IN THE HIGH COURT OF ORISSA AT CUTTACK
W.P.(C) No.31365 of 2025
(In the matters of a petition under Articles 226 and 227 of the
Constitution of India, 1950).
M/s. Bridge and Roof Company (India) ….
Ltd., Kolkata
-versusState of Orissa & Ors.
….
Petitioner(s)
Opposite Party(s)
Advocates appeared in the case through Hybrid Mode:
For Petitioner (s)
:
Mr. H. Gupta, Adv.
-versus-
For Opp. Party(s)
:
Mr. Rajdeep Pradhan, ASC
Mr. Gouri Mohan Rath, Adv.
On behalf of
Mr. Sidharth Shankar Padhy, Adv.
CORAM:
DR. JUSTICE SANJEEB K PANIGRAHI
DATES OF HEARING:- 16.12.2025
DATE OF JUDGMENT:- 09.01.2026
Dr. Sanjeeb K Panigrahi, J.
1. The present Writ Petition has been preferred seeking setting aside of
order dated 30.8.2025, passed by the Directorate of Industries, Cuttack in
MSEFC Case No. 68 of 2021.
I.
FACTUAL MATRIX OF THE CASE:
2. The brief facts of the case are as follows:
(i)
The Petitioner has filed the present Petition to correct a
jurisdictional error committed by the MSEF Council, vide its order
Page 1
Digitally Signed
Signed by: BHABAGRAHI JHANKAR
Reason: Authentication
Location: ORISSA HIGH COURT,
CUTTACK
Date: 15-Jan-2026 19:31:53
dated 30.8.2025 and has challenged the impugned order on the
ground of lack of inherent jurisdiction by the Council.
(ii)
The petitioner, M/s Bridge and Roof Company (India) Limited, is a
Government of India undertaking incorporated under the Indian
Companies Act, 1913, having its registered office at Kolkata. The
petitioner was engaged as the principal contractor for execution of
works relating to a power plant project of M/s Bhushan Energy
Limited at Dhenkanal, Odisha. In furtherance of the said project,
the petitioner issued a work order dated 11.6.2010 in favour of M/s
Adarsh Corporation Private Limited, the predecessor-in-interest of
Opposite Party No. 3, for execution of structural steel works at the
project site.
(iii)
The work order dated 11.6.2010 pertained to “Fabrication, Erection
and Painting of Structural Steel Work” in connection with the
power plant area. The contract is allegedly composite in nature,
involving labour, material, design coordination, erection, and site
execution. The contract value at the inception stood at
approximately Rs. 14.14 crores, subject to revisions. The terms of
the work order incorporated the Notice Inviting Tender and
Record Notes of Discussion as integral parts of the contractual
framework.
(iv)
Subsequently, on 19.9.2012, a formal amendment to the work order
was issued, recording the change in the name of the contractor
from M/s Adarsh Corporation Private Limited to M/s Adarsh
Noble Corporation Limited. This amendment did not alter the
Page 2
Digitally Signed
Signed by: BHABAGRAHI JHANKAR
Reason: Authentication
Location: ORISSA HIGH COURT,
CUTTACK
Date: 15-Jan-2026 19:31:53
scope of work but merely acknowledged the corporate name
change at the request of the contractor.
(v)
A second amendment followed on 29.6.2013, whereby the rates
were revised for quantities executed or to be executed after
30.9.2012. Notably, the scope of work remained unchanged, and
the contractual obligations continued to be governed by the
original terms. Over time, the cumulative value of the contract
increased to approximately Rs. 24.50 crores.
(vi)
On 28.10.2014,
the
petitioner
addressed
correspondence
to
Opposite Party No. 3 requesting deputation of an authorised
representative to discuss the progress and execution of the balance
work at site. Records of discussions held thereafter reflected
assurances by Opposite Party No. 3 to continue execution and
complete pending works within stipulated timelines.
(vii) A third and final amendment to the work order was issued
on 25.6.2015, whereby Opposite Party No. 3 undertook to complete
the entire scope of work on or before 31.5.2016. This amendment
did not enhance rates or expand scope but sought to bring finality
to execution timelines.
(viii) In the interregnum, Opposite Party No. 3 applied for Udyog
Aadhaar registration on 18.12.2015 under the provisions of the
Micro, Small and Medium Enterprises Development Act, 2006. The
registration was subsequent to the issuance of the work order and
its amendments but prior to certain later events forming part of the
dispute.
Page 3
Digitally Signed
Signed by: BHABAGRAHI JHANKAR
Reason: Authentication
Location: ORISSA HIGH COURT,
CUTTACK
Date: 15-Jan-2026 19:31:53
(ix)
On 10.5.2018, the petitioner issued a Mechanical Completion
Certificate in favour of Opposite Party No. 3. The petitioner asserts
that this certificate was issued solely for the limited purpose of
enabling surrender of the labour licence and did not signify full
and final completion of contractual obligations.
(x)
According to the petitioner, despite payments being released
against running bills, Opposite Party No. 3 failed to complete the
contracted work and eventually abandoned the site, leaving
portions of the work incomplete. The petitioner claims to have
incurred substantial losses on account of non-completion,
rectification, and statutory non-compliances attributable to
Opposite Party No. 3.
(xi)
On 19.8.2021, the petitioner received a notice indicating that
Opposite Party No. 3 had approached the Micro & Small
Enterprises Facilitation Council (MSEFC), Cuttack under Section
18 of the MSMED Act, 2006, initiating conciliation proceedings in
MSEFC Case No. 68 of 2021.
(xii) Subsequent thereto, on 26.9.2021, the petitioner had invoked the
arbitration clause contained in the General Conditions of Contract
and proposed appointment of an arbitrator, suggesting three
names in accordance with Clause 41 of the contract. The arbitration
clause stipulated Kolkata as the exclusive seat of arbitration.
(xiii) Opposite Party No. 3, by its reply dated 8.10.2021, declined to
participate in contractual arbitration and asserted that it had
already invoked the jurisdiction of the MSEFC.
Page 4
Digitally Signed
Signed by: BHABAGRAHI JHANKAR
Reason: Authentication
Location: ORISSA HIGH COURT,
CUTTACK
Date: 15-Jan-2026 19:31:53
(xiv) The petitioner thereafter filed an application under Section 11(6) of
the Arbitration and Conciliation Act, 1996 before the Calcutta High
Court, being A.P. No. 538 of 2021, seeking appointment of an
arbitrator in terms of the contract.
(xv) Meanwhile, the MSEFC conducted conciliation proceedings, which
ultimately failed. On 20.1.2022, the Council recorded failure of
conciliation and proceeded to initiate arbitration under Section
18(3) of the MSMED Act.
(xvi) Aggrieved by the assumption of jurisdiction by the Council, the
petitioner approached the Orissa High Court by filing W.P.(C) No.
5935 of 2022. By order dated 22.4.2022, the learned Single Judge set
aside the proceedings before the Council. However, in writ appeal
bearing W.A. No. 1124 of 2022, the Division Bench, by judgment
dated 18.06.2024, set aside the Single Judge’s order and remanded
the matter to the MSEFC for fresh consideration.
(xvii) Pursuant to remand, the MSEFC resumed proceedings and issued
fresh notices. In the meantime, the Government of Odisha notified
the Odisha Procurement Preference Policy for Micro & Small
Manufacturing
Enterprises on 24.1.2024,
and
subsequently,
on 5.3.2025, withdrew exemptions earlier extended to MSMEs in
works contracts.
(xviii)
On 12.8.2025, the MSEFC issued notice fixing the matter for
further hearing. In response, the petitioner filed an application
dated 26.8.2025 under
Section
of
the
Arbitration
and
Conciliation Act, 1996, specifically challenging the jurisdiction of
Page 5
Digitally Signed
Signed by: BHABAGRAHI JHANKAR
Reason: Authentication
Location: ORISSA HIGH COURT,
CUTTACK
Date: 15-Jan-2026 19:31:53
the Council on the ground that the underlying contract was a
works contract and therefore outside the ambit of the MSMED Act.
(xix) By order dated 30.8.2025, the MSEFC rejected the petitioner’s
Section 16 application without addressing the substance of the
jurisdictional objections raised therein and directed the petitioner
to file its statement of defence in the arbitration proceedings.
(xx) It is in these circumstances that the petitioner has approached this
Court by filing the present writ petition, seeking quashing of the
order dated 30.8.2025 passedin MSEFC Case No. 68 of 2021 and the
consequential proceedings pending before the Micro & Small
Enterprises Facilitation Council, Cuttack.
(xxi) Now that the facts leading up to the instant Petition has been laid
down, this Court shall endeavour to summarise the contentions of
the Parties and the broad grounds that have been raised.
II.
SUBMISSIONS ON BEHALF OF THE PETITIONER:
3. Learned counsel for the Petitioner earnestly made the following
submissions in support of his contentions:
(i)
The petitioner assails the proceedings initiated and continued by
the Micro & Small Enterprises Facilitation Council, Cuttack, on the
ground that the Council has acted wholly without inherent
jurisdiction. It is contended that the impugned proceedings arise
out of a pure works contract, which does not fall within the scope
of the Micro, Small and Medium Enterprises Development Act,
Page 6
Digitally Signed
Signed by: BHABAGRAHI JHANKAR
Reason: Authentication
Location: ORISSA HIGH COURT,
CUTTACK
Date: 15-Jan-2026 19:31:53
2006, and therefore the assumption of jurisdiction under Section 18
of the Act is fundamentally flawed.
(ii)
It is submitted that the work order dated 11.6.2010, together with
its
subsequent
amendments,
constitutes
a composite
and
indivisible works contract involving fabrication, erection, painting,
deployment of labour, use of heavy machinery, and on-site
execution. The petitioner argues that such a contract cannot be
artificially bifurcated into components of “supply of goods” or
“rendering of services” so as to attract the provisions of the
MSMED Act.
(iii)
According to the petitioner, the MSMED Act was enacted
primarily to address the issue of delayed payments for supply of
goods and rendering of services by micro and small enterprises. It
is contended that Parliament did not intend the Act to cover largescale infrastructure or construction contracts executed on a lumpsum or item-rate basis, which are governed by distinct contractual
and statutory regimes.
(iv)
The petitioner further submits that the Facilitation Council failed
to examine the nature of the contract as a threshold jurisdictional
issue. Instead of determining whether the dispute fell within the
statutory ambit of the Act, the Council proceeded mechanically to
assume jurisdiction, thereby committing a jurisdictional error
apparent on the face of the record.
(v)
It is also contended that the Opposite Party’s registration under
the MSMED Act was obtained on 18.12.2015, long after the
Page 7
Digitally Signed
Signed by: BHABAGRAHI JHANKAR
Reason: Authentication
Location: ORISSA HIGH COURT,
CUTTACK
Date: 15-Jan-2026 19:31:53
issuance of the original work order dated 11.06.2010 and after
substantial execution of the contract. The petitioner argues that
rights and obligations under a contract crystallise on the date of its
execution, and a subsequent registration cannot retrospectively
confer jurisdiction upon the Facilitation Council.
(vi)
The petitioner submits that permitting such retrospective
invocation would result in serious commercial uncertainty,
enabling contractors to unilaterally alter the dispute resolution
framework midstream, contrary to settled principles of contract
law and party autonomy. Emphasis is placed on the existence of
a contractual arbitration clause, which expressly provides for
resolution of disputes through arbitration with Kolkata as the seat.
The petitioner contends that the Facilitation Council could not
have overridden the agreed dispute resolution mechanism,
particularly when the dispute does not fall within the scope of the
MSMED Act.
(vii) The petitioner challenges
the rejection of
its application
under Section 16 of the Arbitration and Conciliation Act, 1996,
filed before the Facilitation Council on 26.8.2025. It is contended
that the Council failed to discharge its statutory obligation to
decide the question of jurisdiction as a preliminary issue and
instead rejected the application without meaningful reasoning.
According to the petitioner, the order dated 30.8.2025, rejecting the
Section 16 application, compels the petitioner to participate in
proceedings which are ex facie without jurisdiction. Such
Page 8
Digitally Signed
Signed by: BHABAGRAHI JHANKAR
Reason: Authentication
Location: ORISSA HIGH COURT,
CUTTACK
Date: 15-Jan-2026 19:31:53
compulsion, it is argued, results in irreparable prejudice and
defeats the principle that jurisdictional objections must be decided
at the earliest possible stage.
III.
SUBMISSIONS ON BEHALF OF THE OPPOSITE PARTIES:
4. Per contra, learned Counsel for the Opposite Parties earnestly made the
following submissions in support of his contentions:
(i)
The Opposite Parties oppose the Writ Petition and submit that the
present challenge is not maintainable in law, as the petitioner has
an effective and efficacious statutory remedy available under the
Arbitration and Conciliation Act, 1996. It is contended that once
the Facilitation Council has proceeded to arbitration under Section
18(3) of the MSMED Act, the arbitral process is governed by the
1996 Act, and all objections—whether jurisdictional or otherwise—
ought to be addressed within that statutory framework.
(ii)
The respondents contend that the petitioner is impermissibly
invoking the writ jurisdiction to stall or derail the arbitral
proceedings at an interlocutory stage. According to them, the
rejection of an application under Section 16 of the Arbitration and
Conciliation Act is not a final determination of rights and does not
warrant interference under Article 226 of the Constitution.
(iii)
It is further submitted that the MSMED Act is a beneficial
legislation enacted to protect micro and small enterprises from
delayed payments and unequal bargaining power. The provisions
of the Act, particularly Section 18, are required to be interpreted
Page 9
Digitally Signed
Signed by: BHABAGRAHI JHANKAR
Reason: Authentication
Location: ORISSA HIGH COURT,
CUTTACK
Date: 15-Jan-2026 19:31:53
purposively so as to advance the legislative intent rather than
defeat it through technical objections.
(iv)
On the issue of jurisdiction, the respondents dispute the
petitioner’s assertion that the contract in question is wholly outside
the ambit of the MSMED Act. They submit that the dispute arises
out of execution of contractual obligations by Opposite Party No.
3, who is a registered micro or small enterprise, and that claims
relating to non-payment for work executed fall within the scope of
disputes contemplated under the Act. The respondents contend
that the mere fact that a contract involves execution of work at site
or includes elements of labour and material does not automatically
exclude it from the purview of the MSMED Act. According to
them, the Act does not carve out a blanket exclusion for contracts
described as “works contracts,” and each case must be examined
on its own facts.
(v)
It is further argued that the Facilitation Council, having been
vested with statutory authority under Section 18, is competent to
determine its own jurisdiction, including objections raised under
Section 16 of the Arbitration and Conciliation Act. The respondents
submit that the Council has considered the petitioner’s application
and has taken a view that the proceedings are maintainable, which
ought not to be interfered with at this stage.
(vi)
The respondents also submit that the petitioner participated in the
proceedings before the Facilitation Council and raised its
objections belatedly. According to them, the petitioner cannot
Page 10
Digitally Signed
Signed by: BHABAGRAHI JHANKAR
Reason: Authentication
Location: ORISSA HIGH COURT,
CUTTACK
Date: 15-Jan-2026 19:31:53
simultaneously participate in the proceedings and, upon facing an
adverse order, seek to invoke the writ jurisdiction to avoid
adjudication on merits.
(vii) With respect to the timing of MSME registration, the respondents
contend that the relevant consideration is not merely the date of
execution of the original contract but whether supplies were made
or
services
were
rendered
after
the
enterprise
obtained
registration. They submit that Opposite Party No. 3 continued to
execute work and raise claims during the period when it was a
registered MSME, thereby attracting the protection of the Act.
(viii) The respondents further submit that the existence of a contractual
arbitration clause does not oust the jurisdiction of the Facilitation
Council once the conditions under Section 18 of the MSMED Act
are satisfied. It is contended that the MSMED Act contains an
overriding mechanism for dispute resolution, and parties cannot
contract out of a statutory remedy provided under a special
enactment.
(ix)
The respondents also emphasise that the order dated 30.08.2025,
rejecting the petitioner’s application under Section 16, does not
finally conclude the arbitral proceedings. They submit that the
petitioner will have full opportunity to raise all permissible
grounds at the stage of challenge to the final award, and therefore
no irreparable prejudice is caused by continuation of the
proceedings.
Page 11
Digitally Signed
Signed by: BHABAGRAHI JHANKAR
Reason: Authentication
Location: ORISSA HIGH COURT,
CUTTACK
Date: 15-Jan-2026 19:31:53
IV.
ISSUE FOR CONSIDERATION
5. Having heard the parties and perused the materials available on record,
this court here has identified the following issues to be determined:
A. Whether the present contract is a works contract and if so, could the
MSEFC have entertained a claim arising out of a works contract?
B. Whether a writ petition under Article 226 of the Constitution of India
is maintainable against an order passed by the Micro and Small
Enterprises Facilitation Council under Section 18 of the MSMED Act,
2006, when such order is alleged to have been made without inherent
jurisdiction?
V.
ISSUE A: WHETHER THE PRESENT CONTRACT IS A WORKS
CONTRACT AND IF SO, COULD THE MSEFC HAVE
ENTERTAINED A CLAIM ARISING OUT OF A WORKS
CONTRACT?
6. Arbitration is often projected as a cost-efficient mechanism for resolving
commercial disputes, but in practice, it can be prohibitively expensive
for smaller entities. Arbitrator fees, advocate fees, and related
administrative expenses make the process burdensome. Micro, small,
and medium enterprises (MSMEs), which typically function with
constrained budgets, find themselves disadvantaged against large
corporations with vast resources. To mitigate this inequity, the Micro,
Small and Medium Enterprises Development Act, 2006 (“MSMED Act”)
introduced statutory arbitration under Section 18. This provision
empowers MSMEs to approach state Facilitation Councils, which in turn
initiate arbitration or conciliation proceedings. A distinctive feature of
this framework is the lower fee structure, prescribed by state councils,
Page 12
Digitally Signed
Signed by: BHABAGRAHI JHANKAR
Reason: Authentication
Location: ORISSA HIGH COURT,
CUTTACK
Date: 15-Jan-2026 19:31:53
ensuring affordability for MSMEs. However, an important question
arises: can all disputes involving MSMEs be submitted to this special
arbitration regime, particularly disputes arising from “works contracts”?
The answer, as previous judicial pronouncements reveal, is far from
straightforward.
7. A central point of debate is the precise legal nature of “works contracts.”
The term is frequently misinterpreted as being synonymous with
construction contracts. However, statutory definitions reveal a broader
scope. Under Section 2(119) of the Central Goods and Services Tax Act,
2017, a works contract encompasses agreements for building,
fabrication, installation, repair, improvement, or commissioning of
movable and immovable property. The definition extends well beyond
traditional construction arrangements. Courts have elaborated on this
scope in several decisions. In K. Raheja Development Corporation v.
State of Karnataka1, the Supreme Court examined the Karnataka Sales
Tax Act, which contained a parallel definition. The Court clarified that
the ambit of works contracts is “very wide” and cannot be restricted to
conventional understanding. This interpretation was later reaffirmed
in Larsen & Toubro Ltd. v. State of Karnataka2, cementing the
composite nature of such contracts.
8. The Supreme Court, in Kone Elevator India Pvt. Ltd. v. State of Tamil
Nadu3, delivered a landmark judgment on the legal character of works
contracts. A Constitution Bench rejected the earlier “dominant nature
(2005) 5 SCC 162
(2014) 1 SCC 708
(2014) 7 SCC 1
Page 13
Digitally Signed
Signed by: BHABAGRAHI JHANKAR
Reason: Authentication
Location: ORISSA HIGH COURT,
CUTTACK
Date: 15-Jan-2026 19:31:53
test,” which had previously been applied to classify contracts based on
their predominant purpose. Instead, the Court held that a works
contract, once it satisfies statutory characteristics, retains its dual nature
irrespective of additional obligations incorporated. Importantly, such
contracts are indivisible in reality but deemed divisible by legal fiction
into components of goods and services. This reasoning underscores that
works contracts are sui generis and cannot be conflated with ordinary
contracts for sale or service. The Court also emphasized examining the
“substance over form” of agreements, highlighting that the true object of
the contract is determinative. Thus, works contracts occupy a unique
position, distinct from ordinary procurement arrangements.
9. In Kone Elevators (supra), the Supreme Court observed that the main
object of the transaction, the prevailing circumstances, and the
customary practices of trade provide critical guidance. It stressed that
works contracts inherently combine both goods and services, and even
where goods predominate, the contract does not lose its character as a
works contract. This dual nature complicates their treatment under
statutes designed with binary classifications of buyers and sellers, such
as the MSMED Act. Unlike pure sale transactions, works contracts defy
simple categorization, creating friction with the structure of statutory
arbitration under the MSMED Act. Consequently, while MSMEs benefit
from preferential treatment in procurement policies, whether these
benefits extend to disputes arising out of works contracts remains
contentious.
Page 14
Digitally Signed
Signed by: BHABAGRAHI JHANKAR
Reason: Authentication
Location: ORISSA HIGH COURT,
CUTTACK
Date: 15-Jan-2026 19:31:53
10.The MSMED Act aims to facilitate growth of small enterprises through
preferential procurement. Several government policies grant MSMEs
priority in public tenders. However, a practical dilemma arises when
such preferences result in award of works contracts. Can an MSME, after
receiving such a contract, invoke the MSMED Act’s dispute resolution
framework? The Delhi High Court addressed this in Shree Gee v. Union
of India4. In that case, Indian Oil Corporation had granted preference to
an MSME bidder, but the Court held that the MSME Procurement
Policy, 2012, did not apply to works contracts. The Court quashed the
award of the contract, clarifying that MSME preferences cannot override
the statutory nature of works contracts. This judgment revealed a
judicial hesitation to extend the MSMED Act’s arbitration benefits to
disputes involving composite contractual arrangements, setting the
stage for further conflicting interpretations.
11.A similar stance was taken by the Allahabad High Court in Rahul Singh
v. Union of India5. The Court categorically ruled that works contracts
fall outside the ambit of the MSMED Act. The case concerned disputes
where MSME suppliers attempted to claim benefits under Section 18 of
the Act by categorizing works contracts as simple supply transactions.
The Court rejected this approach, holding that the MSMED Act is
designed to govern buyer-seller relationships of goods and services, not
composite works contracts involving both. The Allahabad High Court’s
decision reinforced the principle that statutory arbitration under the
2015 SCC OnLine Del 12822
2017 SCC OnLine All 1714
Page 15
Digitally Signed
Signed by: BHABAGRAHI JHANKAR
Reason: Authentication
Location: ORISSA HIGH COURT,
CUTTACK
Date: 15-Jan-2026 19:31:53
MSMED Act is restricted and cannot extend to every form of commercial
arrangement involving MSMEs. This judgment aligned with the earlier
Delhi High Court ruling, thereby strengthening the judicial view that
works contracts are misfits under the MSMED Act’s dispute resolution
scheme.
12.The most influential judgment on this question emerged from the
Bombay High Court in P.L. Adke v. Wardha Municipal Corporation6.
The dispute concerned an MSME contractor who alleged non-payment
for work performed under a works contract and sought to invoke
arbitration through the MSME Facilitation Council. The High Court,
however, dismissed the appeal, relying on Shree Gee (supra) and Rahul
Singh (supra). It held that works contracts, being sui generis, cannot be
equated to simple supply transactions and thus fall outside the purview
of the MSMED Act. The Court relied on Larsen & Toubro (supra)
and Kone Elevators (supra) to affirm the legal nature of such contracts.
13.Following P.L. Adke(supra), several High Courts have consistently
refused to extend the MSMED Act’s arbitration provisions to works
contracts. The lack of a Supreme Court stay has given Adke (supra)
authoritative value across jurisdictions. As a result, MSMEs engaged in
composite contracts increasingly find themselves excluded from
invoking Section 18 arbitration. This trend has narrowed the scope of
disputes that Facilitation Councils may adjudicate, relegating MSMEs in
works contracts to regular arbitration under the Arbitration and
Conciliation Act, 1996. Although the final pronouncement of the Hon’ble
2021 SCC OnLine Bom 5531
Page 16
Digitally Signed
Signed by: BHABAGRAHI JHANKAR
Reason: Authentication
Location: ORISSA HIGH COURT,
CUTTACK
Date: 15-Jan-2026 19:31:53
Supreme Court in the Adke appeal is awaited, judicial consensus
currently treats works contracts as incompatible with the MSMED Act.
This prevailing interpretation underscores the judiciary’s cautious
approach in extending statutory benefits to categories of contracts not
explicitly contemplated under the MSMED Act, even if such exclusion
disadvantages small enterprises.
14.The Bombay High Court revisited this issue in National Textile
Corporation Ltd. v. Elixir Engineering Pvt. Ltd.7. The dispute concerned
contracts for design, fabrication, and commissioning of industrial piping
systems. The MSME contractor approached the Facilitation Council,
which passed an award partly in its favour. On challenge under Section
34 of the Arbitration and Conciliation Act, the Court held that the
Facilitation Council lacked jurisdiction since the underlying contracts
were works contracts. Citing P.L. Adke(supra), the Court reasoned that
arbitration initiated under the MSMED Act in such cases is a “stillborn
exercise.” The award was declared void for want of jurisdiction. The
Court emphasized that jurisdictional defects strike at the root of arbitral
proceedings and cannot be cured, even considering the narrow grounds
available for judicial interference post-2015 amendments. Thus, the
award was set aside as patently illegal.
15.In National Textile Corporation (supra), the Bombay High Court
elaborated that the Facilitation Council’s jurisdiction is statutory and
limited. Works contracts, being distinct in nature, do not fall within this
statutory jurisdiction. The Court distinguished between errors within
2023 SCC OnLine Bom 653
Page 17
Digitally Signed
Signed by: BHABAGRAHI JHANKAR
Reason: Authentication
Location: ORISSA HIGH COURT,
CUTTACK
Date: 15-Jan-2026 19:31:53
jurisdiction and the absence of jurisdiction, noting that the latter renders
proceedings void ab initio. This reasoning drew upon the Supreme
Court’s decision in Ssangyong Engineering & Construction Co. Ltd. v.
NHAI8. The Court held that lack of jurisdiction constitutes a patent
illegality, warranting judicial intervention. This reinforces the judicial
consensus that statutory arbitration under the MSMED Act is confined
to specific contractual relationships and cannot be extended to works
contracts by interpretative expansion.
16.The Delhi High Court in Tata Power Company Ltd. v. Genesis
Engineering Company9, was faced with competing claims of arbitration.
Tata Power issued a notice invoking arbitration under Section 21 of the
Arbitration and Conciliation Act, 1996, while the MSME contractor
approached the Facilitation Council under the MSMED Act. The Court
examined the underlying work orders, which involved composite
works, and applied the precedents set in P.L. Adke (supra) and National
Textile Corporation (supra). It concluded that disputes arising out of
works contracts cannot be adjudicated by MSME Facilitation Councils.
Consequently, the Court upheld the maintainability of a Section 11
petition and appointed a sole arbitrator under the Arbitration Act. This
judgment affirmed that works contracts fall squarely outside the
MSMED Act’s purview, directing MSMEs to pursue conventional
arbitration rather than statutory remedies.
(2019) 15 SCC 131
2023 SCC OnLine Del 2366
Page 18
Digitally Signed
Signed by: BHABAGRAHI JHANKAR
Reason: Authentication
Location: ORISSA HIGH COURT,
CUTTACK
Date: 15-Jan-2026 19:31:53
17.In Tata Power (supra), the Delhi High Court observed that the legal
position on works contracts has been consistently settled by multiple
High Courts. The Court stressed that works contracts, regardless of their
specific subject matter, are indivisible agreements involving both goods
and services. As such, they do not create the seller-buyer relationship
contemplated under the MSMED Act. The Court rejected the MSME’s
argument that participation in Facilitation Council proceedings by the
respondent constituted acquiescence. Jurisdictional limits, the Court
emphasized, cannot be conferred by consent or waiver. Ultimately, the
Court allowed the Section 11 petition and referred the dispute to
arbitration under the general framework. This decision further
entrenched the principle that while MSMEs enjoy statutory support
under the MSMED Act, those benefits do not extend to works contracts,
thereby creating a caveat for small enterprises entering such
arrangements.
18.The Micro, Small and Medium Enterprises Development Act, 2006 was
introduced with the object of protecting smaller enterprises from
delayed payments and to provide a quick forum for resolution through
Facilitation
Councils.
These
councils
function
as
quasi-judicial
authorities with powers to conciliate or arbitrate disputes between
MSMEs and their buyers. The legislative intent was to empower MSMEs
by creating a cheaper and faster forum than conventional arbitration.
However, when contracts go beyond mere supply of goods or rendering
of services and instead involve integrated obligations such as design,
construction, installation, and operation, a serious jurisdictional issue
Page 19
Digitally Signed
Signed by: BHABAGRAHI JHANKAR
Reason: Authentication
Location: ORISSA HIGH COURT,
CUTTACK
Date: 15-Jan-2026 19:31:53
arises. Such composite agreements, legally categorized as works
contracts, do not neatly fit into the scheme of the MSMED Act. Courts
have therefore consistently grappled with the question of whether
disputes arising out of works contracts can be submitted to the MSEFCs
for adjudication or arbitration.
19.A works contract, under Section 2(119) of the CGST Act, 2017, has a
specific statutory definition. It covers agreements for building,
fabrication, completion, erection, installation, modification, repair, or
commissioning of immovable property wherein transfer of property in
goods is involved.
20.The jurisprudence emerging from the rulings discussed above
demonstrates a consistent thread: works contracts are not amenable to
the MSMED Act framework. The reasoning rests on statutory
interpretation, commercial realities, and legislative intent. Section 18
presupposes a dispute arising from supply of goods or rendering of
services,
not
from
indivisible
composite
agreements
involving
engineering, construction, and operation. Facilitation Councils were
designed as quick forums for delayed payments, not for supervising
intricate, continuous obligations. Therefore, judicial pronouncements
stress that applying the MSMED Act to works contracts would stretch
the statute beyond its legitimate scope. This principle ensures a balance:
MSMEs are protected in straightforward supply transactions but must
seek remedies under arbitration clauses or ordinary civil processes when
engaging in works contracts. Courts have deliberately drawn this
boundary to preserve legislative coherence.
Page 20
Digitally Signed
Signed by: BHABAGRAHI JHANKAR
Reason: Authentication
Location: ORISSA HIGH COURT,
CUTTACK
Date: 15-Jan-2026 19:31:53
21.The overall judicial approach reflects a careful balance between
protecting MSMEs and respecting the complex nature of works
contracts. By excluding such contracts from the MSMED Act, courts
prevent misuse of an expedited mechanism meant for simple supply
disputes. At the same time, by recognizing the primacy of arbitration
clauses, courts ensure that parties to works contracts are not left
remediless. The common reasoning is that works contracts involve
technical
supervision,
continuous
obligations,
and
indivisible
performance, which cannot be adjudicated summarily by MSEFCs. This
reasoning was first strongly articulated in Kone Elevator (supra) and has
been consistently applied by High Courts. The result is a stable
jurisprudential framework that separates simple MSME supply disputes
from complex contracts, thereby safeguarding both legislative intent and
commercial certainty. Accordingly, this Court also agrees with this view
that works contracts are outside the purview of MSEFC.
22.The scope of work mentioned in the Special Conditions of Contract
entered into by the present Parties is reproduced hereinbelow:
“SP. 03 Scope of Work
- Loading, unloading, transportation from owner’s/clients’
stockyard, shifting the materials(Raw steel, Bought out
items, Hand Rail items, SS sheets/plates etc.) at site,
stacking of materials, fabrication, erection, alignment,
welding,
non-destructive
testing
(NDT)
e.g.
radiography, UT, DP etc., making scaffolding, painting
of the items as mentioned in the SOR, fixing of MS
gratings, SS Liner, Hand Rail etc.
- Making of workshop/shed, jigs and fixtures/ assembly
beds, etc., if necessary.
Page 21
Digitally Signed
Signed by: BHABAGRAHI JHANKAR
Reason: Authentication
Location: ORISSA HIGH COURT,
CUTTACK
Date: 15-Jan-2026 19:31:53
- Minor modification or rectification of the structure
components if necessary for completion of the job in all
respect.
- Installation of fasteners.
- Loading, unloading, transportation, fabrication, erection,
alignment, welding of MS chequered plates.
- Chipping and levelling of foundation.
- The entire works entrusted to the contractor shall be
executed by him strictly in accordance with drawings
and specifications, procedures etc. of the Owner as
stipulated in the relevant contract between the Company
and the Owner, also as per the relevant I.S.
Specifications, Standard engineering Code and Practice
etc. as applicable to this case. However, in the event of
any contradiction between the specifications approved by
the Owner and I.S. Specifications, the former shall
prevail and govern.
- The jig, fixture, assembly bed etc. if required for
completion of the job to be made by the contractor free
cost. Necessary raw material for the same to be provided
by B&R. However, contractor has to arrange raw steel,
G.C.I. sheet etc. for workshop/shed (if required).”
23.Applying the tests as indicated in the judgments of the Supreme Court,
this Court finds in the present case that the contracts in question were
indeed works contracts. The details of the scope of works quoted
hereinabove demonstrates beyond a shadow of doubt that the scope of
the contract involved both goods and services and therefore, the
contracts in question is a works contract. It is thus held that the
provisions of the MSMED Act could not have been invoked by the
Opposite Party. This resultantly shows that the initiation of the statutory
arbitration under the provisions of the MSMED Act on the part of
Opposite Party in the context of contracts in question before the
Page 22
Digitally Signed
Signed by: BHABAGRAHI JHANKAR
Reason: Authentication
Location: ORISSA HIGH COURT,
CUTTACK
Date: 15-Jan-2026 19:31:53
Facilitation Council, was a stillborn exercise and that the Facilitation
Council ought not to have exercised its jurisdiction to conduct the
arbitration proceedings. This renders the impugned awards without
jurisdiction.
VI.
ISSUE B: WHETHER A WRIT PETITION UNDER ARTICLE 226 OF
THE CONSTITUTION OF INDIA IS MAINTAINABLE AGAINST
AN ORDER PASSED BY THE MICRO AND SMALL ENTERPRISES
FACILITATION COUNCIL UNDER SECTION 18 OF THE MSMED
ACT, 2006, WHEN SUCH ORDER IS ALLEGED TO HAVE BEEN
MADE WITHOUT INHERENT JURISDICTION?
24.In Balvant N. Viswamitra. v. Yadav Sadashiv Mule (dead) through Irs.10
the Apex Court held as follows:
“14. Suffice it to say that recently a Bench of two Judges
of this Court has considered the distinction between null
and void decree and illegal decree in Rafique
Bibi v. Sayed Waliuddin [(2004) 1 SCC 287]. One of us
(R.C. Lahoti, J., as His Lordship then was), quoting with
approval the law laid down in Vasudev Dhanjibhai
Modi[(1970) 1 SCC 670 : (1971) 1 SCR 66] stated :
(SCC pp. 291-92, paras 6-8)
“6. What is ‘void’ has to be clearly understood. A decree
can be said to be without jurisdiction, and hence a
nullity, if the court passing the decree has usurped a
jurisdiction which it did not have; a mere wrong exercise
of jurisdiction does not result in a nullity. The lack of
jurisdiction in the court passing the decree must be
patent on its face in order to enable the executing court to
take cognisance of such a nullity based on want of
jurisdiction, else the normal rule that an executing court
cannot go behind the decree must prevail.
(2004) 8 SCC 706
Page 23
Digitally Signed
Signed by: BHABAGRAHI JHANKAR
Reason: Authentication
Location: ORISSA HIGH COURT,
CUTTACK
Date: 15-Jan-2026 19:31:53
7. Two things must be clearly borne in mind. Firstly, ‘the
court will invalidate an order only if the right remedy is
sought by the right person in the right proceedings and
circumstances. The order may be “a nullity” and “void”
but these terms have no absolute sense : their meaning is
relative, depending upon the court's willingness to grant
relief in any particular situation. If this principle of
illegal relativity is borne in mind, the law can be made to
operate justly and reasonably in cases where the doctrine
of ultra vires, rigidly applied, would produce
unacceptable results.’ (Administrative Law, Wade and
Forsyth, 8th Edn., 2000, p. 308.) Secondly, there is a
distinction between mere administrative orders and the
decrees of courts, especially a superior court. ‘The order
of a superior court such as the High Court, must always
be obeyed no matter what flaws it may be thought to
contain. Thus a party who disobeys a High Court
injunction is punishable for contempt of court even
though it was granted in proceedings deemed to have
been irrevocably abandoned owing to the expiry of a timelimit.’ (ibid., p. 312)
8. A distinction exists between a decree passed by a court
having no jurisdiction and consequently being a nullity
and not executable and a decree of the court which is
merely illegal or not passed in accordance with the
procedure laid down by law. A decree suffering from
illegality or irregularity of procedure, cannot be termed
inexecutable by the executing court; the remedy of a
person aggrieved by such a decree is to have it set aside in
a duly constituted legal proceedings or by a superior
court failing which he must obey the command of the
decree. A decree passed by a court of competent
jurisdiction cannot be denuded of its efficacy by any
collateral attack or in incidental proceedings.”
(emphasis is ours)
25.Accordingly there is a difference between inherent lack of jurisdiction
and the procedural impropriety. In the present case evidently by virtue
Page 24
Digitally Signed
Signed by: BHABAGRAHI JHANKAR
Reason: Authentication
Location: ORISSA HIGH COURT,
CUTTACK
Date: 15-Jan-2026 19:31:53
of section 15, 16, 17 and 18 read with Section 2(b)(1), Explanation (i) and
(ii), Facilitation Council clearly did not have jurisdiction in the subject
matter in dispute and therefore the present case is a case of inherent lack
of jurisdiction.
26.This Court has already held time and again that access to High Courts
by way of a writ petition under Article 226 of the Constitution of India,
is not just a constitutional right but also a part of the basic structure. It is
available to every citizen whenever there is a violation of their
constitutional rights or even statutory rights. This is an inalienable right
and the rule of availability of alternative remedy is not an omnibus rule
of exclusion of the writ jurisdiction, but a principle applied by the High
Courts as a form of judicial restraint and refrain in exercising the
jurisdiction. The power to issue prerogative writs under Article 226 of
the Constitution is plenary in nature and the same is not limited by any
provision of the Constitution and cannot be restricted or circumscribed
by a statute. Reference may be made in this regard to Whirlpool
Corpn. v. Registrar, Trade Marks11; L. Chandra Kumar v. Union of
India12; S.N.
Mukherjee v. Union
of
India13
and Union
of
India v. Parashotam Dass14.
27.It has been well-settled through a legion of judicial pronouncements of
this Court that the writ courts, despite the availability of alternative
remedies, may exercise writ jurisdiction at least in three contingencies —
(1998) 8 SCC 1
(1997) 3 SCC 261
(1990) 4 SCC 594
(2025) 5 SCC 786
Page 25
Digitally Signed
Signed by: BHABAGRAHI JHANKAR
Reason: Authentication
Location: ORISSA HIGH COURT,
CUTTACK
Date: 15-Jan-2026 19:31:53
(i) where there is a violation of principles of natural justice or
fundamental rights; (ii) where an order in a proceeding is wholly
without jurisdiction; or (iii) where the vires of an Act is challenged.
28.In the present case, the order is passed by the Facilitation Council
lacking inherent jurisdiction. Since this Court has specifically found that
the provisions of the MSMED Act could not have been invoked in the
facts and circumstances of the case, the impugned order is rendered
without jurisdiction and hence, liable to be set aside on that ground
alone. In such light of the matter, this Court finds it an appropriate
matter to exercise its writ jurisdiction.
VII.
CONCLUSION:
29.In light of the discussion above, the Writ Petition stands allowed. Order
dated 30.8.2025, passed by the Director of Industries, Cuttack in MSEFC
Case No.68 of 2021 is set aside. The proceedings initiated in MSEFC Case
No. 68 of 2021are subsequently quashed.
30.However, the Parties remain at liberty to pursue any remedy available
to them in law.
31.No order as to costs.
(Dr. Sanjeeb K Panigrahi)
Judge
Orissa High Court, Cuttack,
Dated the 9th Jan., 2026
Page 26
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review