, contention raised that the scheme
was sanctioned without following principles of natural
justice, in the opinion of this court, is contrary to the
documents on record.
7.3
It is noticed that prior to challenge to Notice dated
C/SCA/302/2013
JUDGMENT DATED: 03/07/2025
23.10.2012, petitioners had preferred application dated
13.04.2011
seeking
correction
in
revenue
record
in
relation to survey No.33/2. It is case of the petitioners
that measurement shown in the revenue record of survey
No.33/2,
is
erroneous
since
the
petitioners
are
in
possession of land admeasuring 5 Acre 08 Guntha, which
comes to 21044 sq.mtrs. For correction in measurement,
the petitioners had relied upon certain documents of
1926. Reliance on report of DILR measurement dated
04.06.1926, was also made. Accordingly, this court under
order
dated
14.07.2016
(Page-261)
in
Special
Civil
Application No.302 of 2013 directed the petitioners to
approach respondent Nos.5 and 6 and thereafter further
directed
respondent
Nos.5
and
to
consider
the
grievance of the petitioners by passing order within
stipulated time. Consequential direction to approach Town
Planning Officer to consider measurement of Final Plot
with corrected measurement if any was also directed.
Thus,
pursuant
to
direction
of
this
court,
revenue
authority passed an order dated 12.08.2016 (Page-269)
disposing
of
the
application.
petitioners
seeking
correction
Though
of
application
measurements
of
was
rejected by an order dated 12.08.2016, the petitioners did
not challenge the said order and instead made an
C/SCA/302/2013
JUDGMENT DATED: 03/07/2025
application seeking revival and the same was allowed.
8. In the above context, if the grievance of the petitioners is
seen, then it is evident that notice dated 23.10.2012
followed by Notices dated 28.10.2024 and 26.11.2024
were challenged because the case of the petitioners was
not considered for allotment of final plot recording
correct measurement. It is case of the petitioners that
though they were owners of original plot having 21044
sq.mtrs., they have been considered for allotment of final
plot having lesser area of 16289 sq.mtrs. which is based
on incorrect entry recorded in 7/12 extract and village
form No.12.
9. Therefore, it cannot be ignored that upon finalization of
Draft Town Planning Scheme No.241 (Nana Chiloda), the
land in question vested with the competent authority for
its implementation. It is also noticed that the Town
Planning Authority has allotted final plot against original
plot by placing reliance on revenue record.
As per the
provisions of the Act, Town Planning Authority is to
consider the revenue records for allotment of final plot
against original plot. Therefore, in the opinion of this
court, there is no illegality by the Town Planning
C/SCA/302/2013
JUDGMENT DATED: 03/07/2025
Authority at the stage of issuing Notice dated 23.10.2012
while considering measurement of survey No.33/2 as
16289 sq.mtrs.
10.
For any correction in revenue record, appropriate
application is required to be made before the revenue
authority and the Town Planning Officer is not the officer
concerned
with
correction
or
otherwise
of
revenue
entries. However, in this case, in the earlier round of
litigation, by an order dated 14.07.2016, application filed
by the petitioners’ seeking correction in the revenue
record was directed to be considered and accordingly an
order
dated
contended
by
12.08.2016
the
(Page-269)
petitioners
that
was
passed.
the
order
As
dated
12.08.2016 may be erroneous order or without reasons
but admittedly the said order has not been challenged till
date. Therefore, at this stage, this court does not find
any error in the action of respondents in issuing notices
seeking peaceful vacant possession of land in question for
implementation of Town Planning Scheme No.241 (Nana
Chiloda). At this stage, it is not open for the petitioners
to contend that till the correction is made as sought by
the petitioners in the revenue record, Notice issued dated
23.10.2012 followed by Notices dated 28.10.2024 and
C/SCA/302/2013
JUDGMENT DATED: 03/07/2025
26.11.2024 may not be implemented. It needs to be
noted that though the Town Planning Scheme No.241
(Nana
Chiloda)
10.09.2012,
after
was
a
Sanctioned
period
of
vide
Notification
years
it
is
not
implemented till date.
11.
It would be apposite to refer to the decision of this
Court dated 18.07.2018 in the case of Ashokkumar
Ramanlal Shah (supra),wherein it is held as under:
“11. In view of the above, there remains no
shadow of doubt that where the draft scheme
has been sanctioned by the Government, the
lands required for the purposes specified in
the clauses (c), (f), (g) or (h) of Section 40(3)
would automatically vest in the appropriate
authority as per Section 48(A) and that the
person, who is not entitled to occupy the land
under the sanctioned draft scheme can be
summarily evicted under section 48A(3) of the
said Act, on the analogy of the provisions
contained in section 68 of the Act read with
Rule 33 of the Rules. When the Statutory
vesting takes place as contemplated in Section
48A(1) of the said Act, the petitioners could
not insist that they should be simultaneously
handed over possession of the final plots
proposed to be allotted to them under the
Draft Scheme, before they are evicted from
the subject lands. The purposes mentioned in
Clauses (c), (f), (g) and (h) of Section 40(3)
C/SCA/302/2013
JUDGMENT DATED: 03/07/2025
are the public utility services, and therefore
the statutory vesting under Section 48A(1) of
the lands earmarked for such purposes is
automatic. It is axiomatic that salus populi
suprema lex that regard be had to be public
welfare, is the highest law. The respondent
authorities have sought to exercise their
powers under section 48A(3) read with section
68 and Rule 33 after following due process of
law and after giving reasonable opportunity of
hearing to the all concerned including the
petitioners. Hence, it could not be said that
the respondent no.2 Corporation has acted
arbitrarily or without any authority of law
while issuing impugned notices and passing
the impugned orders.”
12.
Further in the case of Iqbal Ibrahim Qureshi V/s.
State of Gujarat (supra), it is held by this court as under:
“13. From the aforesaid provisions contained
in the Act, it is clear that once the state
government has sanctioned the draft scheme in
September, 2012, all lands required by the
respondent Corporation for the purposes
specified in clauses (c),(f),(g),(h) of Section
40(3) of the Act shall vest absolutely in
appropriate
authority
free
from
all
encumbrances and provisions of Sections 68
and 69 shall mutatis mutandis apply to the
sanctioned draft scheme as if the sanctioned
draft scheme were a preliminary scheme.
Further, powers are given under Section 68 to
C/SCA/302/2013
JUDGMENT DATED: 03/07/2025
the appropriate authority that on and after the
date on which a preliminary scheme comes
into force, any person continuing to occupy
any land which he is not entitled to occupy
under the preliminary scheme shall be
summarily evicted in accordance with the
prescribed
procedure.
The
appropriate
authority is also empowered after giving notice
in accordance with the provisions of the
scheme to remove, pull down, or alter any
building or other work in the area included in
the scheme.
14. In view of the above, the contention of
the learned advocate for the petitioners that at
the stage of draft scheme, notice for eviction
cannot be issued to the petitioners is
misconceived. It is further required to be
noted that respondent
Corporation has
followed the principles of natural justice and
reasonable opportunity of being heard is given
to the petitioners. Thus, there is a substantial
compliance of the provisions of the Act and
the Rules.”
13.
In view of foregoing reasons, this court deems it
appropriate not to entertain this petition, while taking
note
of
the
submissions
of
respondents
that
the
application preferred by the petitioners seeking correction
in the revenue record, if accepted and if any changes are
made in revenue records (7/12 extract), it is open for the
petitioners to raise their claim before Town Planning
C/SCA/302/2013
JUDGMENT DATED: 03/07/2025
Officer while allotting final plot in terms of provisions of
the Town Planning Act.
14.
With this, the present petition is dismissed. Rule is
discharged. Interim relief granted earlier stands vacated
forthwith. No order is to cost.
15.
In
view
of
dismissal
of
main
petition,
civil
application if any, would not survive and disposed of
accordingly.
sd/(MAUNA M. BHATT,J)
16.
Learned
advocate
Mr.Vikram
Thakor
for
the
petitioners at this stage requested for continuation of
interim relief, which was granted earlier. The said
request
has
been
strenuously
opposed
by
learned
Government Pleader for respondent Nos.2 and 3.
17.
In
view
of
the
reasons
recorded
hereinabove,
request made on behalf of the petitioners is rejected.
sd/(MAUNA M. BHATT,J)
DIPTI PATEL...
Original copy of this order has been signed by the Hon'ble Judge.
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review