Full Judgment Text
Text read from the judgment PDF published on the High Court's eCourts portal, through the
Indian High Court Judgments open data set (Dattam Labs,
CC BY 4.0).
The court's own copy is the authoritative text.
2026:HHC:14423
IN THE HIGH COURT OF HIMACHAL PRADESH SHIMLA
Arb. Case No. 814/2024
Reserved on: 16.04.2026
Decided on: 04.05.2026
M/s Naveen Auto Store Sole Proprietary
…..Petitioner
Versus
Mahindra & Mahindra Ltd. & ors.
….Respondents
______________________________________________________________
Coram:
The Hon’ble Mr. Justice Romesh Verma, Judge.
Whether approved for reporting?1
For the Petitioner:
Mr. Tara Singh Chauhan, Sr. Advocate
with Mr. Surya Chauhan, Advocate.
For the Respondents: Mr. Subhash Chander, Advocate.
Romesh Verma, Judge
The present
petition
has been filed by the
petitioner under Section 9 of the Arbitration and Conciliation
Act, 1996 (for brevity, the Act) for grant of interim directions.
2.
The brief facts, for the adjudication of the instant
petition, are that the petitioner is a Sole Proprietorship concern
having its office-cum workshop, near UCO Bank, Ghumarwin,
District, Bilaspur, Himachal Pradesh. It is averred in the
1Whether reporters of the local papers may be allowed to see the judgment? Yes.
petition that the respondents were in need of Service Station for
their vehicles at Ghumarwin, District Bilaspur H.P. They issued
an advertisement in Punjab Kesari and Divya Himachal for
opening of Authorized Service Station in Himachal Pradesh. In
response
to
the
advertisement,
vide
Annexure
A-1,
the
petitioner made an offer to the respondents vide letter dated
21.06.1999 to open authorized service station of Mahindra and
Mahindra at Ghumarwin, District Bilaspur. The said offer was
made by the petitioner on 21.06.1999 and pursuant to that,
the respondents issued letter of intent (Annexure P-4) to the
petitioner on non-exclusive basis for a period of six months
from 01.08.2000, stipulating therein that based on performance
and inspection of the premises of the petitioner, appointment
will be confirmed by execution of an agreement.
3.
Finally, an agreement (Annexure P-5) was entered
between the parties on 28.06.2002, which was deemed to have
come into force w.e.f. 1.2.2001 and shall continue to remain in
force and also govern all transactions between the parties upto
31.03.2004. To the similar extent, fresh contract (Annexure P7) was executed on 10.7.2006 which was deemed to have come
into force and shall bind the parties w.e.f. 1.4.2004
to
31.3.2008. Another agreement (Annexure P-10) was entered
into between the parties in 2015 and the said agreement was
deemed to have come into force and shall bind the parties w.e.f.
1.4.2015 to 31.3.2018. Finally, vide Annexure P-11, an
agreement was entered between the parties w.e.f. 1.4.2021 to
31.3.2024. As per terms and conditions of the agreement
(Annexure P-11), the respondent-Company granted Mahindra
Authorised Service Centre (MASC) non-exclusive rights during
the continuance of the agreement to act as an MASC. The
respondent-company shall have the liberty to grant a right to
one or more person, entities and/or, MASC to service the said
products of the Company in the said territory or any part
thereof and further the Company shall have the right to service
the said products direct to the customers in the said territory.
In the agreement, the petitioner has been referred to as MASC.
Currency of the agreement, which took place between the
parties on 1.4.2021, was from 1.4.2021 to 31.3.2024. As per
clause 30 of the agreement, provision of arbitration has been
stipulated.
4.
As per the case set up by the petitioner, the
respondents accepted offer of the petitioner and told him that
service team shall visit the Auto store to assess the suitability
of the appointment of the petitioner as MASC. After completing
codal formalities,
the
petitioner deposited a sum of Rs.
25,000/-, copy of the letter dated 13.07.2000 along with the
DD (Annexure P-3). Thereafter on 01.08.2000 the letter of
intent Annexure P-4 was issued in favour of the petitioner. The
petitioner was directed by the respondents to create additional
facilities and make major arrangement for the workshop. The
respondents
asked the petitioner to deposit a sum of
Rs.25,000/- as security and the same was deposited on
23.3.2001. Then again respondent demanded
a draft of
Rs.25,000/- on 30.3.2001, which was again sent by the
petitioner as security draft to respondent. It is the case of the
petitioner
that
the
respondents
repeatedly
directed
the
petitioner to make huge investments like purchase of helpline
vehicle amounting to Rs. 5,18,252/-., demo vehicle, which was
modified to work as crane. Additional land was purchased by
the petitioner for expanding the workshop. The demands were
raised by the respondents to purchase, tools, machinery,
special tools. The said purchases were made by the petitioner
by investing
huge amount vide invoice No.
0504 worth
Rs.94,725/-; on 15.06.2011, he purchased 2 post lift from
National Automobiles against invoice No. 905 worth Rs
1,10,930/- ; on 18.06.2011, he purchased air compressor from
National Automobiles against invoice No. 917 worth Rs.
70,800/- and on 25.06.2011 he purchased 5 tool trolleys from
National Automobiles against invoice number 941 worth
Rs.25000/-.
5.
In
2011-2012,
petitioner
to
open
his
the
respondents
personal
and
directed
commercial
the
codes
separately. Petitioner as per the demand again had to purchase
special tools as per the requirements of the respondents.
6.
As per requirement of the respondents, a sofa set
and other furniture was also placed in the customer lounge,
which was purchased from Worlds at Home S Daman on
16.04.2012 amounting to Rs.35438/-. Workers were sent for
training on 30.04.2013 and the training fees was Rs. 7415/-.
Other expenses incurred by the petitioner were Rs 25000/-.
Thereafter, two more technicians were sent for training on
20.05.2013 and
the petitioner paid fees of Rs. 6540/- and
incurred other expenses
amounting to Rs.6000/-. The
petitioner also purchased posters, sign boards, sun board
panels etc from Supreme Graphics, Mumbai, on 12.07.2013
worth Rs. 25,527/-. The respondents again demanded security
amount of Rs. 2 Lakhs for the personal code, which was sent
on 07.11.2013 vide draft No. 868432.
7.
In the year 2012-2013, as per the requirement made
by the respondents, the petitioner upgraded and expanded the
workshop area, so that the workshop can be used for
commercial & personal vehicles. In order to fulfill the demand
of the respondents, the petitioner had to purchase land worth
Rs.10 lakhs and get installed Kota stone, tiles, paint shed in
the workshop and tiles in the customer lounge amounting to
Rs. 64 lacs. The respondents did tie-up with Bosch and
through the respondents, the petitioner
had to order special
tools worth Rs 9 lacs in 2012 and he also sent draft of 9 lakhs
to Bosch, which supplied special tools for commercial or
personal
vehicles
to
the
petitioner
from
25.12.2012
to
27.11.2014. The tools were like i-smart Diagnostic tool for
personal, MST tools, mini smart for personal and commercial
etc.
8.
In the year 2013, DMS (Dealer Management System)
was installed in computers, which were purchased from Wipro
company by petitioner and installation fees of Rs 50,000/- was
charged from petitioner for commercial code and Personal Code.
On 31.10.2018, the petitioner sent his employees for co-tech
training on the request of the respondents and accordingly paid
fees of Rs 13,275/- and other expenses of Rs. 28000/-.
9.
It is averred that on the demand of the respondents,
the petitioner has made huge investment even when the
agreement was not renewed by them.
After the last agreement
having been executed between the
parties w.e.f. 1.4.2021 to
31.3.2024, login i.d. of the petitioner for repairing the vehicles
was blocked.
The
petitioner
has
shared
all information
regarding the aforesaid inaction to the employees of company
like CCM, RCCM, Area office Chandigarh & Delhi office and
Head Office Mumbai and informed everyone about this and sent
various e-mails, (Annexure P-12 colly.) to the respondents for
redressal of his grievance, but till date no steps have been
taken by the respondents for the redressal of the grievances of
the petitioner. Even, on 30.03.2024 for order, petitioner paid
through RTGS Rs 1,10,000/- in commercial code and Rs
30,000/- in personal code for Mahindra. It is further averred
that notice to invoke arbitration has already been served upon
the respondents vide Annexure P-13. On account of blocking of
i.d., the petitioner is not able to get the service of the vehicles
and the petitioner has suffered huge financial losses under
various heads amounting to Rs.1,05,00,000/-(One crore and
five lakhs). Therefore, the petitioner has approached this Court
by medium of instant petition praying therein issuance of
interim
direction
to
the
respondents
to
restore
dealer
management system of workshop of the petitioner and allow
him to repair the vehicle of the respondents.
10.
This Court issued notice to the respondents on
14.11.2024
and
on
5.12.2024,
Mr.
Subhash
Chander,
Advocate, appeared for the respondent and time was granted to
him to file the power of attorney.
11.
The instant petition has been duly replied by the
respondent. Various preliminary objections with regard to
maintainability, petition being
pre-mature,
agreement being
over between the parties etc. were raised. On merits, it was
submitted that since agreement, which was entered between
the parties expired on 31.3.2024, therefore, the respondents
have closed the DMS code, as there is no enforceable
right
available to the petitioner to restore the same in absence of
any valid agreement. All the averments as made in the petition
have been denied in toto, though the execution of the
agreements from time to time has been admitted. They denied
the claim as put-forth after expiry of the agreement in March,
2024 as no cause of action accrues to the
petitioner. It is
admitted by the respondents that dealer management system
code has been
blocked and the petitioner has requested
through e-mails for restoration of the DMS code, however it is
averred that the dealership has been given to the petitioner on
the basis of the agreement for a particular period nor for
infinity. Therefore, the respondent has prayed for dismissal of
the present petition.
12.
The petitioner has filed rejoinder reiterating therein
the averments as taken in the petition and denying the
averments, which are contrary to record, as contained in the
reply and submitted that the application
bearing Arbitration
Case No. 16/2025 for appointment of the Arbitrator filed by
him is pending adjudication before this Court.
13.
I have heard the learned counsel for the parties and
have also gone through the case file in detail.
14.
The petitioner has approached this Court seeking
interim relief under Section 9 of the Act, which reads as under:
9. Interim measures by Court etc.-A party may, before or
during arbitral proceedings or at any time after the
making of the arbitral award but before it is enforced in
accordance with section 36, apply to a court(I) for the appointment of a guardian for a minor or a
person of unsound mind for the purposes of arbitral
proceedings; or (II) for an interim measure of protection in
respect of any of the following matters, namely:(a) the preservation interim custody or sale of any goods
which are the subject-matter of the arbitration agreement;
(b) securing the amount in dispute in the arbitration;
(c) the detention, preservation or inspection of any
property or thing which is the subject-matter of the dispute
in arbitration, or as to which any question may arise
therein and authorizing for any of the aforesaid purposes
any person to enter upon any land or building in the
possession of any party, or authorizing any samples to be
taken or any observation to be made, or experiment to be
tried, which may be necessary or expedient for the
purpose of obtaining full information or evidence;
(d) interim injunction or the appointment of a receiver;
(e) such other interim measure of protection as may
appear to the court to be just and convenient, and the
Court shall have the same power for making orders as it
has for the purpose of and in relation to, any proceedings
before it.
15.
It is the precise case of the petitioner that since the
year 2000, the respondents have entered various agreements
from time to time with the petitioner for the establishment of
the service station and letter of intent was given to the
petitioner to that effect and after finding suitability of the
petitioner, the agreements were entered between the parties.
Currency as well terms and conditions have been stipulated in
each of the agreements.
16.
The
qualification
which
the
person
invoking
jurisdiction of the Court under Section 9 of the Act must
possess is of being a party to an arbitration agreement. A
person not party to an arbitration agreement cannot enter the
Court for protection under Section 9 of the Act. This has
relevance only to his locus standi as an applicant. This has
nothing to do with the relief which is sought for from the Court
or the right which is sought to be canvassed in support of the
relief. The right conferred by Section 9 of the Act is on a party
to an arbitration agreement. The time or the stage for invoking
the jurisdiction of Court under Section 9 of the Act can be (i)
before, or (ii) during arbitral proceeding, or (iii) at any time after
the making of the arbitral award, but before it is enforced in
accordance with Section 36 of the Act. The reliefs, which the
Court may allow to a party under clauses (i) and (ii) of Section
9 of the Act, flow from the power vesting in the Court
exercisable
by
reference
to
'contemplated',
'pending'
or
'completed' arbitral proceedings. The Court is conferred with
the same power for making the specified orders as it has for the
purpose of and in relation to any proceedings before it though
the venue of the proceedings in relation to which the power
under Section 9 of the Act is sought to be exercised is the
arbitral tribunal. Filing of an application by a party by virtue of
its being a party to an arbitration agreement is for securing a
relief which the Court has power to grant before, during or after
arbitral proceedings by virtue of Section 9 of the Act. The Court
under Section 9 of the Act is only formulating interim measures
so as to protect the right under adjudication before the arbitral
tribunal from being frustrated.
17.
In Firm Ashok Traders vs. Gurumukh
Das
Saluja, (2004) 3 SCC 155, the Hon’ble Supreme Court has
held as under:13. The A & C Act, 1996 is a long leap in the direction of
alternate dispute resolution systems. It is based on
UNCITRAL Model. The decided cases under the preceding
Act of 1940 have to be applied with caution for
determining the issues arising for decision under the new
Act. An application under Section 9 under the scheme of A
& C Act is to a suit. Undoubtedly, such application results
in initiation of civil proceedings but can it be said that a
party filling an application under Section 9 of the Act is
enforcing a right arising from a contract? "Party" is defined
in Clause (h) of sub- Section (1) of Section 2 of A & C Act to
mean 'a party to an arbitration agreement'. So, the right
conferred by Section 9 is on' a party to an arbitration
agreement. The time or the stage for invoking the
jurisdiction of Court under Section 9 can be (i) before, or (ii)
during arbitral proceeding, or (iii) at any time after the
making of the arbitral award but before it is enforced in
accordance with Section 36. With the pronouncement of
this Court in M/s Sundarum Finance Ltd. v. M/s NEPC
India Ltd., AIR (1999) SC 565 the doubts stand cleared
and set at rest and it is not necessary that arbitral
proceeding must be pending or at least a notice invoking
arbitration clause must have been issued before an
application under Section 9 is filed. A little later we will
revert again to this topic. For the moment suffice it to say
that the right conferred by Section 9 cannot be said to be
one arising out of a contract. The qualification which the
person invoking jurisdiction of the Court under Section
9 must possess is of being a party to an arbitration
agreement A person not party to an arbitration agreement
cannot enter the Court for protection under Section 9. This
has relevance only to his locus standi as an applicant.
This has nothing to do with the relief which is sought for
from the Court or the right which is sought to be
canvassed in support of the relief. The reliefs which the
Court may allow to a party under clauses (i) and (ii)
of Section 9 flow from the power vesting in the Court
exercisable by reference to 'contemplated', 'pending' or
'completed' arbitral proceedings. The Court is conferred
with the same power for making the specified orders as it
has for the purpose of and in relation to any proceedings
before it though the venue of the proceedings in relation to
which the power under Section 9 is sought to be exercised
is the arbitral tribunal. Under the scheme of A & C Act, the
arbitration clause is separable from other clauses of the
Partnership Deed. The arbitration clause constitutes an
agreement by itself. In short, filing of an application by a
party by virtue of its being a party to an arbitration
agreement is for securing a relief which the Court has
power to grant before, during or after arbitral proceedings
by virtue of Section 9 of the A & C Act. The relief sought
for in an application under Section 9 of A & C Act is
neither in a suit nor a right arising from a contract. The
right arising from the partnership deed or conferred by
the Partnership Act is being enforced in the arbitral
tribunal; the Court under Section 9 is only formulating
interim measures so as to protect the right under
adjudication before the arbitral tribunal from being
frustrated. Section 69 of the Partnership Act has no
bearing on the right of a party to an arbitration clause to
file an application under Section 9 of A & C Act.
14. In Jagdish Chandra Gupta's case (supra) Constitution
Bench approved of a liberal and full meaning being
assigned to the phrase 'other proceedings' in sub-Section
(3) of Section 69 of the Partnership Act untramelled by the
preceding words 'a claim of set-off. The Court refused to
countenance the plea for interpreting the words 'other
proceedings' ejusdem generis with the preceding words 'a
claim of set-off. M/s. Shreeram Finance Corporation.
(supra) calls for the effect of bar created by Section
69 being determined by reference to the date of institution
of the suit and not by reference to any subsequent
event. In Delhi Development Authority's case, this Court
held Section 69 of Partnership Act applicable to an
application under Section 20 of the Arbitration Act, 1940
as such an application (under the scheme of that Act)
would
be
included
within
the
meaning
of
'other
proceedings' in Section 69(3) of Partnership Act. In Kamal
Pushpa
Enterprises,
this
Court
held
that
the
bar
under Section 69 of Partnership Act is not applicable at
the stage of enforcement of the award by passing a decree
in terms thereof because the award crystallises the rights
of the parties and what is being enforced at that stage is
not any right arising from the objectionable contract. None
of the cases throws any direct light on the issue at hand.
Rather, the undercurrent of dictum in Kamal Pushpa
Enterprises lends support to the view we are tentatively
taking herein. We leave the matter at that and proceed to
examine the merits of the appeal as agreed to by all the
learned counsel appearing.
15. The most basic principle governing the discretion of the
Court in appointing a receiver is whether it is 'just and
convenient' to do so. A few factors are of relevance which
we proceed to record dispensing with the need of delving
into any detailed discussion. On the own showing of
Group "A", they have 20% share in the partnership
business and Group "B" has 18% share. The stand taken
by Group 'C', which according to Group "A" holds 62%
share, was not known before the High Court, and
therefore, so far as the High Court is concerned the tussle
was between the holders of 20% interest (Group "A") and
holders of 18% interest (Group "B"). In this appeal, Group
'C' is represented and has vocally supported Group "B"
standing by its side. Before us it is a case of holders of
20% interest claiming against the holders of 80% interest.
16. The finding recorded by the High Court is that it was
Group "B" which was running business upto the date of
passing of the order by it and was found entitled to
continue the same upto 31.12.2003, meaning thereby, for
nine months out of the total twelve months' period for
which the business is to run, it is Group "B" which has
been running the business. Excepting bald and general
allegations of mismanagement and siphoning off of the
fund
nothing
concrete
has
been
alleged
muchless
demonstrated to give real colour to the averments made.
The High Court has thought it proper to appoint Group "A"
as captain of the ship, which is the running business, to
sail for the remaining period of three months. We fail to
understand the logic behind such a change. It is a serious
matter to appoint a receiver, on a running business. The
High Court in spite of having formed an opinion in favour
of directing the appointment or receiver has rightly
observed that retail liquor trade is an intricate and tricky
trade and hence cannot be entrusted to a third party. If
that be so, we fail to appreciate the justification behind
turning out the persons in actual management of business
and passing on the reins in the hands of those who were
not holding the same for nine months out of the twelve. We
do not say that such a course has any prohibition in law
on being followed. But we do not think a case oppression
of minority by majority- the sense in which their term is
understood in law-having been made out on the material
available in the present case. A better course would have
been to allow the conduct of the business continuing in the
hands of persons who were doing so still now but at the
same time issuing such directions and/or devising such
arrangement as would protect and take care of the
interest of those who are not actually running the
business and that is what we propose to do.
17. There are two other factors which are weighing
heavily with us and which we proceed to record. As per
the law laid down by this Court in M/ s. Sundaram
Finance
Ltd
an
application
under Section
9 seeking
interim relief is maintainable even before commencement
of arbitral proceedings. What does that mean? In M/s.
Sundaram Finance Ltd., itself the Court has said"It is true that when an application under Section 9 is filed
before the commencement of the arbitral proceedings there
has to be manifest intention on the part of the applicant to
take recourse to the arbitral proceedings".
Section 9 permits application being filed in the Court
before the commencement of the arbitral proceedings but
the provision does not give any indication of how much
before. The word 'before' means inter alia, 'ahead of; in
presence or sight of; under the consideration or cognizance
of. The two events sought to be interconnected by use of
the term 'before' must have proximity of relationship by
reference to occurrence; the later event proximately
following the preceding event as a foreseeable or 'within
sight' certainty. The party invoking Section 9 may not have
actually commenced the arbitral proceedings but must be
able to satisfy the Court that the arbitral proceedings are
actually contemplated or manifestly intended (as M/s
Sundaram Finance Ltd. puts it) and are positively going to
commence within a reasonable time. What is a reasonable
time will depend on the facts and circumstances of each
case and the nature of interim relief sought for would itself
give an indication thereof. The distance of time must not
be such as would destroy the proximity of relationship of
the two events between which it exists and elapses. The
purposes of enacting Section 9, read in the light of the
Model Law and UNCITRAL Rules is to provide 'interim
measures of protection'. The order passed by the Court
should fall within the meaning of the expression 'an
interim measure of protection' as distinguished from an
all-time or permanent protection.
18. Under the A & C Act 1996, unlike the predecessor Act
of 1940, the arbitral tribunal is empowered by Section
17 of the Act to make orders amounting to interim
measures. The need for Section 9, in spite of Section
17 having been enacted, is that Section 17 would operate
only during the existence of the arbitral tribunal and its
being functional. During that period, the power conferred
on the arbitral tribunal under Section 17 and the power
conferred by the Court under Section 9 may overlap to
some extent but so far as the period pre and post the
arbitral proceedings is concerned the party requiring an
interim measure of protection shall have to approach only
the Court. The party having succeeded in securing an
interim measure of protection before arbitral proceedings
cannot afford to sit and sleep over the relief, conveniently
forgetting the 'proximately contemplated' or 'manifestly
intended' arbitral proceedings itself. If arbitral proceedings
are not commenced within a reasonable time of an order
under Section 9, the relationship between the order
under Section 9 and the arbitral proceedings would stand
snapped and the relief allowed to the party shall cease to
be an order made 'before' i.e. in contemplation of arbitral
proceedings. The Court, approached by a party with an
application under Section 9, is justified in asking the party
and being told how and when the party approaching the
Court proposes to commence the arbitral proceedings.
Rather, the scheme in which Section 9 is placed obligates
the Court to do so. The Court may also while passing an
order under Section 9 put the party on terms and may
recall the order if the party commits breach of the terms.
18.
The
Hon’ble
Supreme
Steels Ltd. vs. Orissa Minerals
Court
in
Adhunik
and Minerals (P) Ltd.,
(2007) 7 SCC 125, has held as under:“18. The approach that at the initial stage, only the
existence of an arbitration clause need be considered is
not justified. In The Siskina [1979] AC 210, Lord Diplock
explained the position:
"A right to obtain an interlocutory injunction is not a
cause of action. It cannot stand on its own. It is
dependent upon there being a pre-existing cause of
action against the defendant arising out of an invasion,
actual or threatened by him, of a legal or equitable right
of the plaintiff for the enforcement of which the
defendant is amenable to the jurisdiction of the court.
The right to obtain an interlocutory injunction is merely
ancillary and incidental to the pre-existing cause of
action. It is granted to preserve the status quo pending
the ascertainment by the court of the rights of the parties
and the grant to the plaintiff of the relief to which his
cause of action entitles him, which may or may not
include a final injunction."
He concluded:
To come within the sub-rule the injunction sought in the
action must be part of the substantive relief to which the
plaintiff's cause of action entitles him; and the thing that
it is sought to restrain the foreign defendant from doing
in England must amount to an invasion of some legal or
equitable right belonging to the plaintiff in this country
and enforceable here by a final judgment for an
injunction.
19. Recently, in Fourie Vs. Le Roux [2007] 1 W.L.R. 320,
the House of Lords speaking through Lord Scott of Foscote
stated:
"An interlocutory injunction, like any other interim
order, is intended to be of temporary duration,
dependent on the institution and progress of some
proceedings for substantive relief."
and concluded:
"Whenever an interlocutory injunction is applied for,
the judge, if otherwise minded to make the order,
should, as a matter of good practice, pay careful
attention to the substantive relief that is, or will be,
sought. The interlocutory injunction in aid of the
substantive relief should not place a greater burden
on the respondent than is necessary. The yardstick
in section
37(1) of
the
Act,
"just
and
convenient", must be applied having regard to the
interests not only of the claimant but also of the
defendant."
20. No special condition is contained in Section 9 of the
Act. No special procedure is indicated. In American
Jurisprudence, 2nd Edition it is stated:
"In judicial proceedings under arbitration statutes
ordinary rules of practice and procedure govern
where none are specified; and even those prescribed
by statute are frequently analogous to others in
common use and are subject to similar interpretation
by the courts."
19.
The right to obtain an interlocutory injunction is
merely ancillary and incidental to the pre-existing cause of
action. It is granted to preserve the status quo pending the
ascertainment by the court of the rights of the parties and the
grant to the plaintiff of the relief to which his cause of action
entitles him, which may or may not include a final injunction.
20.
To the same effect is the judgment of the Hon’ble
Supreme Court in Civil Appeal No/2022 arising out of SLP(C)
No.3187 of 2021, titled as Essar House Private Limited vs. Arcellor
Mittal Nippon Steel India Limited, wherein it was held as under:-
43. Many High Courts have also proceeded on the
principle that the powers of a Court under Section 9 of the
Arbitration Act are wider than the powers under the
provisions of the CPC.
44. In Ajay Singh & Ors. v. Kal Airways Private Limited
and Ors. the Delhi High Court correctly held :
“...Section 9 grants wide powers to the courts in fashioning
an appropriate interim order, is apparent from its text.
Nevertheless, what the authorities stress is that the
exercise of such power should be principled, premised on
some known guidelines - therefore, the analogy of Orders
38 and 39. Equally, the court should not find itself unduly
bound by the text of those provisions rather it is to follow
the underlying principles...”
45. In Jagdish Ahuja & Anr. v. Cupino Limited6, the
Bombay High Court correctly summarised the law in
Paragraph 6 extracted hereinbelow :“6. As far as Section 9 of the Act is concerned, it cannot be
said that this court, while considering a relief thereunder, is
strictly bound by the provisions of Order 38 Rule 5. As held
by our Courts, the scope of Section 9 of the Act is very
broad; the court has a discretion to grant thereunder a wide
range of interim measures of protection “as may appear to
the court to be just and convenient”, though such discretion
has to be exercised judiciously and not arbitrarily. The
court is, no doubt, guided by the principles which civil
courts ordinarily employ for considering interim relief,
particularly, Order 39 Rules 1 and 2 and Order 38 Rule 5;
the court, however, is not unduly bound by their texts. As
this court held in Nimbus Communications Limited v. Board
of Control for Cricket in India (Per D.Y. Chandrachud J, as
the learned Judge then was), the court, whilst exercising
power under Section 9, “must have due regard to the
underlying purpose of the conferment of the power under
the court which is to promote the efficacy of arbitration as a
form of dispute resolution.” The learned Judge further
observed as follows:
“Just as on the one hand the exercise of the power
under Section 9 cannot be carried out in an uncharted
territory ignoring the basic principles of procedural law
contained in the Code of Civil Procedure 1908, the
rigors of every procedural provision in the Code of Civil
Procedure 1908 cannot be put into place to defeat the
grant of relief which would subserve the paramount
interests of justice. A balance has to be drawn between
the two considerations in the facts of each case.”
46. In Valentine Maritime Ltd. v. Kreuz Subsea Pte. Ltd. &
Anr., the High Court held :“88. ...It is now a well settled legal position, that at least
with respect to Chartered High Courts, the power to grant
temporary injunctions are not confined to the statutory
provisions alone. The Chartered High Courts had an
inherent power under the general equity jurisdiction to
grant temporary injunctions independently of the provisions
of the Code of Civil Procedure, 1908...”
xxx xxx xxx
93. Insofar as judgment of Supreme Court in case of
Raman Tech. & Process Engg. Co.(supra) relied upon
by Mr. Narichania, learned senior counsel for the VML
is concerned, it is held by the Hon'ble Supreme Court
that merely having a just or valid claim or a prima
facie case, will not entitle the plaintiff to an order of
attachment
before
judgment,
unless
he
also
establishes that the defendant is attempting to remove
or dispose of his assets with the intention of defeating
the decree that may be passed. The Hon'ble Supreme
Court has further held that the purpose of Order 38
Rule 5 is not to convert an unsecured debt into a
secured debt. The said judgment of the Hon'ble
Supreme Court was not in respect of the powers of
court
under section
9 of
the
Arbitration
and
Conciliation Act, 1996 but was in respect of power
under Order 38 Rule 5 of the Code of Civil Procedure,
1908 in a suit. Even otherwise, the said judgment is
distinguishable in the facts of this case.
xxx xxx xxx
95. Insofar as judgment of this Court delivered by the
Division Bench of this court in case of Nimbus
Communications Limited v. Board of Control for Cricket
in India (supra) relied upon by the learned senior
counsel for the VML is concerned, this Court adverted
to the judgment of Hon'ble Supreme Court in case
of Adhunik Steels Ltd. v. Orissa Manganese and
Minerals (P) Ltd., (2007) 7 SCC 125 and held that in
view of the decision of the Supreme Court in case
of Adhunik Steels Ltd., (supra) the view of the Division
Bench in case of National Shipping Company of Saudi
Arabia (supra) that the exercise of power under section
9(ii)(b) is not controlled by the provisions of the Code of
Civil Procedure, 1908 cannot stand. This court in the
said
judgment of Nimbus
Communications
Limited (supra) held that the exercise of the power
under section 9 of the Arbitration Act cannot be totally
independent of the basic principles governing grant of
interim injunction by the civil Court, at the same time,
the Court when it decides the petition under section 9,
must have due regard to the underlying purpose of the
conferment of the power upon the Court which is to
promote the efficacy of arbitration as a form of dispute
resolution.
96. This court held that just as on the one hand the
exercise of the power under Section 9 cannot be
carried out in an uncharted territory ignoring the basic
principles of procedural law contained in the Code of
Civil Procedure, 1908, the rigors of every procedural
provision in the Code of Civil Procedure, 1908 cannot
be put into place to defeat the grant of relief which
would sub-serve the paramount interests of justice. A
balance
has
to
be
drawn
considerations
in
the
facts
of
between
the
two
each
case.
The
principles laid down in the Code of Civil Procedure,
1908 for the grant of interlocutory remedies must
furnish a guide to the Court when it determines an
application under Section 9 of the Arbitration and
Conciliation Act, 1996. The underlying basis of Order
38 Rule 5 therefore has to be borne in mind while
deciding an application under Section 9 (ii) (b) of
the Arbitration Act.
xxx xxx xxx
104. The Division Bench of this court in case of Deccan
Chronicle Holdings Limited v. L & T Finance Ltd., 2013
SCC OnLine Bom 1005 after adverting to the judgment
of Supreme Court in case of Adhunik Steel Ltd. (supra),
judgment of the Division Bench of this court in case
of Nimbus Communications Ltd. (supra) held that the
rigors of every procedural provision of the Code of Civil
Procedure cannot be put into place to defeat the grant
of relief
which
would sub-serve the paramount
interests of the justice. The object of preserving the
efficacy of arbitration as an effective form of dispute
resolution
must
be
duly
fulfilled.
This
would
necessarily mean that in deciding an application
under Section 9, the Court would while bearing in
mind
the fundamental principles underlying
the
provisions of the Code of Civil Procedure, at the same
time, have the discretion to mould the relief in
appropriate cases to secure the ends of justice and to
preserve the sanctity of the arbitral process. The
Division Bench of this Court in the said judgment did
not interfere with the order passed by the learned
Single Judge directing the parties to furnish security
so as to secure the claim of the original petitioner in
arbitration by applying principles of Order 38 Rule 5 of
the Code of Civil Procedure. …”
47. In Srei Infrastructure Finance Limited v. M/s. Ravi
Udyog Pvt. Ltd & Anr.8, the Calcutta High Court, speaking
through one of us (Indira Banerjee, J.), as Judge of that
Court, said :“An application under section 9 of the Arbitration &
Conciliation Act, 1996 for interim relief is not to be
judged as per the standards of a plaint in a suit. If
the relevant facts pleaded, read with the documents
annexed to the petition, warrant the grant of interim
relief, interim relief ought not to be refused by
recourse to technicalities...”
48. Section 9 of the Arbitration Act confers wide power on
the Court to pass orders securing the amount in dispute in
arbitration, whether before the commencement of the
arbitral proceedings, during the arbitral proceedings or at
any time after making of the arbitral award, but before its
enforcement
in
accordance
with Section
36 of
the
Arbitration Act. All that the Court is required to see is,
whether the applicant for interim measure has a good
prima facie case, whether the balance of convenience is in
favour of interim relief as prayed for being granted and
whether the applicant has approached the court with
reasonable expedition.
49. If a strong prima facie case is made out and the
balance of convenience is in favour of interim relief being
granted, the Court exercising power under Section 9 of the
Arbitration Act should not withhold relief on the mere
technicality of absence of averments, incorporating the
grounds for attachment before judgment under Order 38
Rule 5 of the CPC.”
21.
The proposition, as laid down by the Hon’ble
Supreme Court with respect to grant of interim relief under
Section 9 of the Act, defines that in order to avail remedy, the
party must have a strong prima facie case in his/her favour.
22.
In the present case, admittedly, the parties entered
into agreement for the first time on 1.2.2001. Currency of the
said agreement was upto 31.3.2004 and vide letter of intent,
the respondents appointed the petitioner provisionally as MASC
for their vehicles at Bilaspur. It was stipulated therein that
based on the performance and inspection of the premises,
appointment may be confirmed by execution of the agreement.
Lastly, the agreement was entered between the parties on
1.4.2021, which ended on 31.3.2024, copy whereof is Annexure
P-11. The averments as made in the petition in conjunction
with the documents, which have been placed on record,
demonstrates that the petitioner has invested and spent a
considerable amount for the set up of the Service Station on the
basis of the agreements, which were entered
between the
parties from time to time. Details of the expenditures, which
have been made by the petitioner has been given in detail in the
present petition and veracity of the same shall be adjudicated
by the competent authority.
23.
For the purpose of the grant of interim protection
under Section 9 of the Act, the petitioner has made out a case
as the dealer management system, which was installed in the
computers,
has been blocked after the completion of the
agreement, on 31.3.2024. In order to show bona fides, the
petitioner served the respondents for invoking arbitration. In
the rejoinder to the reply filed by the respondents, the
petitioner has averred that he has filed an application
appointment
of the Arbitrator
being Arbitration
for
Case No.
16/2025, which is pending adjudication before this Court.
24.
It is contended by the learned senior counsel for the
petitioner that huge investment and expenditure
has been
made by the petitioner in the Service Station established by him
and on account of blocking of the log in I.D. for repairing
vehicles, everything has come to halt.
It is the case of the
petitioner that apart from the huge expenditure he has incurred
on the demand of the respondents for the service station,
employees which he had hired at the service station, are sitting
idle. Though an attempt was made by the petitioner to redress
his grievances by issuing communications including e-mails to
the respondents, but till date no steps have been taken by the
respondents.
25.
Learned counsel for the respondent has submitted
that since the agreement came to an end on 21.3.2024, no relief
can be granted to the petitioner in the attending
facts and
circumstances of the case.
26.
The Hon’ble Supreme Court in its various decisions
has come to the conclusion that Section 9 must be given
liberal and purposive construction so that arbitration
rendered bootless. It is mandate of the law
allows the parties
is not
that Section 9
to seek interim relief from the Court (i)
before, or (ii) during arbitral proceeding, or (iii) at any time after
the making of the arbitral award, but before it is enforced in
accordance with Section 36 of the Act. Under Section 9 of the
Act, the court can grant interim measures of protection in a
situation where there is danger of deterioration, damages,
destruction of goods and it is incumbent upon the court to
issue necessary measures for protection of the goods.
27.
It is the case of the petitioner that entire set up
which he has installed in the service station has become
useless and he has suffered losses, which are in crores. Said
aspect of the matter has to be taken into consideration in the
instant proceedings, however it is argued by the learned
counsel for the petitioner that by means of the interim
measures, the respondents be directed to restore the Dealer
Management System so that the petitioner can be allowed to do
his work in the service station.
28.
The petitioner has been able to demonstrate on
record that huge investment including purchases of various
tools, various investments, expenditure has been made in the
service station at the askance of the respondents. The
agreements, which were entered between the parties from time
to time, are clear and specific, therefore, the petitioner has been
able to make out a prima facie case for the grant interim relief
in his favour. Balance of convenience also lies in his favour. In
case the interim protection is not granted to the petitioner by
invoking Section 9 of the Act, he shall certainly suffer loss,
which cannot be compensated. Even otherwise, the petitioner
has approached this Court for the appointment of the Arbitrator
and in order to show his intent to resolve the issue by invoking
provisions of Act, the petitioner is entitled for interim relief.
29.
Having said so, I find merit in the instant petition
and the same is accordingly allowed. Consequently, the
respondents are directed to restore dealer management system
to the workshop of the petitioner till the time the Arbitrator is
appointed in the matter and application filed by the party, if
any, under Section 17 of the Act is decided.
04.05.2026
(pankaj)
(Romesh Verma)
Judge
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review