IN THE HIGH COURT OF MANIPUR
AT IMPHAL
Review Petition No. 2 of 2020
M/S AASRAY CONCEPT FOODS, represented by its Karta/
representative Shri Ashish Deorah, aged about 41 years, S/O (L)
Ashok Kumar Deorah, resident of C-802 Spanish Garden, RG
Baruah Road, Guwahati – 781005, Assam.
… Petitioner
-Versus1. The State of Manipur, represented by the Principal Secretary,
Social Welfare, Govt. of Manipur, Secretariat Building,
Babupara, P.O. & P.S. Imphal, District Imphal-West, Manipur–
795001.
2. The Director of Social Welfare, Govt. of Manipur, Office of the
Department of Social Welfare, Secured Office Complex, near
2nd Bn. Manipur Rifles, P.O. & P.S. Imphal.
3. The Director, Rausheena Udyog Limited, Guwahati, C/O The
Director of Social Welfare, Govt. of Manipur, Office of the
Department of Social Welfare, Secured Office Complex, near
2nd Bn. Manipur Rifles, P.O. & P.S. Imphal.
4. The Director, M/S Continental Milkose (India) Ltd., New Delhi.
C/O The Director of Social Welfare, Govt. of Manipur, Office
of the Department of Social Welfare, Secured Office Complex,
near 2nd Bn. Manipur Rifles, P.O. & P.S. Imphal.
… Respondents
HON’BLE MR. JUSTICE KH. NOBIN SINGH
For the review petitioner
For the respondents
Date of Hearing
Date of Judgment & Order
∷
Shri Anjan Sahu, Advocate
∷
23-11-2020
∷
Shri S. Nepolean, GA;
Shri H.S. Paonam, Sr. Advocate
∷
01-12-2020
JUDGMENT AND ORDER
[1]
Heard Shri Anjan Sahu, learned Advocate appearing for the
review petitioner; Shri S. Nepolean, learned GA appearing for the State
Review Pet. No. 2 of 2020
Contd…/-
[2]
respondent and Shri H.S. Paonam, learned Sr. Counsel appearing for the
private respondents.
[2]
The instant review petition is directed against the judgment and
order dated 23-7-2020 passed by this Court in writ petition being WP(C)
Nos.252 & 272 of 2020 dismissing them.
[3.1]
The facts and circumstances which have led to the filing of the
present review petition are, in short, that the Director, Social Welfare,
Government of Manipur issued a Tender Notice dated 29-05-2019 inviting
bids from the competent and eligible manufacturers for supply of
Micronutrient Blended Energy Dense Food, followed by a Request for
Proposal containing the terms and conditions thereof which were
questioned by the petitioner by way of a writ petition being WP(C)
No.499/2019 wherein this Court vide order dated 19-06-2019 directed
that the respondents should not open the Technical bids till 26-06-2019.
[3.2]
An amendments was made in the RFP by issuing two
corrigenda dated 21-06-2019 and accordingly, the said writ petition came
to be withdrawn with a liberty to file a fresh petition. The State
respondents further modified paragraph 4(i) of the RFP. The petitioner
submitted a representation dated 01-07-2019 to the Director of Social
Welfare, Government of Manipur regarding the clarification of the last 3
financial years, followed by a representation dated 06-02-2020 requesting
it to furnish the status of the tender process.
[3.3]
It was learnt by the petitioner in the 3rd week of May, 2020 that
Review Pet. No. 2 of 2020
Contd…/-
[3]
the contracts had been awarded to the respondent Nos.3 & 4 vide orders/
letters dated 09-04-2020. Being aggrieved by the said
orders/ letters
dated 09-04-2020, the writ petition being WP(C) No.252 of 2020 was filed
by the petitioner contending inter-alia that the contracts were awarded to
them in a completely arbitrary manner, without finalizing the tender, with
an intention to favour them. The averments made in the writ petition were
denied by the State respondents and their stand was that the tender
process was carried out in accordance with the prevailing norms. The
amendments in paragraph 4 of the RFP were made after a representation
submitted by the petitioner, followed by the corrigendum dated 29-062019. After the petitioner’s request being accepted by the State
respondents, another corrigendum dated 03-07-2019 was issued by the
Director (Social Welfare), Government of Manipur. Thereafter, the
Technical bids were opened on 03-09-2019 in the presence of the
representatives of all the bidders including that of the petitioner. In view of
a representation dated 30-11-2019 being submitted by the petitioner, a
meeting was convened on 04-12-2019 to consider it. As the petitioner’s
claim could not be verified, the technical bid’s evaluation was reverted
and while reverting the bids and re-downloading the documents
submitted online by the petitioner on 21-12-2019, its representatives were
present and therefore, there was no question of violation of the procedure
set by law. Even after tender process being completed, on account of the
lockdown being imposed in the country with effect from 25-03-2020, the
final result of the tender could not be uploaded in time. A meeting of the
Review Pet. No. 2 of 2020
Contd…/-
[4]
Higher Tender Committee (HTC) was held on 07-04-2020 and its
approval was conveyed to the Director (Social Welfare), Government of
Manipur vide a letter dated 08-04-2020 and accordingly, the supply
orders was issued on 09-04-2020. Since the petitioner was not qualified
in the technical bid as its annual turnover for the financial year 2017-2018
was less than Rs.10 crore, the petitioner had no right to question the final
result of the tender process.
[3.4]
In the meantime, the petitioner filed the writ petition being
WP(C) No.272 of 2020 questioning the proceedings dated 21-12-2019
and the summary reports dated 05-06-2020 and 08-06-2020. The validity
and correctness of the orders/ letters dated 09-04-2020 were also
questioned as had been done in the WP(C) No.252 of 2020. Both the writ
petitions were considered together and were dismissed vide a common
judgment and order dated 27-03-2020 passed by this Court. The relevant
paragraphs read as under:
[13] As regards the first issue, the case of the petitioner is that
no reasons have been assigned by the Tender Evaluation
Committee in its proceedings dated 21-12-2019 for rejecting the
technical bid of the petitioner which has been denied by the
State respondents. It is not in dispute that the technical bids
were re-evaluated on 21-12-2019 after the same being reverted
on the request of the petitioner and that too, with the approval
of the Government, as is evident from the Notification dated 0601-2020 of the Director (Social Welfare), Government of
Manipur. It has been stated in the said notification that the
proceedings of the Tender Opening and Evaluation Committee
had been sent to the Administrative Department for approval by
the Government and that the result thereof would be uploaded,
once the approval was conveyed. On perusal of the
proceedings dated 21-12-2019, it is seen that the reasons for
rejecting the technical bid of the petitioner are nowhere stated
Review Pet. No. 2 of 2020
Contd…/-
[5]
therein. But it is stated in the said proceedings that the check
lists of the documents submitted by the bidders were enclosed
therewith as Annexure-A, B, C, D and E for reference which
formed part of the said proceedings. A copy of the Annexure-B
which pertains to the documents submitted by the petitioner,
has been placed on record and on perusal thereof, it is further
seen that the requirement of turnover of Rs.10 crore was not
met by the petitioner. The remarks as given against the
paragraph 13 of the said check list read as under:
“A) Issued by Joint Director (SW) Assam
1) Completion Certificate dated 30.09.2016 includes supply
order dated 10.12.2016 which is contradictory.
2) Proposed to be included in F.Y. 2015-16, actually should
be in F.Y. 2016-17.
3) Turnover for F.Y. 2015-16 is less than 10 crores.
4) Supply Order dated 10.12.2016 amounting to Rs. 5.89
crore should be accounted in F.Y. 2016-17 (wrongly
included in F.Y. 2015-16)
B) Completion Certificate dated 05.12.2018 issued by
Director/WCB, Arunachal Pradesh
1) Two supply orders dated 27.03.2016, one included in FY,
2015-16 & another included in FY, 2016-17
2) Two supply orders dated 31.03.2016 are included in FY
2015-16 & another in FY, 2016-17
3) As per the Certificate for supply dated 05.12.2018 signed
by Director, Deptt. of Women & Child Development,
Govt. of Arunachal Pradesh, two supply orders claiming
to be for the FY 2017-18 are dated 07.04.2018. The total
amount involved under the two supply orders is Rs.
3,17,18,075/- inclusion of these supply orders and
accounting it under 2017-18 is incorrect considering that
the supply orders relates to 2018-19. Further, it is
inappropriate to include turnover for supplies made in a
given year i.e., 2018-19 in the turnover of the preceding
year, 2017-18. Therefore, the turnover for 2017-18 as
indicated in the certificate for supplies dated 05.12.2018
is incorrect and cannot be included in the turnover for
2017-18. Considering this, the requirement of turnover of
Rs. 10 crore for 2017-18 is not met by the firm.”
Since the check list did form part of the proceedings, it
cannot be said that the reasons have not been assigned therein
for rejecting the technical bid of the petitioner and therefore, the
Review Pet. No. 2 of 2020
Contd…/-
[6]
contention of the learned counsel appearing for the petitioner
has no merit and substance and cannot be countenanced by
this Court. Moreover, pursuant to the letter dated 20-01-2020 of
the State Government, the Tender Evaluation Committee held
its meeting on 29-01-2020 to consider the representations of
the petitioner in the light of the information/ documents
uploaded by the petitioner. After having examined them by the
Committee, many discrepancies were detected in the
information/ documents uploaded by the petitioner. The
Committee came to the conclusion that the claim of the
petitioner for fulfilling the minimum turnover of Rs.10 crore in
each of the last three financial years, was not supported by the
relevant documents and hence, the petitioner’s claim was not
acceptable to it. The representations of the petitioner as
referred to in the Government letter dated 20-01-2020 and
considered by the Tender Evaluation Committee in its meeting
held on 29-01-2020 are nothing but the representations dated
15-01-2020 and 16-01-2020 as is evident from the proceedings
dated 07-04-2020 of the Higher Tender Committee. The
representation dated 15-01-2020 is the one addressed to the
Chief Secretary, Manipur praying for re-consideration of the
petitioner’s technical bid.
[14.1] So far as the second issue is concerned, it has been
submitted by the counsel appearing for the petitioner that being
aggrieved by the proceedings dated 29-11-2019 of the Tender
Evaluation Committee, a writ petition being WP(C) No.990 of
2019 was filed by the petitioner. During the pendency of the writ
petition, a Notification dated 06-01-2020 was issued by the
Director (Social Welfare), Government of Manipur informing that
the technical bids were re-opened on 21-12-2010 and were reevaluated by the Committee. Having knowledge about this
letter, the said writ petition was withdrawn by the petitioner.
Even after the expiry of about a month from 06-01-2020, the
petitioner did not receive any information about the outcome of
the said re-evaluation but the petitioner came to know from the
reliable sources that its bid had been rejected by the
Committee. In order to know the status of its technical bid, the
petitioner submitted a representation dated 06-02-2020 to the
Director (Social Welfare), Government of Manipur. No
information about the contents of the proceedings was given to
the petitioner nor was it uploaded in the website. On the
contrary, the petitioner came to know in the third week of May,
Review Pet. No. 2 of 2020
Contd…/-
[7]
2020 that the contracts had already been awarded to the
private respondents vide orders/ letters dated 09-04-2020 which
are under challenge in the first writ petition by the petitioner
contending that they were issued without following due process
of law and with a malafide intention to favour the private
respondents. In order to substantiate his argument, he has
relied upon the guidelines issued by the Government of India as
well as that of the Central Vigilance Commission. The
Government of India issued a manual known as Manual for
Procurement of Goods, 2017 wherein clause i) provides for
principles of transparency relating to procurement of goods.
Clause 4.13.4 (v) provides for declaration of successful bidders
with the requirement of informing the failed bidders. If any
bidder is aggrieved by the procurement process, the bidder
shall be permitted to submit a representation in writing and on
receipt thereof, a decision shall be taken either to withhold the
opening of financial bids or give a reply expeditiously. Clause
3.0 of the Appendix 3 provides for a process to be handled
either fully online/ emails/ SMS etc. or partly online and partly
offline. Rule 144 (viii) provides that at every stage of
procurement, the procuring authority must place on record, in
precise terms, the consideration which weighed with it while
taking the procurement decision. Rule 164 (iv) provides that
suitable provision should be kept in the bidding documents to
enable a bidder to question the bidding conditions, bidding
process and /or the rejection of its bid. The reasons for rejecting
a tender or non-issuing a tender document to a prospective
bidder must be disclosed where enquiries are made by the
bidder. The Central Vigilance Commission, Government of India
also issued certain guidelines in respect of the common
irregularities/ lapses observed in award of contracts for
improvement thereof. Clause 12 emphasizes the need of
opening tenders in the presence of the bidder’s representatives.
In one of the orders dated 10-12-2004, it has been stated by the
CVC that the intimation of rejection to the firms whose bides
have been evaluated but found not to meet the qualification
criteria, along with the return of the unopened price bid, will
enhance transparency and plug the loop-holes in the tendering
system.
[14.2] The stand of the State respondents was that the
information as sought for by the petitioner vide its
representation dated 06-02-2020 regarding the status of the
Review Pet. No. 2 of 2020
Contd…/-
[8]
petitioner’s bid, could not be furnished to the petitioner due to
pending approval of the Higher Tender Committee on the
proceedings of the Tender Evaluation Committee. In reply to
the contention of the petitioner that even after the orders/ letters
dated 09-04-2020 being issued in favour of the private
respondents, the petitioner was not informed nor was the
information uploaded in the website and it was uploaded only
after the filing of the first writ petition, it has been stated by the
State respondents that after the imposition of the lockdown,
there was a complete standstill in almost all the offices except
those classified as essential services. Only 4-5 officers of the
Directorate of Social Welfare used to attend office to look after
urgent matters and on top of that, the Department was busy in
trying to arrange safe place for homeless drug users, lactating
mothers etc and in planning for opening a dedicated quarantine
centre for transgender who need to be quarantined on their
return from other States to Manipur. When the State
Government conveyed the decision of the Higher Tender
Committee, the Department considered it necessary to place
the supply order immediately in public interest. Therefore, the
Department could not upload the outcome of the tender on the
e-tender portal in time due to lack of supporting staff, excessive
workload, restriction on free movement due to lockdown etc.
When the Department realized that the final result was yet to be
uploaded, the digital signature of the Joint Director (Social
Welfare) and Joint Director (ICDS) were found to be invalid and
after their signature being re-validated, the e-tender portal was
updated on 05-06-2020.
[15] In a democratic country like ours, the sharing of information
is paramount as seen from the statement of objects and
reasons, the preamble and relevant provisions of the Right to
Information Act, 2005. In this regard, it will be useful to refer to
some of the decisions rendered by the Hon’ble Supreme Court.
In State of Uttar Pradesh Vs. Raj Narain, (1975) 4 SCC 428
the Hon’ble Supreme Court observed –
“74. In a Government of responsibility like ours, where all the
agents of the public must be responsible for their conduct,
there can but few secrets. The people of this country have a
right to know every public act, everything, that is done in a
public way, by their public functionaries. They are entitled to
know the particulars of every public transaction in all its
Review Pet. No. 2 of 2020
Contd…/-
[9]
bearing. The right to know, which is derived from the
concept of freedom of speech, though not absolute, is a
factor which should make one wary, when secrecy is
claimed for transactions which can, at any rate, have no
repercussion on public security…
In Dinesh Trivedi vs. Union of India, (1997) 4 SCC 306,
the Hon’ble Supreme Court held –
“16. In modern constitutional democracies, it is axiomatic that
citizens have a right to know about the affairs of the
Government which, having been elected by them, seeks to
formulate sound policies of governance aimed at their
welfare. However, like all other rights, even this right has
recognized limitations; it is, by no means, absolute…
17. Implicit in this assertion is the proposition that in transaction
which have serious repercussions on public security,
secrecy can legitimately be claimed because it would then
be in the public interest that such matters are not publicly
disclosed or disseminated.
19. What then is the test? To ensure the continued participation
of the people in the democratic process, they must be kept
informed of the vital decisions taken by the Government and
the basis thereof. Democracy, therefore, expects openness
and openness is a concomitant of a free society. Sunlight is
the best disinfectant. But is equally important to be alive to
the dangers that lie ahead. It is important to realized that
undue popular pressure brought to bear on decision-makers
is Government can have frightening side-effects. If every
action taken by the political or executive functionary is
transformed into a public controversy and made subject to
an enquiry to soothe popular sentiments, it will undoubtedly
have a chilling effect on the independence of the decisionmaker who may find it safer not to take any decision. It will
paralyze the entire system and bring it to a grinding halt. So
we have two conflicting situations almost enigmatic and we
think the answer is to maintain a fine balance which would
serve public interest.
In People’s Union for Civil Liberties Vs. Union of India,
(2004) 2 SCC 476, the Hon’ble Supreme Court held that right of
information is a facet of the freedom of “Speech and
expression” as contained in Article 19(1)(a) of the Constitution
Review Pet. No. 2 of 2020
Contd…/-
[10]
of India and such a right is subject to any reasonable restriction
in the interest of the security of the state and subject to
exemptions and exceptions.
The above decisions have been referred to and relied by the
Hon’ble Supreme Court in Central Board of Secondary
Education & ors. Vs. Aditya Bandopadhyay & ors, (2011) 8
SCC 497.
[16] In spite of the fact that the Notification dated 06-01-2020
states that the proceedings of the Tender Evaluation Committee
dated 21-12-2019 were sent to the Administrative Department
for approval of the State Government and that the result would
be uploaded once the approval of the State Government was
conveyed, the result thereof was not uploaded by the State
respondents. Had the information about the rejection of the
petitioner’s technical bid been uploaded in the website, the
whole controversy could have been avoided then and there.
Two representations dated 15-01-2020 and 16-01-2020 were
submitted by the petitioner, the first being the one addressed to
the Chief Secretary, Manipur praying for re-consideration of its
technical bid. The said representations were considered by the
Tender Evaluation Committee in its meeting held on 29-012020 and in the said proceedings of the Committee, it is stated
that the claim of the petitioner for fulfilling the minimum turnover
of Rs.10 crore in each of the three financial years, was not
supported by the relevant documents and hence, the claim was
not accepted by the Committee. It is further stated that the price
bids of the qualified firms namely the private respondents were
opened on 29-11-2019 at the Directorate of Social Welfare. The
said proceedings dated 29-01-2020 also appear to have not
been intimated to the petitioner which probably prompted the
petitioner to submit the representation dated 06-02-2020
enquiring about the status of the tender process. No reply
thereto appears to have been given by the State respondents.
On 07-04-2020 in its meeting, the Higher Tender Committee
approved the proceedings of the Tender Evaluation Committee
and recommended the procurement of Micronutrient Fortified
Energy Dense Food by the private respondents subject to the
conditions mentioned therein. From the aforesaid facts and
circumstances, it is absolutely and admittedly clear that the
rejection of the petitioner’s technical bid was not communicated
to the petitioner nor was it uploaded in the website and on top
Review Pet. No. 2 of 2020
Contd…/-
[11]
of that, the final result of the tender process was not uploaded
in the official website before filing of the first writ petition. Then,
the short question that calls for consideration by this Court is as
to what will be consequence thereof in the given facts and
circumstances of the present cases. Relying upon the decisions
rendered by this Court in the cases referred to hereinabove, it
has been submitted by the counsel appearing for the petitioner
that since the action of the State respondents was arbitrary and
malafide, the tender process ought to be quashed and set
aside, to which the counsel appearing for the respondent No.3,
in order to counter it, has relied upon the decision rendered in
Shrilekha Vidhyarthi (supra) to contend that there was no
malafide or arbitrariness in the State action. The facts and
circumstances of the cases which have been decided by the
Hon’ble Supreme Court are not exactly the same as that of the
present cases. But it may be noted that there can be no dispute
as regards the law laid down by the Hon’ble Supreme Court in
the aforesaid decisions relied upon by the counsels appearing
for the parties. Therefore, the details of the said decisions are
not referred to herein, as the issues involved herein will have to
be decided by this Court on the facts and circumstances of the
present case, as is evident from the decision rendered by the
Hon’ble Supreme Court in Shrilekha Vidhyarthi (supra) wherein
the Hon’ble Supreme Court held:
“36. The meaning and true import of arbitrariness is more
easily visualized than precisely stated or defined. The
question, whether an impugned act is arbitrary or not, is
ultimately to be answered on the facts and in the
circumstances of a given case. An obvious test to apply is to
see whether there is any discernible principle emerging from
the impugned act and if so, does it satisfy the test of
reasonableness. Where a mode is prescribed for doing an
act and there is no impediment in following that procedure,
performance of the act otherwise and in a manner which
does not disclose any discernible principle which is
reasonable may itself attract the vide of arbitrariness. Every
State action must be informed by reason and it follows that
an act uninformed by reason, is arbitrary. Rule of law
contemplated governance by laws and not by humour,
whims or caprices of the men to whom the governance is
entrusted for the time being. It is trite that ‘be you ever so
high, the laws are above you’. This is what men in power
Review Pet. No. 2 of 2020
Contd…/-
[12]
must remember, always.”
[17] Coming to the facts of the case, it is not in dispute that the
Director (Social Welfare), Government of Manipur, issued a
Tender Notice dated 29-05-2019 inviting bids from the eligible
bidders for supply of Micronutrient Blended Energy Dense
Food, followed by the RFP dated 29-05-2019 containing the
eligibility criteria, of which para 4(i) which is relevant for the
present case, reads as under:
“4(i) The bidder should have turnover of manufacturing and
supplying of Micro Nutrient Fortified Energy Dense Food/
Supplementary Nutrition under ICDS Scheme of Ministry of
Women and Child Development, Govt. of India against
orders placed in their own names, directly by the
Department of Women and Child Development/ Department
of Social Welfare of any State Government/ UT Government
of not less than Rs. 25,00,00,000/- (Rupees twenty five
crores only) in each of the last 3 financial years i.e., 201718, 2015-17 and 2015-16. The bidder should submit Annual
Turnover Statement for the last 3 years of sale, exclusively
from manufacturer and supply of Micro Nutrient Fortified
Energy Dense Food/ Supplementary Nutrition directly to the
Department of Women and Child Development/Department
of Social Welfare duly certified by a Chartered Accountant
and also submit order copies of the same issued by the
Departments. In case of Mahila Mandal/Self Help Group/
Village Community (Who are original manufacturers) the
turnover shall be relaxed to Rs.2,50,00,000/- (Rupees two
crore fifty lakhs only).”
The last date for submission of bids was fixed at 3 pm of 2506-2019, while the time of opening technical bids was fixed at
3.30 pm of the same day. Being aggrieved by the RFP dated
29-05-2019, the petitioner filed a writ petition being WP(C)
No.499/2019 questioning it. During the pendency of the said
writ petition, the Director (Social Welfare), Government of
Manipur issued a corrigendum dated 21.06.2019 making certain
amendments in various clauses of the RFP, because of which
the last date of submission of tender and the opening of
technical bids were fixed on 04.07.2019 and the said writ
petition was withdrawn with a liberty to file a fresh petition, if so
advised. The petitioner submitted a representation dated
01.07.2019 to the Director (Social Welfare), Government of
Review Pet. No. 2 of 2020
Contd…/-
[13]
Manipur seeking a clarification as regards the last three
financial years as contained in the corrigendum dated
29.06.2019. After the request being considered by the State
respondents, the corrigendum dated 03.07.2019 was issued by
the Director (Social Welfare), Government of Manipur which
was followed by the representation dated 16.07.2019
requesting for inclusion of the financial year, 2018-2019 while
considering the annual turnover of the company during the last
three financial years. A corrigendum dated 31-07-2019 was
issued by the Director (Social Welfare), Government of Manipur
making amendment of paragraph 4 of the RFP. Thereafter, the
Director (Social Welfare), Government of Manipur wrote a letter
dated 08-08-2019 to the private respondent No.3 stating that
the last three years would mean the years, 2016-17, 2017-18
and 2018-19 and that if the audit for the year, 2018-19 was not
completed, the annual turnover statements for the years, 201516, 2016-17 & 2017-18 could be submitted by the bidders. A
Notification dated 05-11-2019 was issued by the Director
(Social Welfare), Government of Manipur informing all the
concerned that the technical evaluation would be done on 0711-2019 at the Directorate Head Quarter and accordingly, the
meeting of the Tender Evaluation Committee was held on 0711-2019 for opening technical bids, the proceedings of which
indicated that the Committee, after examining the documents
attached to the technical bids submitted by the bidders, found
the private respondents having qualified in the technical bids
and recommended them for the financial bids. It is also stated in
the proceedings that the check list statements for the
documents submitted by the bidders were enclosed therewith.
A copy of the proceedings along with annexure-B relating to the
petitioner has been placed on record by the respondent No.1 &
2 along with their written argument. The financial bids were
opened on 29-11-2019 and in the proceedings thereof, it is
stated that both the private respondents quoted the same rate
for supply of Micronutrient Fortified Energy Dense Food as
Daliya sweet and therefore, the Committee recommended both
of them for procurement of Micronutrient Fortified Energy
Dense Food as indicated against them. Pursuant to a
representation dated 30.11.2019 of the petitioner, a meeting
was convened on 04.12.2019 to consider it in the presence of
the other bidders. During the course of the meeting, the
representative of the petitioner claimed that some of their bid
Review Pet. No. 2 of 2020
Contd…/-
[14]
documents were not evaluated by the Committee. Their claim
could not be verified without reverting the e-tender process, for
which an approval of the Government was sought for and was
duly granted on 18-12-2019. At the time of reverting the bid
process and re-downloading the documents submitted online by
the petitioner on 21.12.2019, the representatives of the
petitioner were present. After having examined the documents,
the Committee found the same result and accordingly, similar
proceedings as that of the proceedings dated 07-11-2019 were
prepared wherein the check lists of the documents submitted by
the bidders are stated to be enclosed with the observation that
there was no change in the particulars of the technically
qualified firms even after re-evaluation and therefore, the
private respondents were recommended. The proceedings
dated 21-12-2019 were submitted to the Higher Tender
Committee for approval. So far as the petitioner is concerned, it
is stated therein that many discrepancies were detected in the
information furnished by it. The petitioner submitted two
representations dated 15-01-2010 and 16-01-2020 which were
considered by the Committee on 29-01-2020 but the same were
not accepted by the Committee on the ground that the petitioner
did not fulfill the requirement of minimum turnover of Rs.10
crore in each of the last three financial years. Thereafter, a
representation dated 06.02.2020 was submitted by the
petitioner enquiring about the status of the tender process. The
proceedings of the Tender Evaluation Committee was approved
by the Higher Tender Committee in its meeting held on 07-042020 and the private respondents were recommended for
procurement of Micronutrient Fortified Energy Dense Food for
use in AWCs under ACDS subject to the conditions mentioned
therein. Consequently, two orders/ letters dated 09-04-2020,
impugned herein, were issued to the private respondents to
supply the items mentioned therein.
[18] From the aforesaid undisputed facts, it is seen that the
Tender Notice was issued on 29-05-2019 inviting bids from the
eligible bidders, followed by the RFP. The technical bids were
opened on 07-11-2019 and while the private respondents were
found having qualified, the petitioner was found not qualified
therein and accordingly, the private respondents were
recommended for the financial bids which were opened on 2911-2019. The petitioner was aware of the fact that its technical
had been rejected and therefore, it submitted a representation
Review Pet. No. 2 of 2020
Contd…/-
[15]
dated 30.11.2019, on the basis of which a meeting of the
Committee was convened on 04.12.2019 to consider it but the
documents alleged to have been submitted by the petitioner
could not be verified. The tender process was reverted on 1812-2019 with the approval of the State Government and the
technical bids were re-evaluated on 21.12.2019 in the presence
of the representatives of the bidders. After having examined the
documents, the Committee found the same result and
accordingly, proceedings similar to that of the proceedings
dated 07-11-2019 were prepared and submitted to the Higher
Tender Committee for approval. The petitioner submitted a
representation dated 15-01-2010 to the Chief Secretary,
Manipur praying for re-consideration of its technical bid,
followed by a representation dated 16-01-2020 which were
considered by the Committee on 29-01-2020 but the same were
not accepted by the Committee. A representation dated
06.02.2020 was submitted by the petitioner enquiring about the
status of the tender process. The grievances of the petitioner at
that juncture was that the petitioner was not informed about the
rejection of its technical bid or for that matter, the petitioner was
not informed about the outcome of the proceedings dated 2112-2019. As has been observed hereinabove, it is admitted by
the State respondents that the petitioner was not informed
about the proceedings dated 21-12-2019 nor was it uploaded in
the website. But it may be noted that the petitioner was fully
aware of it and therefore, the representation dated 15-01-2020
was submitted to the Chief Secretary for re-consideration of its
technical bid and moreover, in its representation dated 06-022020, it has been specifically stated by the petitioner that it
came to know about the rejection of its technical bid. If that be
so, there was no point of waiting for the information. The
petitioner could have applied for a copy thereof under the
provisions of the Right to Information Act, 2005 and challenged
it before the appropriate forum at that point of time which the
petitioner failed to do that. The reason given by the State
Government was that it could not give the information, as it was
awaiting the approval of the Higher Tender Committee for
approval. The proceedings of the Tender Evaluation Committee
were approved by the Higher Tender Committee in its meeting
held on 07-04-2020 and consequently, the orders/ letters dated
09-04-2020 were issued to the private respondents to supply
the items as mentioned therein. This time too, no information
Review Pet. No. 2 of 2020
Contd…/-
[16]
was given to the petitioner nor was it uploaded in the website
and the State action was contrary to the guidelines of the
Government of India. It has been specifically stated in RFP that
the bids are invited in accordance with the guidelines issued by
the Government of India. The reasons given by the State
respondents appear to be not plausible. The approval of the
Government was conveyed on 08-04-2020 and on the next day,
i.e, 09-04-2020, the letters were written to the private
respondents. It may be noted that these exercises were done
during the lockdown due to COVID-19 crisis and since the
uploading of the final result was not a difficult task, they could
have done it on 09-04-2020 itself on which the letters dated 0904-2020 were written. If the information could not be uploaded
that day in the website, the State respondents could have
written a short letter to the petitioner informing that its technical
bids had already been rejected by the Committee. The fact that
the State respondents did not intimate the rejection of the
technical bid of the petitioner, despite the existence of the
guidelines as contained in the manual, has clearly
demonstrated that the State respondents were not bothered at
all with the said guidelines or the information was not uploaded
at many stages of the tender process deliberately so that the
petitioner could have no occasion to ventilate its grievances
before the appropriate forum. The State respondents appear to
be fed up with the manner in which the petitioner kept on
submitting representation after representation. But if the
rejection of the petitioner’s technical bid was intimated to it in
time or it was uploaded in the official website, non-uploading of
the final result would not have created this sort of controversy.
These circumstances warrant that in future, the State
Government is incumbent to incorporate, in any NIT issued by
any of the Departments of the State Government, the
requirement of uploading the information relating to the tender
process from time to time. In any case, the tender process
stood completed; the work orders had been issued and the
private respondents are alleged to have started supplying the
food items. In the normal course, this Court could have
interfered with the tender process because the State
respondents had failed to follow the guidelines but in the
peculiar facts and circumstances of the present case, this Court
is not inclined to do so for the reason that the petitioner did not
approach this Court at the right time, even after it knew that its
Review Pet. No. 2 of 2020
Contd…/-
[17]
bids had been rejected by the Committee. Instead of doing that,
the petitioner submitted a representation dated 15-01-2020 for
re-consideration of its technical bid which was considered and
rejected by the Committee in its meeting held on 29-01-2020
and thereafter, the proceedings of the Tender Evaluation
Committee were approved by the Higher Tender Committee on
07-04-2020 but both the proceedings dated 29-01-2020 and 0704-2020 are not under challenge in these writ petitions.
Moreover, since the technical bid of the petitioner had already
been rejected by the Committee with reasons as has been
observed by this Court in the preceding paragraph while
considering the first issue and the petitioner was aware of it as
observed hereinabove but it failed to challenge it at the right
time, non-intimation of the result of the tender process cannot
be said to be the ground for quashing and setting aside the
tender process. It is nowhere specifically stated in the RFP that
the proceedings of the Tender Evaluation Committee shall be
either intimated to the bidders or uploaded in the website from
time to time except the general guidelines, as contained in the
manual of the Government of India, wherein there is no specific
provision that in the event of the guidelines not being followed
by the State respondents, the tender process will stand vitiated
and will be liable to be quashed and set aside. Considering the
materials on record and the submissions of the learned
counsels appearing for the parties and having regard to facts
and circumstances of the present case, this Court is of the view
that the writ petitions are devoid of any merit and are
accordingly liable to be dismissed.
[4]
Being aggrieved by the said judgment and order dated 23-7-
2020 passed by this Court in WP(C) Nos.252 & 272 of 2020, the petitioner
preferred a petition for Special Leave to Appeal being SLP(C) Nos.91469147 of 2020 before the Hon’ble Supreme Court which were dismissed by
the Hon’ble Supreme Court on 13-08-2020. After the SLP having been
dismissed by the Hon’ble Supreme Court, the instant review petition has
been filed before this Court on the inter-alia grounds that the petitioner
could not question the reason for rejection of its technical bids as the
Review Pet. No. 2 of 2020
Contd…/-
[18]
same was not communicated to it; that the reason for rejection of its bids
was not tenable in the eyes of law; that the petitioner fulfilled the eligibility
criteria including the Point No.13 which is alleged to have not been fulfilled
by it; that there is a typographical error in the completion certificate issued
by the Joint Secretary (SW), Assam as the actual supply order is dated
10-12-2015 as is evident from the corresponding supply orders annexed
therewith as Annexure A/1; that as the order passed by the Government
of Assam was in the financial year 2015-16, the turnover with regard to
the material supply in the financial year 2015-16 is considered in the
financial year 2015-16 and if any supply is made in the year 2016-17, the
same be considered in the financial year 2016-17; that the petitioner had
already submitted a certificate of the Chartered Accountant stating that the
turnover of the petitioner is more than Rs.10,00,00,000/- crores for the
financial years 2016-17, 2017-18 and 2018-19. The turnover of the
financial year, 2015-16, regardless of whether it is fulfilled by the petitioner
or not, is immaterial for the reason that the last three years would be
2016-17, 2017-18 and 2018-19. The supply order is dated 10-12-2015
and not dated 10-12-2016 as has already been clarified hereinabove. The
relevant paragraphs of the main grounds read as under:
F. Because, the relevant portion of the said document i.e.,
PointNo. 13 is reproduced below:
"Annual turnover of not less than Rs. 10,00,00,000/-(Rupees
ten crores only) in each of the last 3 (three) financial years.
The bidder should submit Annual Turnover Statement for the
last 3 (three) years of sale exclusively from manufacturer and
supply of Micro Nutrient Fortified Energy Dense Food
Review Pet. No. 2 of 2020
Contd…/-
[19]
Supplementary Nutrition direction to the Department of
Women and Child Development/ Department of Social
Welfare duly certified by a Chartered Accountant and also
submit order copies of the same issued by the Departments
in case of Mahila Mandal/ Self Help Group/ Village
Community (Who are original manufacturers) the turnover
shall be relaxed to Rs.2,50,00,000/- (Rupees two crore Fifty
Lakhs only) (As amended in Point No. 4(i) of Corrigendum
dated 31st July, 2019). Further the corresponding entry on
the remarks of point no.13 has been reproduced below-“
A)
1)
2)
3)
4)
B)
1)
2)
3)
Issued by Joint Director (SW) Assam.
Completion certificate dated 30-09-2016 includes
supply order dated 10-12-2016 which is contradictory.
Proposed to be included in FY 2015-16, actually
should be F.Y. 2016-17.
Turnover for F.Y. 2015-16 is less than 10 crores.
Supply Order dated 10-12-2016 amounting to Rs. 5.89
crores should be accounted in F.Y. 2016-17 (Wrongly
included in F.Y. 2015-16).
Completion Certificate dated 05-12-2018 issued by
Director of WCD, Arunachal Pradesh
Two supply orders dated 27-3-2016 one included in
F.Y. 2015-16 & another included in F.Y. 2016-17.
Two supply orders dated 31-03-2016 are included in
F.Y. 2015-16 & another F.Y. 2016-17.
As per the Certificate for supply dated 05-12-2018
signed by Director Deptt. Of Women & Child
Development, Govt. of Arunachal Pradesh two supply
orders claiming to be for the F.Y. 2017-18 are dated
07-04-2018. The total amount involved under the two
supply orders Rs.3,17,18,075/- inclusion of these
supply orders an accounting under 2017-18 as
incorrect considering that the supply orders relates to
2018-19. Further it is inappropriate to turnover for
supplies made in a given year i.e. 2018-19 in the
turnover of the preceding year 2017-18. Therefore the
turnover for 2017-18 as indicated in the certificate for
supplies dated 05-12-2018 is incorrect and cannot be
indicated in the turnover for 2017-18. Considering this,
the requirement of turnover of Rs. 10 crore for 201718 is not met by the firm.
Review Pet. No. 2 of 2020
Contd…/-
[20]
G. Because, with regard to remark- A(1) corresponding to point
no.13 which sets out the following- “Completion certificate
dated 30-09-2016 includes supply order dated 10-12-2016
which is contradictory”, it is humbly submitted before this
Hon’ble Court that there is a typographical error in the
completion certificate issued by the Joint Director (SW)
Assam as the actual supply order is dated 10-12-2015. The
correct date of the completion of the supply order is printed
on the corresponding supply order already annexed in
Annexure-A/1 and the corresponding order number is
DSW(ICDS)G/97/2011/Pt/114 dated 10-12-2015.
H. Because, with regard to remark- A(2) corresponding to point
no.13 which sets out the following“Proposed to be included in F.Y. 2015-16, should be in F.Y.
2016-17”, it is humbly submitted before this Hon’ble Court
that as the order placed by the Govt. of Assam was in FY
2015-16, hence the turnover with regard to the material
supplied in FY 2015-2016 is considered in FY2015-16 and if
any supplies is made in FY 2016-17, the same is considered
in financial year FY 2016-17.
I. Because, with regard to remark- A(3) corresponding to point
no.13 which sets out the following- “Turnover for F.Y. 201516 is less than 10 crores”, it is humbly submitted before this
Hon’ble Court that the petitioner had already submitted CA
(Chartered Accountant) Certificate stating turnover of the
petitioner as more than Rs.10 crores in FY 2016-17, FY
2017-18 & FY 2018-19. As the said RFP demanded turnover
of Rs.10 crores each in last three years ie., FY 2016-17, FY
2017-18 & FY 2018-19 which is fulfilled by the petitioner.
The turnover of FY 2015-16 regardless of whether it is
fulfilled by the petitioner or not is immaterial for the
consideration of technical bid for the reasons that the last
three years would be 2016-17, 2017-18 and 2018-19 as the
financial year ended in March 2019, the RFP having been
issued in May 2019.
J. Because, with regard to remark- A(4) corresponding to point
no.13 which sets out the following- “Supply Order dated 1012-2016 amounting to Rs.5.89 crore should be accounted in
F.Y. 2016-17 (wrongly included in F.Y. 2015-16)”, it is
humbly submitted before this Hon’ble Court that the supply
order is dated 10-12-2015 and not 10-12-2016 as has
already been clarified in the foregoing paragraphs as per
Review Pet. No. 2 of 2020
Contd…/-
[21]
Supply Order No. DSW(ICDS)G/97/2011/Pt/114 dated 1012-2015 as attached in the technical bid, therefore, it was
included in F.Y. 2015-16.
K. Because, with regard to remarks-B(1) and B(2) corresponding
to point no.13 which set out the following“(1) Two supply orders dated 27-03-2016, one included in
FY, 2015-16 & another included in FY, 2016-17.
2) Two supply orders dated 31-03-2016 are included in FY
2015-16 & another in FY, 2016-17”, it is humbly submitted
before this Hon’ble Court that yet again, there is a
typographical error in the Completion certificate issued by the
Director/ WCB, Arunachal Pradesh. However, it is submitted
that the details of the supply order with correct dates had
already been submitted for verification. The same is
reproduced belowSl.
No.
1.
2.
3.
Tender
year
2015-16
2016-17
Supply order No.
Date
Item
WCD-38/2015-16
(SNP)
WCD-38/2015-16
(SNP)
31/3/2016
Kheer
31/3/2016 (mis-typed as
27/3/2016 in completion
certificate)
27/3/2017 (mis-typed as
27/3/2016 in completion
certificate)
27/3/2017 (mis-typed as
31/3/2016 in completion
certificate)
Cereal Based
Weaning
Food
Kheer
WCD-48/2016-17
(SNP)
WCD-48/2016-17
(SNP)
Cereal Based
Weaning
Food
L. Because, with regard to remark- B(3) corresponding to point
no.13 which sets out the following-“Äs per the Certificate for
supply dated 05.12.2018 signed by Director, Deptt. Of
women & Child Development, Govt. of Arunachal Pradesh,
two supply orders claiming to be for the FY 2017-18 are
dated 07.04.2018. The total amount involved under the two
supply orders is Rs. 3,17,18,075/- inclusion of these supply
orders and accounting it under 2017-18 is incorrect
considering that the supply orders relates to 2018-19.
Further, it is inappropriate to include turnover for supplies
made in a given year i.e. 2018-19 in the turnover of the
preceding year, 2017-18. Therefore, the turnover for 2017-18
as indicated in the certificate for supplies dated 05.12.2018 is
incorrect and cannot be included in the turnover for 2017-18.
Considering this, the requirement of turnover of Rs.10 crore
Review Pet. No. 2 of 2020
Contd…/-
[22]
for 2017-19 is not met by the firm”, it is humbly submitted
before this Hon’ble Court that the completion certificate
issued by Director, Dept. of Women & Child Development,
Govt. of Arunachal Pradesh is based on Tender Issue year
and not the year of the actual goods supplied. The petitioner
had considered the turnover of the above mentioned supply
orders in FY 2018-19 only. Moreover, the petitioner in the
technical bid had submitted another completion certificate
No.WCD-01/2011-12(SNP) Pt.-11/1939 dated 20.06.2019
which clearly mentioned that M/S Aasray Concept Foods,
had completed a supply of Rs. 5,31,94,470/- (five Crores
Thirty One Lakhs Ninety-four Thousand Four Hundred
Seventy Rupees Only) of rice Based Kheer (Ready to Eat)
as Energy Dense Food and Rs.1,09,80,480/- (One Crore
Nine Lakhs Eighty Thousand Four Hundred Eighty Rupees
Only) of Cereal based Weaning Food in the year 2018-19.
After totaling the said amounts, the resultant amount comes
to Rs. 6,41,74,950/- (Six Crores Forty One Lakhs Seventy
Four Thousand Nine Hundred Fifty Only) in the year 201819, apart from the other supplies made in the same year.
The turnover of Rs. 10 crores in FY2017-18 is met by the
following work orders & completion certificates in lakhsSl.
No.
State
Order No.
Order Dt.
Experience
Certificate No.
Dated
1.
Mizoram
21.03.2017
NIL
06.09.2017
2.
Mizoram
27.10.2017
NIL
04.12.2017
139.18
3.
Arunachal
27.03.2017
WCD-01/201112(SNP)pt-I
05.12.2018
518.78
4.
Arunachal
27.03.2017
WCD-01/201112(SNP)pt-I
05.12.2018
221.64
5.
Meghalaya
D.24012/3/2
017DTE(SNP)
D.24012/3/2
017DTE(SNP)
WCD48/201617(SNP)
WCD48/201617(SNP)
SW/SNP.3/2
016/83878435
Worth
of the
supply
orders
128.3
20.12.2017
SW/CW/MISC49/2013/12875
17.01.2020
174.66
[5]
In Kamlesh Verma Versus Mayawati & Ors., (2013) 8 SCC
320, the Hon’ble Supreme Court, while considering the issue as to
Review Pet. No. 2 of 2020
Contd…/-
[23]
whether the review petitioner therein has made out a case for reviewing
the judgment and order and satisfies the criteria for reviewing the same in
review jurisdiction, had considered the scope of the review jurisdiction.
After referring to its earlier decisions, the Hon’ble Supreme Court has
held:
“20. Thus, in view of the above, the following grounds of review are
maintainable as stipulated by the statute:
20.1. When the review will be maintainable:
(i) Discovery of new and important matter or evidence which,
after the exercise of due diligence, was not within
knowledge of the petitioner or could not be produced by
him;
(ii) Mistake or error apparent on the face of the record;
(iii) Any other sufficient reason.
The words "any other sufficient reason" have been
interpreted in Chhajju Ram v. Neki and approved by this Court
in Moran Mar Basselios Catholicos v. Most Rev. Mar
Poulose Athanasius to mean "a reason sufficient on grounds
at least analogous to those specified in the rule". The same
principles have been reiterated in Union of India v. Sandur
Manganese & Iron Ores Ltd.
20.2. When the review will not be maintainable:
(i) A repetition of old and overruled argument is not enough to
reopen concluded adjudications.
(ii) Minor mistakes of inconsequential import.
(iii) Review proceedings cannot be equated with the original
hearing of the case.
(iv) Review is not maintainable unless the material error,
manifest on the face of the order, undermines its soundness
Review Pet. No. 2 of 2020
Contd…/-
[24]
or results in miscarriage of justice.
(v) A review is by no means an appeal in disguise whereby an
erroneous decision is reheard and corrected but lies only for
patent error
(vi) The mere possibility of two views on the subject cannot be a
ground for review.
(vii) The error apparent on the face of the record should not be
an error which has to be fished out and searched.
(viii) The appreciation of evidence on record is fully within the
domain of the appellate court, it cannot be permitted to be
advanced in the review petition.
(ix) Review is not maintainable when the same relief sought at
the time of arguing the main matter had been negatived.”
The above decision of the Hon’ble Supreme Court has been
referred to and relied upon by this Court in many cases. On top of that, it
has been referred to by the Hon’ble Supreme Court in one of its recent
decision rendered in Akshay Kumar Singh Vs. State (NCT of Delhi),
(2020) 3 SCC 431 wherein the Hon’ble Supreme Court has held that it is
no longer res intrega that the scope of review is limited and review cannot
be entertained except in case of error apparent on the face of the record.
Review is not a rehearing of the appeal over again. In a review petition, it
is not for the Court to re-appreciate the evidence and reach a different
conclusion.
[6.1]
It is not in dispute that the Director, Social Welfare, Government
of Manipur issued a Tender Notice dated 29-05-2019 inviting bids from
competent and eligible manufacturers for supply of Micronutrient Blended
Energy Dense Food, followed by a Request for Proposal containing the
Review Pet. No. 2 of 2020
Contd…/-
[25]
terms and conditions thereof. One of the eligibility criteria was that the
bidder should have a turnover of Rs.10 crore each for the financial years,
2015-16, 2016-2017 and 2017-18 which was changed to the financial
years, 2016-17, 2017-18 and 2018-19 pursuant to the request made by
the petitioner. The petitioner participated in the tender by submitting its
bids. The Technical bids were opened on 03-09-2019 in the presence of
the representatives of all the bidders including that of the petitioner. A
representation dated 30-11-2019 was submitted by the petitioner,
because of which a meeting was convened on 04-12-2019 for its
consideration. As the petitioner’s claim could not be verified, the technical
bid’s evaluation was reverted and while reverting the bids and redownloading the documents submitted online by the petitioner on 21-122019, its representatives were present and therefore, there was no
question of violation of the procedure set by law. The technical bids were
re-considered but the petitioner was found to have not fulfilled the
eligibility criteria in respect of the turnover for the financial year, 2017-18
and accordingly, its bid was rejected by the Tender Committee. A
meeting of the Higher Tender Committee (HTC) was held on 07-04-2020
for consideration of the proceedings of the Tender Committee and its
approval was conveyed to the Director (Social Welfare), Government of
Manipur vide a letter dated 08-04-2020 and accordingly, the supply
orders was issued on 09-04-2020.
[6.2]
The tender process came to be challenged by the petitioner
mainly on three grounds that no reason was assigned by the Tender
Review Pet. No. 2 of 2020
Contd…/-
[26]
Committee for rejection of its technical bids; that the petitioner was not
informed about the rejection of its technical bids nor was it uploaded in
the website and that no copy of the proceedings of the Tender Committee
and in particular, the annexure thereto, was furnished to it. After having
appreciated the submissions and the materials on record, this Court
dismissed the writ petitions filed by the petitioner and being aggrieved by
it, the instant review petition has been filed on the grounds mentioned
hereinabove and that too, after its SLP being dismissed by the Hon’ble
Supreme Court.
[6.3]
The observation of the Tender Committee is that the completion
certificate dated 30-09-2016 and the supply order dated 10-12-2016 are
contradictory for the reason that the completion certificate cannot be said
to have mentioned the supply order dated 10-12-2016 which is later in
point of time and therefore, the amount mentioned in the supply order
dated 10-12-2016 should be counted for the financial year, 2016-17. But
it has been submitted by the counsel appearing for the petitioner that it
was a typographical error and that the supply order 10-12-2016 ought to
be read as the supply order dated 10-12-2015 as is evident from the
supply order itself and therefore, the amount mentioned therein should be
counted for the financial year, 2015-16. It has further been submitted by
him that it will make no difference whether the amount mentioned therein
should be counted for the financial year, 2015-16 or not for the reason
that the turnover of Rs.10 crore each ought to be for the financial years,
2016-17, 2017-18 and 2018-19. So far as the financial year, 2017-18 is
Review Pet. No. 2 of 2020
Contd…/-
[27]
concerned, it has been observed by the Tender Committee that as per
the certificate dated 05-12-2018 signed by Director, Deptt. of Women &
Child Development, Government of Arunachal Pradesh, two supply
orders, claiming to be for the FY 2017-18, are dated 07-04-2018 for a
total amount of Rs.3,17,18,075/- and therefore, their counting for the
financial year 2017-18 is incorrect, as the same relate to the supply for
the financial year, 2018-19. The petitioner made an attempt to explain it
by submitting that the completion certificate is based on the year of the
tender being issued and not the year when the actual goods are supplied.
Moreover, it has further been submitted that the annual turnover of a
Firm/ Company is ascertained by the certificates issued by a Chartered
Account which the official respondents have failed to consider it.
[6.4]
As has been held by the Hon’ble Supreme Court, the review
petition can be entertained, when the error is apparent on the basis of
record. On perusal of the averments made in the review petition, it is
seen that the petitioner has failed to point out any error crept in the
judgment and order which is apparent on the face of record except
repeating the grounds which have been considered by this Court in the
writ petitions. The error apparent on the face of record can be understood
mainly with reference to the findings arrived at by this Court contrary to
what is there in the document. The explanation given by the petitioner in
the review petition is not an error apparent on the face of record but is a
matter of appreciation which cannot be the ground for reviewing the
judgment and order by this Court. As seen from the review petition, the
Review Pet. No. 2 of 2020
Contd…/-
[28]
error appears to be in the document itself filed by the petitioner, on the
basis of which the Tender Committee has made its observation which
was accepted by this Court. It is the petitioner which could have it
rectified before it was filed before this Court. Such error as contended by
the petitioner may be a ground for an appeal before the appropriate forum
which is also impermissible now for the reason that the petition for special
leave to appeal preferred by the petitioner against the judgment and
order, has already been dismissed by the Hon’ble Supreme Court.
[7]
In view of the above and for the reasons stated hereinabove, the
review petition is devoid of any merit and is accordingly dismissed with no
order as to costs.
Before parting from this Case, this Court is of the opinion that
the counsel appearing for the petitioner, Shri Anjan Sahu being a young
advocate, the manner in which he has rendered assistance to this Court,
can be appreciated and it is hoped that he will keep it up for the years to
come in future. The Senior Advocates practicing before this Court are
expected to provide opportunities to their juniors so that they can exhibit
their talents.
JUDGE
FR / NFR
Victoria
Review Pet. No. 2 of 2020
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review