Judgments
LegalFirms.in Judgments · legalfirms.in/judgments/m-s-i-land-infrastructure-vs-mohammed-nazeer-ahmed-20261112/ · Printed 24 Nov 2026
Civil

M/S.i Land Infrastructure vs Mohammed Nazeer Ahmed

Add to a compilation

Keep judgments in folders, mark the paragraphs you rely on, and print a compilation with an index. It comes with the Research and Advocate Pro judgment plans and with a campus licence. Sign in · See the plans

Court
Karnataka High Court
Date
12 November 2026
Case No.
CMP 608/2025
Result
Allowed
Bench
H.t. Narendra Prasad
Cite this judgment
Citation
Link for your website or blog
Cite the court's own record or the law report in court filings.

The court's order

The closing paragraphs of the judgment, in the court's own words. The reasons are in the full text below.

11. Accordingly, the following: - 16 HC-KAR NC: 2026:KHC:62650 CMP No. 608 of 2025 CNR: KAHC010687622025 a) Civil Miscellaneous Petition is allowed. b) Sri M.Ramesh Rao, a retired District Judge, is appointed as the Sole Arbitrator in the present case to arbitrate the disputes between the parties at the Arbitration and Conciliation Centre (Domestic & International), Bengaluru, as per the Rules governing the said Arbitration Centre. c) All the claims and contentions of the parties are left open. d) Registry is directed to communicate this order via e-mail to the Arbitration and Conciliation Centre (Domestic & International), Khanija Bhavan, Bengaluru, and also to the learned Sole Arbitrator. e) Registry is directed to return all the original documents produced by any of the parties after obtaining Photostat copies of the same. - 17 HC-KAR NC: 2026:KHC:62650 CMP No. 608 of 2025 CNR: KAHC010687622025 f) Parties are directed to appear before the Director, Arbitration and Conciliation Centre, Bengaluru, on 17.12.2026 at 11:30 a.m.

Filed under

Arbitration and Conciliation Act, 1996 Section 11, Arbitration and Conciliation Act, 1996 Section 16, Arbitration and Conciliation Act, 1996 Arbitration and Conciliation Act

Guides on this topic, in plain language:

The law this judgment cites

Opens the section on Law Maker (lawmaker.in), our sister site for law students.

Full Judgment Text

Text read from the judgment PDF published on the High Court's eCourts portal, through the Indian High Court Judgments open data set (Dattam Labs, CC BY 4.0). The court's own copy is the authoritative text.

-1HC-KAR NC: 2026:KHC:62650 CMP No. 608 of 2025 CNR: KAHC010687622025 IN THE HIGH COURT OF KARNATAKA AT BENGALURU DATED THIS THE 12TH DAY OF NOVEMBER, 2026 BEFORE THE HON'BLE MR. JUSTICE H.T. NARENDRA PRASAD CIVIL MISC. PETITION NO. 608 OF 2025 BETWEEN: M/S.I LAND INFRASTRUCTURE A PARTNERSHIP FIRM HAVING ITS REGISTERED OFFICE AT NO.1535, 1ST FLOOR, 39TH CROSS 4TH T BLOCK, JAYANAGAR BANGALORE-560041 REPRESENTED BY ITS PARTNERS 1) YESHWANTH RAO KODLI 2) RAGHAVENDER GOUD KUNA AND 3) K.CHANDRA SHEKAR. …PETITIONERS (BY SRI. RADHANANDAN B S., ADVOCATE) AND: MOHAMMED NAZEER AHMED S/O LATE MOHAMMED HAYATH SAHEB AGED ABOUT 74 YEARS R/AT NO.575, 1ST A MAIN ROAD 6TH SECTOR, HSR LAYOUT BANGALORE - 560 103. ALSO AT APARTMENT NO.5A ROSA RESIDENCY LA MAZADA CHIKKANNA LAYOUT HBR LAYOUT, BENGALURU - 560 043 …RESPONDENT HAREKOPPA THIMMANNA GOWDA -2HC-KAR NC: 2026:KHC:62650 CMP No. 608 of 2025 CNR: KAHC010687622025 (BY SRI. VIREN MICHAEL PERES., ADVOCATE) THIS CMP IS FILED UNDER SECTION 11(5) OF THE ARBITRATION AND CONCILIATION ACT, 1996, PRAYING TO APPOINT A SOLE ARBITRATOR TO RESOLVE THE DISPUTE BETWEEN THE PARTIES HERETO AS PER CLAUSE 26 OF THE JOINT DEVELOPMENT AGREEMENT DATED 12.09.2014 AT ANNEXURE G, IN THE INTERESTS OF JUSTICE AND EQUITY. THIS PETITION, COMING ON FOR ORDERS, THIS DAY, ORDER WAS MADE THEREIN AS UNDER: CORAM: HON'BLE MR. JUSTICE H.T. NARENDRA PRASAD ORAL ORDER This petition is filed under Section 11(5) of the Arbitration and Conciliation Act, 1996 (for short, “the Act”), seeking appointment of a Sole Arbitrator for adjudication of the disputes that have arisen between the parties under the Joint Development Agreement (for short, ‘JDA’) dated 12.09.2014, particularly in terms of Clause 26 thereof, produced at Annexure-G. 2. The brief facts of the case are that the petitioner is a Partnership development firm, of engaged properties for in the business residential of purpose. Respondent is the absolute owner of the property bearing Sy.No.95/1, measuring 17.08 guntas HAREKOPPA THIMMANNA GOWDA at Singasandra -3HC-KAR NC: 2026:KHC:62650 CMP No. 608 of 2025 CNR: KAHC010687622025 Village, Begur Hobli, Bangalore South Taluk, Bangalore. Thereafter, the parties entered into a JDA dated 12.09.2014. Subsequently, disputes arose between the parties in relation to the said JDA. 3. As the disputes arose between the parties, the petitioner, invoking the arbitration clause contained in the JDA, issued a notice dated 05.05.2025, vide Annexure-L, to the respondent under Section 21 of the Act. The said Arbitration Clause 26 reads as under: “DISPUTE RESOLUTION: Any disputes / or differences whatsoever arising under or in connection with this Agreement which could not be settled by the parties through negotiations, shall be finally settled by arbitration in accordance with the Arbitration and conciliation Act, 1996 by an arbitral panel comprising appointed by the of three Owner arbitrators, one to be collectively, one by the Developer and the two arbitrators so appointed shall appoint the third arbitrators, who shall be the Chairman of the arbitral panel. All proceedings shall be conducted in English. The venue of arbitration shall be Bangalore. The decision of the arbitration shall be final and binding on both parties.” HAREKOPPA THIMMANNA GOWDA -4HC-KAR NC: 2026:KHC:62650 CMP No. 608 of 2025 CNR: KAHC010687622025 4. Despite service of the said notice, the respondent did not furnish any response. Hence, the present petition is filed seeking appointment of a sole Arbitrator. 5. The learned counsel for the respondent submits that subsequently, the parties have entered into a Memorandum of Understanding (for short, ‘MOU’), dated 28.11.2016 vide Annexure-J for cancellation of the JDA. In view of the above MOU, the JDA itself has been cancelled. Therefore, the petitioner cannot invoke the arbitration clause in the JDA. 6. The learned counsel for the petitioner relied on the judgment of the Apex Court in the case of Ashapura Mine-Chem Ltd. vs. Gujarat Mineral Development Corporation (SLP (C) No.1963/2014 disposed of on 16.04.2015) to contend that, once there is an arbitration clause in the agreement, the court has to refer the matter to the arbitrator to decide whether the agreement is existing or not, in spite of the termination of the agreement. HAREKOPPA THIMMANNA GOWDA -5HC-KAR NC: 2026:KHC:62650 CMP No. 608 of 2025 CNR: KAHC010687622025 7. Heard learned counsel for the parties and perused the petition papers. 8. It is not in dispute that the parties have entered into a JDA dated 12.09.2014 vide Annexure-G. Thereafter, they have also entered into a MOU for cancellation of the JDA and GPA as per Annexure-J dated 28.11.2016. Since the claim of the petitioners is in respect of the said JDA and in the said JDA, there is an arbitration clause, whether the JDA is cancelled or not, is the issue which has to be decided by the arbitrator. In so far as existence of arbitration clause is concerned, the clause survives termination/cancellation of the main agreement. Therefore, the dispute can be referred to an arbitrator. This issue has been considered by the Apex Court in the case of Ashapura Mine-Chem Ltd. (supra). The relevant paragraphs of the said judgment is extracted below: “20. In this context, we find, the reliance placed upon by Mr. Dushyant Dave, learned senior HAREKOPPA THIMMANNA GOWDA -6HC-KAR NC: 2026:KHC:62650 CMP No. 608 of 2025 CNR: KAHC010687622025 counsel for the appellant on the decisions in Reva Electrical Car Company Private Ltd. (supra), Today Homes and Infrastructure Pvt. Ltd. (supra) and Enercon (India) Limited (supra) fully support the stand of the appellant. The decision in Reva Electrical Car Company Private Ltd. (supra) was a case which arose under Section 11 of the Act. A question was raised on behalf of the respondent in the said case to the effect that with the termination of the MoU itself, the Arbitration Clause would cease to exist. Dealing with the said question, the learned Judge has held as under in paragraphs 54 and 55: "54. Under Section 16(1), the legislature makes it clear that while considering any objection with respect to the existence or validity of the arbitration agreement, the arbitration clause which formed part of the contract, has to be treated as an agreement independent of the other terms of the contract. To ensure that there is no misunderstanding, Section 16(1)(b) further provides that even if the Arbitral Tribunal concludes that the contract is null and void, it should not result, as a matter of law, in an automatic invalidation of the arbitration clause. Section 16(1)(a) presumes the existence of a valid arbitration clause and mandates the same to be treated as an agreement independent of the other terms of the contract. By virtue of Section 16(1)(b), it continues to be enforceable notwithstanding a declaration of the contract being null and void. In view of the provisions contained in Section 16(1) of the Arbitration and Conciliation Act, 1996, it would not be possible to accept the HAREKOPPA THIMMANNA GOWDA -7HC-KAR NC: 2026:KHC:62650 CMP No. 608 of 2025 CNR: KAHC010687622025 submission of Ms Ahmadi that with the termination of the MoU on 31-12-2007, the arbitration clause would also cease to exist. 55. As noticed earlier, the disputes that have arisen between the parties clearly relate to the subject-matter of the relationship between the parties which came into existence through the MoU. Clearly, therefore, the disputes raised by the petitioner need to be referred to arbitration. Under the arbitration clause, a reference was to be made that the disputes were to be referred to a single arbitrator. Since the parties have failed to appoint an arbitrator under the agreed procedure, it is necessary for this Court to appoint the arbitrator." (Emphasis added) 21. In Today Homes and Infrastructure Pvt. Ltd. (supra), this Court approved the statement of law stated by the learned Judge of this Court in Reva Electrical Car Company Private Ltd. (supra). Paragraph 14 can be usefully referred to which reads as under: "14. The same reasoning was adopted by a member of this Bench (S.S. Nijjar, J.), while deciding Reva Electric Car Co. (P) Ltd. v. Green Mobil, wherein the provisions of Section 16(1) in the backdrop of the doctrine of kompetenz kompetenz were considered and it was inter alia held that under Section 16(1), the legislature makes it clear that while considering any objection with regard to the existence or validity of the arbitration agreement, the arbitration clause, which formed part of the contract, had to be treated as an agreement independent of the other terms of the contract. Reference was made in the said judgment to the provisions of Section 16(1)(b) of the 1996 Act, which provides that HAREKOPPA THIMMANNA GOWDA -8HC-KAR NC: 2026:KHC:62650 CMP No. 608 of 2025 CNR: KAHC010687622025 even if the Arbitral Tribunal concludes that the contract is null and void, it should not result, as a matter of law, in an automatic invalidation of the arbitration clause. It was also held that Section 16(1)(a) of the 1996 Act presumes the existence of a valid arbitration clause and mandates the same to be treated as an agreement independent of the other terms of the contract. By virtue of Section 16(1)(b) of the 1996 Act, the arbitration clause continues to be enforceable, notwithstanding a declaration that the contract was null and void." (Emphasis added) 22. Again this very question came up for consideration in Enercon (India) Limited (supra) to which one of us (F.M.I Kalifulla, J.) was a party. In the said decision, the nature of transaction between the parties was more or less identical to the facts of this case. The contention raised on behalf of the appellant in that case was that there can be no arbitration agreement in the absence of a concluded contract, that, therefore, there was no question of an arbitration agreement coming into existence and, therefore, there was no scope for referring the dispute for arbitration. 23. As against the above submissions, it was contended on behalf of the respondent in the said decision that even if the existence of the main contract is under dispute, the Court is concerned only with the arbitration agreement, i.e. the arbitration clause and that when once such a Clause HAREKOPPA THIMMANNA GOWDA -9HC-KAR NC: 2026:KHC:62650 CMP No. 608 of 2025 CNR: KAHC010687622025 is very much present, that would by itself result in the matter being referable for arbitration. In fact, in the said case, the Clause relating to arbitration was found in Clause No.18.1 which provided for an attempt to resolve the dispute, controversy or difference through mutual consultation and if it is not resolved through mutual consultation within 30 days after commencement of discussion, then the parties may refer the dispute, controversy or difference for resolution to an Arbitral Tribunal. 24. Dealing with the said Clause and the arguments raised on behalf of the respective parties, the law has been laid down as under in paragraphs 82 and 83 which are to the following effect: "82. Further, the arbitration agreement contained in Clauses 18.1 to 18.3 of IPLA is very widely worded and would include all the disputes, controversies or differences concerning the legal relationship between the parties. It would include the disputes arising in respect of the IPLA with regard to its validity, interpretation, construction, performance, enforcement or its alleged breach. Whilst interpreting the arbitration agreement and/or the arbitration clause, the court must be conscious of the overarching policy of least intervention by courts or judicial authorities in matters covered by the Indian Arbitration Act, 1996. In view of the aforesaid, it is not possible for us to accept the submission of Mr Nariman that the arbitration agreement will perish as the IPLA has not been finalised. This is also because HAREKOPPA THIMMANNA GOWDA - 10 HC-KAR NC: 2026:KHC:62650 CMP No. 608 of 2025 CNR: KAHC010687622025 the arbitration clause (agreement) is independent of the underlying contract i.e. the IPLA containing the arbitration clause. Section 16 provides that the arbitration [pic]clause forming part of a contract shall be treated as an agreement independent of such a contract. 83. The concept of separability of the arbitration clause/agreement from the underlying contract is a necessity to ensure that the intention of the parties to resolve the disputes by arbitration does not evaporate into thin air with every challenge to the legality, validity, finality or breach of the underlying contract. The Indian Arbitration Act, 1996, as noticed above, under Section 16 accepts the concept that the main contract and the arbitration agreement form two independent contracts. Commercial rights and obligations are contained in the underlying, substantive, or the main contract. It is followed by a second contract, which expresses the agreement and the intention of the parties to resolve the disputes relating to the underlying contract through arbitration. A remedy is elected by parties outside the normal civil court remedy. It is true that support of the national courts would be required to ensure the success of arbitration, but this would not detract from the legitimacy or independence of the collateral arbitration agreement, even if it is contained in a contract, which is claimed to be void or voidable or unconcluded by one of the parties." (Emphasis added) 25. Mr. Vikas Singh, learned senior counsel for the respondent by referring to the Seven Judge Bench decision of this Court in Patel Engineering Ltd. (supra) sought to contend that the reliance placed upon the said decision by this Court in Today Homes and Infrastructure Pvt. Ltd. (supra) with HAREKOPPA THIMMANNA GOWDA - 11 HC-KAR NC: 2026:KHC:62650 CMP No. 608 of 2025 CNR: KAHC010687622025 particular reference to the position stated in paragraph 13 of the said judgment was not appropriate. 26. We are not inclined to entertain the said submission, as we find that we are not concerned with the said issue as to whether what was held in paragraph 13 of Today Homes and Infrastructure Pvt. Ltd. (supra) judgment was correct or not when it makes reference to the Seven Judge Bench decision in Patel Engineering Ltd.(supra). We are only concerned with the question whether an Arbitration Clause contained in the MoU is a stand alone agreement or not. For that purpose, what has been stated in Today Homes and Infrastructure Pvt. Ltd. (supra) in paragraph 14 is only relevant and we find the legal position stated therein in tune with the ratio decidendi laid down consistently by this Court in very many decisions. 27. The reliance was also placed upon the decision in National Insurance Company Ltd. (supra). Paragraphs 19, 20 and 21 were referred to in the said judgment. Paragraph 19 can be usefully referred, which reads as under: "19. In SBP & Co. v. Patel Engg. Ltd., a sevenJudge Bench of this Court considered the scope of Section 11 of the Act and held that the HAREKOPPA THIMMANNA GOWDA - 12 HC-KAR NC: 2026:KHC:62650 CMP No. 608 of 2025 CNR: KAHC010687622025 scheme of Section 11 of the Act required the Chief Justice or his designate to decide whether there is an arbitration agreement in terms of Section 7 of the Act before exercising his power under Section 11(6) of the Act and its implications. It was of the view that sub-sections (4), (5) and (6) of Section 11 of the new Act, combined the power vested in the court under Sections 8 and 20 of the old Act (the Arbitration Act, 1940). This Court held: (SCC pp. 660-61 & 663, paras 39 & 47) "39. It is necessary to define what exactly the Chief Justice, approached with an application under Section 11 of the Act, is to decide at that stage. Obviously, he has to decide his own jurisdiction in the sense, whether the party making the motion has approached the right High Court. He has to decide whether there is an arbitration agreement, as defined in the Act and whether the person who has made the request before him, is a party to such an agreement. It is necessary to indicate that he can also decide the question whether the claim was a dead one; or a long-barred claim that was sought to be resurrected and whether the parties have concluded the transaction by recording satisfaction of their mutual rights and obligations or by receiving the final payment without objection. It may not be possible at that stage, to decide whether a live claim made, is one which comes within the purview of the arbitration clause. It will be appropriate to leave that question to be decided by the Arbitral Tribunal on taking evidence, along with the merits of the claims involved in the arbitration. The Chief Justice has to decide whether the applicant has satisfied the conditions for appointing an arbitrator under Section 11(6) of the Act. For the purpose of taking a decision on these aspects, the Chief Justice can either proceed on the basis of affidavits and the documents produced or take such evidence or get such evidence recorded, as may be necessary. We think that adoption of this procedure in the context of the Act would best serve the purpose sought to be achieved by the HAREKOPPA THIMMANNA GOWDA - 13 HC-KAR NC: 2026:KHC:62650 CMP No. 608 of 2025 CNR: KAHC010687622025 Act of expediting the process of arbitration, without too many approaches to the court at various stages of the proceedings before the Arbitral Tribunal. *** 47. (iv) The Chief Justice or the Designated Judge will have the right to decide the preliminary aspects as indicated in the earlier part of this judgment. These will be his own jurisdiction to entertain the request, the existence of a valid arbitration agreement, the existence or otherwise of a live claim, the existence of the condition for the exercise of his power and on the qualifications of the arbitrator or arbitrators." 28. Having gone through the said paragraphs, we do not find any position in law contrary to what has been stated in Today Homes and Infrastructure Pvt. Ltd. (supra), Reva Electrical Car Company Private Ltd. (supra) and Enercon (India) Limited (supra). 29. Similarly, the reliance placed upon in Chloro Controls India Pvt. Ltd. (supra) also does not in any manner dislodge the legal position relating to the stand alone Arbitration Clause in a substantive transaction recorded in writing. Therefore, we do not find any useful purpose by referring to the said decision as well. 30. Having thus ascertained the legal position regarding the stand alone agreement relating to arbitration with particular reference to arbitration HAREKOPPA THIMMANNA GOWDA - 14 HC-KAR NC: 2026:KHC:62650 CMP No. 608 of 2025 CNR: KAHC010687622025 agreement in a legal transaction between the parties, when we refer to Clause 27 of the MoU, we wish to find out whether the said Clause satisfies the principles set down and applicable to a stand alone Arbitration Agreement. When we refer to Clause 27, we find that in the event of failure of an amicable settlement at the bilateral level relating to a dispute or difference arising between the appellant and the respondent to be reached as contained in Clause 26 of the MoU, then such unresolved dispute or difference concerning or arising from the MoU, its implementation breach or termination whatsoever including any difference or dispute as to the interpretation of any of the terms of the MoU is referable to the sole Arbitrator appointed by the appellant and the respondent. Therefore, irrespective of the question or as to the fact whether the MoU fructified into a full-fledged agreement, having regard to the non-fulfilment of any of the conditions or failure of compliance of any requirement by either of the parties stipulated in the other Clauses of MoU, specific agreement has been entered respondent into under by the Clause appellant to and refer the such controversies as between the parties to the sole arbitrator by consensus. Therefore, when consensus was not reached as between the parties HAREKOPPA THIMMANNA GOWDA - 15 HC-KAR NC: 2026:KHC:62650 CMP No. 608 of 2025 CNR: KAHC010687622025 for making the reference, eventually it will be open for either of the parties to invoke Section 11 of the Act and seek for reference of the dispute for arbitration.” 9. Under Section 16 of the Act, it is for the arbitrator to decide all these issues. Since there is an arbitration clause in the JDA, which is signed by both the parties, the matter requires to be referred to the arbitrator. 10. Having regard to the existence of the arbitration clause contained in the JDA, which provides for resolution of disputes arising between the parties, and the fact that the petitioner has duly invoked the said arbitration clause by issuing notice under Section 21 of the Act, and since both the parties have agreed for appointment of a Sole Arbitrator, this Court is of the opinion that a Sole Arbitrator is required to be appointed for adjudication of the disputes between the parties. 11. Accordingly, the following: HAREKOPPA THIMMANNA GOWDA - 16 HC-KAR NC: 2026:KHC:62650 CMP No. 608 of 2025 CNR: KAHC010687622025 ORDER a) Civil Miscellaneous Petition is allowed. b) Sri M.Ramesh Rao, a retired District Judge, is appointed as the Sole Arbitrator in the present case to arbitrate the disputes between the parties at the Arbitration and Conciliation Centre (Domestic & International), Bengaluru, as per the Rules governing the said Arbitration Centre. c) All the claims and contentions of the parties are left open. d) Registry is directed to communicate this order via e-mail to the Arbitration and Conciliation Centre (Domestic & International), Khanija Bhavan, Bengaluru, and also to the learned Sole Arbitrator. e) Registry is directed to return all the original documents produced by any of the parties after obtaining Photostat copies of the same. HAREKOPPA THIMMANNA GOWDA - 17 HC-KAR NC: 2026:KHC:62650 CMP No. 608 of 2025 CNR: KAHC010687622025 f) Parties are directed to appear before the Director, Arbitration and Conciliation Centre, Bengaluru, on 17.12.2026 at 11:30 a.m. HAREKOPPA THIMMANNA GOWDA (H.T. NARENDRA PRASAD) JUDGE CM LIST NO.: 1 SL NO.: 29

This page is for informational and research purposes only and does not constitute legal advice. Consult a qualified advocate for advice specific to your situation.

Is your name in this judgment and should it be masked, or is something on this page wrong? Request a review

All Karnataka HC judgments →

Arbitration & Mediation advocates near the Karnataka High Court

Dealing with a similar matter? Send a free enquiry to advocates who handle it. Fees are agreed with the advocate directly.

All Arbitration & Mediation advocates in India