Serial No.03
Regular List
HIGH COURT OF MEGHALAYA
AT SHILLONG
MC (ARB.A) No.3/2017
Date of Order: 05.06.2018
North Eastern Electric Power
Corporation Limited
M/S Patel Unity Joint Venture
Vs.
(PUJV)
Coram:
Hon’ble Mr Justice Mohammad Yaqoob Mir, Chief Justice
Hon’ble Mr. Justice S. R. Sen, Judge
Appearance:
For the Petitioner/Appellant(s): Ms. M. L. Gope, Adv.
For the Respondent(s):
Mr. V. K. Jindal, Sr. Adv.
i)
Whether approved for reporting in
Yes
Law journals etc.:
ii)
Whether approved for publication
in press:
No
Per Mohammad Yaqoob Mir, ‘CJ’
1)
Delay of 38 days in filing the cross objection(appeal) is sought to
be condoned, whereas, as per office report, delay is of 332 days.
2)
Precise factual background for effectual adjudication of this
application shall be advantageous to be noticed:
I.
Petitioner, M/S Patel Unity Joint Venture (PUJV), has been
awarded Package II (Civil Works for Tenga Dam, River diversion, Tenga
Intake and Head Race Tunnel) and Package III (Civil works of Head Race
Tunnel, Surge Shaft, Pressure Tunnels, Power House and Tail Race
Tunnels) in connection with Kameng Hydro Electric Project being
executed in Arunachal Pradesh.
II.
A dispute arose and referred to the Arbitral Tribunal culminated in
passing of arbitral award in favour of the petitioner. Aggrieved whereof,
respondent-North Eastern Electric Power Corporation Limited, filed an
application under Section 34 of the Arbitration and Conciliation Act (AC
MC (ARB.A) No.3/2017
Act) for setting aside the Arbitral Award before the Additional Deputy
Commissioner (Judicial), Shillong. Application stand rejected vide order
dated 21.04.2016, the award as such upheld.
III.
The petitioner too had a grievance against para 27 of the order
passed by Additional Deputy Commissioner (Judicial) but did not opt to
file appeal under Section 37 of the Arbitration and Conciliation Act under
the belief that in the National interest dam is to be built, therefore,
respondent would not file the appeal but the respondent filed the appeal
titled “North Eastern Electric Power Corporation Ltd vs. M/S Patel Unity
Joint Venture (PUJV)” after the prescribed period of limitation. The
application seeking condonation of 32 days delay registered as
MC(ARB.A) No.4 of 2016 has been allowed by this Court vide order
dated 3rd May, 2017.
IV.
After allowing the said application, Appeal filed under Section 37
of the Arbitration and Conciliation Act was diarized and notice was issued
on 19th May, 2017. It is thereafter petitioner herein (respondent therein)
decided to file the cross objections, which, in terms of Order 41 Rule 22
of the Code of Civil Procedure, were to be filed within one month from
the date of service on him or his pleader of the day fixed for hearing the
appeal or within such further time as the Appellate Authority would find
fit to allow. Petitioner has filed application for condonation of delay for
filing cross objection on 29.06.2017, therefore, delay is of 10 days only.
V.
If the date for computation of limitation is to be reckoned from the
date of order of the Civil Court dated 21.04.2016, then the delay is of 322
days.
3)
Two important aspects, i.e. applicability of the Limitation Act and
the applicability of Code of Civil Procedure, have already been settled by
this Court in the order dated 03.05.2017 while disposing of MC(ARB.A)
No.4 of 2016 titled “North Eastern Electric Power Corporation Ltd vs.
M/S Patel Unity Joint Venture (PUJV)” as was filed by the respondent
herein for condoning the delay in preferring the appeal against the same
MC (ARB.A) No.3/2017
order of the Additional Deputy Commissioner (Judicial), Shillong. In the
said order, while referring to various judgments rendered by the Hon‟ble
Apex Court and by the Bombay High Court, it has been concluded that
the period of limitation for filing the appeal before the High Court against
an order passed under Section 34 of the AC Act, setting aside or refusing
to set aside an arbitral award, is governed by clause (a) of Article 116 of
the Schedule to the Limitation Act. It has been further referred in the
order that the Hon‟ble Supreme Court in “Consolidated Engineering
Enterprises vs. Principal Secretary, Irrigation Department” has held that
there is no specific exclusion of the Code of Civil in its applicability, to
the proceedings arising out of the AC Act, before a civil Court.
4)
Further support to the said position can be had from the judgment
rendered by the High Court of Delhi in the case of “Mahanagar Telephone
Nigam Limited Vs. Applied Electronics Ltd” (FAO (OS) 138/2013)
decided on 28.07.2014, reported in AIR 2014 Delhi 182. The Division
Bench of the Delhi High Court, relied on the judgment of the Hon‟ble
Supreme Court reported in (2004) 3 SCC 250, and quoted paras 15 and 19
of the said judgment, which are advantageous to be quoted here-under:
“15.Right to prefer cross objection partakes of the right
to prefer an appeal. When the impugned decree or
order is partly in favour of one party and partly in
favour of the other, one party may rest contended by
his partial success with a view to giving a quietus to
the litigation. However, he may like to exercise his
right of appeal if he finds that the other party was not
interested in burying the hatchet and proposed to keep
the (sic) alive by pursuing the same before the
appellate forum. He too may in such circumstances
exercise his right to file appeal by taking cross
objection. Thus taking any cross objection to the
decree or order impugned is the exercise of right of
appeal though such right is exercised in the form of
taking cross objection. The substantive right is the
right of appeal; the form of cross objection is a matter
of procedure.
19. in Superintending Engineer and Ors. V. B. Subba
Reddy (supra) a two Judges Bench of this Court
observed (vide para 24) “if there is no right of crossMC (ARB.A) No.3/2017
objection given under Section 39 of the Act, it cannot
be read into Section 41 of the Act. Filing of cross
objection is not procedural in nature. Section 41 of the
Act merely prescribes that the procedure of the code
would be applicable to the appeal under Section 39 of
the Act. We are, therefore, of the opinion that cross
objection by the respondent was not maintainable…”
Such observation is not correct and proceeds on certain
wrong premises. Firstly, form of cross objection is
procedural and is only a manner of exercising right of
appeal which is substantive, as we have already stated.
Secondly, it is not merely the procedure prescribed by
the Code of Civil Procedure which has been made
applicable to proceedings under the Arbitration Act by
Section 41(a) of the Act; the entire body of the Code of
Civil Procedure, 1908 has been made applicable to all
proceedings before the Court and to all appeals under
the Arbitration Act, 1940, the provision is general and
wide in its applicability which cannot be curtailed; that
only exception being where (sic) provisions of the
Arbitration Act and/or of rules made thereunder may
be inconsistent with the provisions of the Code of Civil
Procedure, 1909 in which case the applicability of the
latter shall stand excluded but only to the extent of
inconsistency. We may hasten to add that to the extent
of our disagreement with the law laid down in B.
Subba Reddy‟s case, the proposition appears to have
been rather widely stated in that case. In fact the
question before the Court in B. Subba Reddy‟s case
was whether cross objection seeking the relief of
award of interest at a higher rate was maintainable
though such an order did not fall within the purview of
Section 39(1) of the Act.”
5)
Paras 14 and 15 of the judgment rendered by Division Bench of
Delhi High Court are also relevant to be quoted:
“14. With reference to applicability of the Civil
Procedure Code under Section 37 of the said Act, the
learned counsel for the applicant has cited the case as
ITI vs. Siemens Ltd.: MANU/SC/0502/2002 : AIR
2002 SC 2308. Relevant para(s) are reproduced below:9. But Mr. Parsaran contended that the said order
is based on an earlier reported judgment of this
Court in the case of Shyam Sunder Agarwal &
Co. v. Union of India MANU/SC/0350/1996 :
[1996] 1 SCR 245. According to Mr. Parsaran,
the Court in the case of Nirma Ltd. (supra) has
MC (ARB.A) No.3/2017
erroneously founded its conclusion on the said
judgment in Shyam Sunder Agarwal‟s case.
Learned counsel argued that the case of Shyam
Sunder Agarwal (supra) arose under the
Arbitration Act, 1940 which Act had made the
provisions of the Code specifically applicable to
proceedings arising under the said Act in the civil
court whereas in the present Act such provision
making the Code applicable is not found.
Therefore, there is a substantial difference in law
between the cases of Shyam Sunder Agarwal
(supra) and Nirma Ltd. (supra). Therefore, the
order of this Court in Nirma Ltd. (supra) is not a
good law, hence, requires reconsideration.
10. We do not agree with this submission of the
learned counsel. It is true in the present Act
application of the Code is not specifically
provided for but what is to be noted is: Is there an
express prohibition against the application of the
Code to a proceeding arising out of the Act
before a civil court? We find no such specific
exclusion of the Code in the present Act. When
there is no express exclusion, we cannot by
inference hold that the Code is not applicable.
15. It was also contended by the applicant that in a
recent case reported as Satpal P. Malhotra and Ors. Vs.
Puneet Malhotra and Ors. (Arbitration Appeal
No.12/2010 decided on 14.06.2013) the Bombay High
Court has followed the decision in MCD v.
International Security Intelligence Agency Ltd. (supra)
and ruled that there is no bar to applying the Civil
Procedure Code in proceedings of the Court under
Section 37 of the said Act in the following terms:90. In my view, the provisions of the Code of
Civil Procedure, 1908 would apply to the
arbitration proceedings filed in court to the
extent, it is not inconsistent with any of the
provisions of the Arbitration and Conciliation
Act, 1996. There is no bar under the provisions
of the Arbitration and Conciliation Act from
applicability of the provisions of the Code of
Civil Procedure, 1908 to the arbitration
proceedings filed in court. Section 19 of the
Arbitration Act provides that the Arbitral
Tribunal shall not be bound by the Code of Civil
Procedure, 1908. The said provision does not
apply to the proceedings filed in court including
MC (ARB.A) No.3/2017
arbitration application filed under Section 34 or
even appeal under section 37 of the Arbitration
and Conciliation Act, 1996. I am thus not
inclined to accept the submission of Mr. D„vitre,
the learned senior counsel appearing for the
appellants that right of filing cross objections
also must be provided under section 37 of the Act
and not having provided, cross objections would
not be maintainable. In my view, section 37 of
the Arbitration and Conciliation Act, 1996 has to
be read with the provision of the Code of Civil
Procedure, 1908 and in this case in particular
Order 41 Rule 22 thereof. If arbitration appeal
filed by the appellants in this court itself would
not have been maintainable, cross objections
filed by the respondents also in that event would
not be maintainable. On perusal of Order 41 Rule
22 Sub Rule 4, it is clear that if original appeal is
withdrawn or is dismissed for default, in such an
event, cross objections filed by the respondents
would nevertheless be heard and determined after
such notice to the other parties as the court thinks
fit.”
6)
Instant application, in essence, seeks condonation of delay in filing
the appeal (cross objections). The period of limitation for filing cross
objections, in terms of Order 41 Rule 22 of the Code of Civil Procedure,
is one month from the date of service of notice for hearing of the appeal
which, in the appeal filed by the respondent after condonation of delay,
has been issued on 19.05.2017 whereas the present petitioner has filed the
application seeking condonation of delay on 29th June, 2017. That being
so, there is delay of only ten (10) days.
7)
It is the contention of learned counsel for the respondent that there
is no explanation for huge delay of 332 days. The petitioner cannot take
refuge under Order 41 Rule 22 of the Code of Civil Procedure so as to
claim that he could file cross objections within one month from the date
notice was issued in the appeal of the respondent. The petitioner was
conscious and aware that along with application seeking condonation of
delay, memo of appeal has been filed. Once the application seeking
condonation was filed, the petitioner too should have taken steps for filing
the appeal (cross objection). Such a contention is without substance
MC (ARB.A) No.3/2017
because the petitioner has tendered an explanation that he was not
inclined to prefer any appeal as he was under bona fide belief that in the
public interest i.e. for the execution of dam of national importance,
respondent will not file appeal but the respondent after due deliberations
and after hesitation decided to file appeal beyond the prescribed period of
limitation. Until condonation and then until service of notice in the
appeal, the petitioner could not file the cross objection. He invoked the
right under Order 41 Rule 22 CPC i.e. to file cross objections which he
could do only when the service of notice in the main appeal was effected
upon him. Admittedly, notice in the appeal after condonation of delay has
been issued on 19th May, 2017, so formally appeal was registered and it is
only after its registration and issuance of notice for its hearing, petitioner
got a cause for filing the cross objection.
8)
Even otherwise, when against the order of Additional Deputy
Commissioner (Judicial), appeal of the respondent has been entertained
after condonation of delay, it would be in the better interests of both the
parties and for avoiding protraction of the proceedings to hear also the
cross objections, in the final analysis there will be adjudication on merits.
9)
True it is that law of limitation has to be applied harshly when
complete indolence is attributable to the seeker thereof. It is also equally
true that the words “sufficient cause” for not preferring the appeal or cross
objection well within time have to be construed liberally so as to advance
the cause of justice. When substantial justice and technical justice are
pitted against each other, then former has a preference. No straightjacket
formula is to be applied for condoning or not condoning the delay. Every
case has its own peculiar facts and features and it is in the same
background “sufficient cause” has to be given liberal construction or strict
construction.
10)
Petitioner cannot be blamed for his delayed action when he is
specific in his pleadings to allege that he was under bona fide belief and
sure that in the larger interests of construction of dam of national
importance, the respondent will not file the appeal which belief was
MC (ARB.A) No.3/2017
proved to be correct because the respondent filed the appeal after the
prescribed period of limitation.
11)
By allowing application of the petitioner, the worst that will happen
is that the cross objection too will be decided on its merits along with the
appeal of the respondent as has already been entertained for hearing after
the delay having been condoned.
12)
Regarding applicability of the Limitation Act as well as Code of
Civil Procedure, in-keeping with the spirit of Sections 19 and 43 of the
AC Act, 1996, which have been specifically referred to in the two
judgments, one rendered by this Court in MC(Arb.A) No.4/2016 dated 3 rd
May, 2017 arising out of the same lis and another in the judgment
rendered by the Delhi High Court in “Mahanagar Telephone Nigam Ltd.
vs. Applied Electronics Ltd.” as referred to above, there is no scope for
taking a contrary view.
13)
Viewed thus, the delay in filing the cross objection having been
explained satisfactorily, therefore, application is allowed, delay condoned.
Memo of appeal (cross objection) as filed along with the application be
diarized and listed along with the appeal of the respondent titled “North
Eastern Electric Power Corporation Ltd. vs. M/S Patel Unity Joint
Venture (PUJV)” which has already been directed to be listed on 09-072018.
14)
MC(ARB.A) No.3/2017 seeking condonation is disposed of as
above.
(S. R. Sen)
Judge
(Mohammad Yaqoob Mir)
Chief Justice
Meghalaya
05-06-2018
“Lam, PS”
MC (ARB.A) No.3/2017
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review