APHC010531282025
IN THE HIGH COURT OF ANDHRA PRADESH
AT AMARAVATI
(Special Original Jurisdiction)
[3460]
FRIDAY, THE TWENTIETH DAY OF FEBRUARY
TWO THOUSAND AND TWENTY SIX
PRESENT
THE HONOURABLE SRI JUSTICE NYAPATHY VIJAY
WRIT PETITION NO: 27166/2025
Between:
1. KOSOL ENERGIE PRIVATE LIMITED, AND M/S. KION PROJECTS
AND INDUSTRIES (JV) REPRESENTED BY ITS AUTHORISED
PERSON AT D.NO.193, SATYAGRAH CHHAVANI SG HIGHWAY,
AHMEDABAD, GUJARAT.
2. B.VISHNU VARDHAN REDDY, S/O.B.NAGI REDDY, AGED
ABOUT 38 YEARS OCC MANAGING PARTNER OF M/S. KION
PROJECTS AND INDUSTRIES AT VILLA NO. 190 27-190,
RAMAKRISHNA TOWERSHIP
NAMBURU, PEDAKAKAKI
MANDAL, GUNTUR, AP
...PETITIONER(S)
AND
1. THE STATE OF AP, REP. BY ITS SECRETARY DEPARTMENT
OF SCHOOL EDUCATION
SECRETARIAT BUILDINGS,
VELAGAPUDI AMARAVATI, ANDHRA PRADESH.
2. THE STATE PROJECT DIRECTOR, SAMAGRA SHIKSHA, STATE
IMPLEMENTATION SOCIETY
KBC BOYS HIGH SCHOOL
PREMISES PATAMATA, VIJAYAWADA, KRISHNA
3. THE CHIEF ENGINEER, SAMAGRA SHIKSHA, STATE
IMPLEMENTATION SOCIETY KBC BOYS HIGH SCHOOL
PREMISES PATAMATA, VIJAYAWADA, KRISHNA.
4. 4 M/S CHERIESH POWER TECHNOLOGIES, (PLOT NO.CA17. APIIC, AUTO NAGAR, MANGALAGIRI, GUNTUR
DISTRICT, ANDHRA PRADESH-522 503), AND M/S.
SUNRAYS GREEN POWER
(196/1, VELLATUR ROAD,
BHATTIPROLU, GUNTUR DISTRICT, ANDHRA PRADESH)
JOINT VENTURE, REP.BY SOLE PROPRIETOR OF M/S
CHERIESH POWER TECHNOLOGIES, SMT POTLURI
SAILAJA W/O SRI PEMMASANI SREEDHAR, AGED ABOUT
52 YEARS, R/O D.NO.11-86, FLAT NO.201, GOLI
SAMBASIVA
RESIDENCY,
MANGALAGIRI,
GUNTUR
DISTRICT, ANDHRA PRADESH - 522 503.
5. 5 M/S CHERIESH POWER TECHNOLOGIES, PLOT NO.CA17, APIIC, AUTO NAGAR, MANGALAGIRI GUNTUR
DISTRICT, ANDHRA PRADESH - 522 503 REP.BY ITS SOLE
PROPRIETOR SMT. POTLURI SAILJA W/O SRI PEMMASANI
SREEDHAR, AGED ABOUT 52 YEARS R/O D.NO.11-86,
FLAT
NO.201,
GOLI
SAMBASIVA
RESIDENCY,
MANGALAGIRI, GUNTUR DISTRICT. ANDHRA PRADESH 522 503.
6. M/S SUNRAYS GREEN POWER SOLUTIONS, 196/1,
VELLATUR ROAD, BHATTIPROLU, GUNTUR DISTRICT,
ANDHRA PRADESH), REP.BY ITS SOLE PROPRIETOR SRI
NAMBURU VENKATA SATYA TEJA KUMAR
S/O RAMA
MANOHAR, R/O D.NO.3-28, VELLATURU, BHATIPROLU
MANDAL, BAPATLA DISTRICT, ANDHRA PRADESH - 522
257. RR 4 TO 6 ARE IMPLEADED AS PER THE COURT'S
ORDER DT.05.11.2025 IN I.A.NO.05 OF 2025.
...RESPONDENT(S):
Petition under Article 226 of the Constitution of India praying
that in the circumstances stated in the affidavit filed therewith, the
High Court may be pleased to for the aforesaid reasons, it is most
humbly prayed that this Hon’ble Court may be pleased to Issue a
Writ, Order or Direction, more particularly one in the nature of Writ of
Mandamus declaring the action of the respondents more particularly
the 2nd respondent in rejecting the petitioners technical bid dated
14.08.2025 submitted pursuant to Bid No. GEM/2025/B/6459564
dated 16.07.2025 Design, Engineering, Supply, Installation, Testing
and Commissioning of Grid Connected Solar Roof Top Systems of
Aggregate Capacity 3550 KWP including Liaison and Load
Enhancement of 1594 KV with DISCOM, Warranty and Maintenance
for 5 Years to 415 Nos. PM Shri Schools on the ground that the
solvency certificate dt.13.08.2025 was not uploaded/validated before
the bid closing date, vide proceedings in Proc.Rc.No.SS13026/33/2024-CIVIL SEC-SSA dated 29.09.2025 and issuance of
Sanction Order/Contract vide No. 511687710986395 dated
03.10.2025 in favour of M/s Cherish Power Technologies as illegal,
arbitrary and violative of Articles 14, 19(1)(g) of the Constitution of
India and consequently set aside the said rejection order
dt.29.09.2025 and its consequential action of issuance of Sanction
Order/Contract vide No 511687710986395 dated 03.10.2025 to M/s.
Cheriesh Power Technologies, by directing the respondents to
consider the solvency certificate dated 13.08.2025 submitted by the
1st petitioner through GEM portal for evaluating their technical bid
and accordingly consider the Petitioners bid in respect of the said
work and pass such other order or orders as this Hon’ble Court may
deem fit and proper in the facts and circumstances of the case.
Prayer is amended as per the Court's Order dt.22.01.2026 in
I.A.No.03 of 2025.
IA NO: 1 OF 2025
Petition under Section 151 CPC
praying that in the
circumstances stated in the affidavit filed in support of the petition,
the High Court may be pleased to stay all further proceedings
pursuant to Bid No.GEM/2025/B/ 6459564 dated 16.07.2025,
“Design,
Engineering,
Supply,
Installation,
Testing
and
Commissioning of Grid Connected Solar Roof Top Systems of
Aggregate
Capacity 3550 KWP including Liaison & Load
Enhancement of 1594 KV with Respondents DISCOM, Warranty
and Maintenance for 5 Years to 415 Nos. PM Shri Schools and pass
such other orders.
IA NO: 2 OF 2025
Petition under Section 151 CPC praying that in the
circumstances stated in the affidavit filed in support of the petition,
the High Court may be pleased may be pleased to implead the
proposed respondent no.4 as party respondent No.4 and pass such
other orders.
IA NO: 3 OF 2025
Petition under Section 151 CPC
praying that in the
circumstances stated in the affidavit filed in support of the petition,
the High Court may be pleased may be pleased to permit the
petitioner to amend the affidavit filed in support of the WP.No.27166
of 2025 by amending para 2 as mentioned in para 5 herein, by
incorporating paras 9-vii to 9-xiii and also permit the petitioners to
amend the payer in WP.No.27166 of 2025 by replacing the main
prayer: “For the aforesaid reasons, it is most humbly prayed that
this Hon’ble Court may be pleased to issue a Writ, Order or
Direction, more particularly one in the nature of Writ of Mandamus
declaring the action of the respondents in rejecting the petitioner’s
technical bid dated 14.08.2025 submitted pursuant
to Bid
NO.GEM/2025/B/6459564 dated 16.07.2025 “Design, Engineering,
Supply, Installation, Testing and Commissioning of Grid Connected
Solar Roof Top Systems of Aggregate Capacity 3550 KWp including
Liaison & Load Enhancement of 1594 KV with Discom, Warranty
and Maintenance for 5 Years to 415 Nos. PM Shri Schools.” on the
ground that the solvency certificate submitted by the 1st Petitioner is
more than 3 months old, vide Proceedings dated 29.09.2025 as
illegal, arbitrary and violative of Art. 14, 19(1)(g) of Constitution of
India and consequently set aside the said rejection order
dt.29.09.2025 by directing the respondents to consider the solvency
certificate dated 13.08.2025 submitted by the 1st petitioner through
GEM portal for evaluating their technical bid and accordingly
consider the Petitioner’s bid in respect of the said work and pass
such other order or orders as this Hon’ble Court may deem fit and
proper in the facts and circumstances of the case.” With the
following prayer; “For the aforesaid reasons, it is most humbly
prayed that this Hon’ble Court may be pleased to Issue a Writ,
Order or Direction, more particularly one in the nature of Writ of
Mandamus declaring the action of the respondents more particularly
the 2nd respondent in rejecting the petitioner’s technical bid dated
14.08.2025 submitted pursuant to Bid No.GEM/2025/B/6459564
dated 16.07.2025 “Design, Engineering, Supply, Installation, Testing
and Commissioning of Grid Connected Solar Roof Top Systems of
Aggregate
Capacity 3550 KWp including Liaison & Load
Enhancement of 1594 KV with Discom, Warranty and Maintenance
for 5 Years to 415 Nos. PM Shri Schools”on the ground that the
solvency certificate dt 13.08.2025 was not uploaded/validated
before the bid closing date, vide proceedings in Proc.Rc.No.SS13026/33/2024-CIVIL SEC-SSA dated 29.09.2025 and issuance of
Sanction Order/Contract vide No.511687710986395 dated
03.10.2025 in favour of M/s Cheriesh Power Technologies as illegal,
arbitrary and violative of Art. 14, 19(1)(g) of Constitution of India and
consequently set aside the said rejection order dt.29.09.2025 and
its consequential action of issuance of Sanction Order/Contract vide
No.511687710986395 dated 03.10.2025 to M/s Cheriesh Power
Technologies, by directing the respondents to consider the solvency
certificate dated 13.08.2025 submitted by the 1st petitioner through
GEM portal for evaluating their technical bid and accordingly
consider the Petitioner’s bid in respect of the said work and pass
such other order or orders as this Hon’ble Court may deem fit and
proper in the facts and circumstances of the case” and pass such
other orders.
IA NO: 4 OF 2025
Petition under Section 151 CPC praying that in the
circumstances stated in the affidavit filed in support of the petition,
the High Court may be pleased to suspend the Sanction
Order/Contract vide No.511687710986395 dated 03.10.2025 issued
in favour of M/s Cheriesh Power Technologies and pass such other
orders.
IA NO: 5 OF 2025
Petition under Section 151 CPC
praying that in the
circumstances stated in the affidavit filed in support of the petition,
the High Court may be pleased to implead the petitioners herein :
viz 1) M/s. Cheriesh Power Technologies (Plot No.CA-17, APIIC
Auto Nagar, Mangalagiri, Guntur District, Andhra Pradesh - 522
503), and M/s. Sunrays Green Power Solutions (# 196/1, Vellatur
Road, Bhattiprolu, Guntur District, Andhra Pradesh) Joint Venture,
Rep.by sole proprietor of M/s. Cheriesh Power Technologies, Smt.
Potiuri Saiija W/o Sri Pemmasani Sreedhar, Aged about 52 years
R/o D.No. 11-86, Flat No.201, Goli Sambasiva Residency
Mangalagiri, Guntur District, Andhra Pradesh - 522 503, 2) M/s.
Cheriesh Power Technologies, # Plot No.CA-17, APIIC, Auto Nagar,
Mangalagiri, Guntur District, Andhra Pradesh - 522 503 , Rep.by its
Sole Proprietor Smt. Potiuri Saiija W/o Sri Pemmasani Sreedhar,
Aged about 52 years, R/o D.No.11-86, Flat No.201, Goli Sambasiva
Residency, Mangalagiri, Guntur District, Andhra Pradesh - 522 503,
and 3) M/s. Sunrays Green Power Solutions, # 196/1, Vellatur
Road, Bhattiprolu, Guntur District, Andhra Pradesh), Rep.by its sole
proprietor, Sri Namburu Venkata Staya Teja Kumar, S/o Rama
Manohar, R/o D.No.3-28, Veilaturu Bhatiprorlu Mandal, Bapatia
District, Andhra Pradesh - 522 257, as Respondent Nos.4 to 6 in the
W.P No.27166 of 2025 and in all the miscellaneous applications
therein, and to pass such other orders.
IA NO: 6 OF 2025
Petition under Section 151 CPC praying that in the
circumstances stated in the affidavit filed in support of the petition,
the High Court may be pleased may be pleased to vacate the interim
orders dated 03-10-2025 passed in W.P No.27166 of 2025, pending
the above Writ Petition, and pass such other orders.
IA NO: 7 OF 2025
Petition under Section 151 CPC
praying that in the
circumstances stated in the affidavit filed in support of the petition,
the High Court may be pleased to vacate the interim orders dated:
03.10.2025 in WP.NO.27166/2025 and may be pleased to dismiss
the writ petition in the interest of justice and pass such other orders.
IA NO: 1 OF 2026
Petition under Section 151 CPC praying that in the
circumstances stated in the affidavit filed in support of the petition,
the High Court may be pleased to grant leave to the Petitioner to file
reply affidavit to the counter filed by respondents by condoning the
delay and consequently order to receive the reply Affidavit on record
and pass such other orders.
Counsel for the Petitioner(S):
1. M/S INDUS LAW FIRM
Counsel for the Respondent(S):
1. GP FOR SCHOOL EDUCATION
2. LEO LAW ASSOCIATES LLP
The Court made the following:
HON’BLE SRI JUSTICE NYAPATHY VIJAY
WRIT PETITION No.27166 of 2025
ORDER:
1.
The present Writ Petition is filed questioning the rejection of the
Petitioners’ technical bid dated 14.08.2025 submitted pursuant to
Bid No.EGM/2025/B/6459564 dated 16.07.2025 “Design, Engineering,
Supply, Installation, Testing and Commissioning of Grid Connected
Solar Roof Top Systems of Aggregate Capacity 3550 KWP including
Liaison & Load Enhancement of 1594 KV with DISCOM, Warranty and
Maintenance for 5 years to 415 Nos. PM Shri Schools” on the ground
that the Solvency Certificate submitted by Petitioner No.1 is more than
three (3) months old vide Proceedings dated 29.09.2025, as illegal and
arbitrary.
2.
After filing the Writ Petition, a Memorandum of Understanding
was entered in between Petitioner No.1, Respondent No.4 to 6 and
M/s Eshaan Energy on 19.02.2026, where under the scope of work
under the total project value of the tender was apportioned as under;
“First Party/Respondent Nos.4 to 6 – 40%;
Second Party/M/s Eshaan Energy – 30%; and
Third Party/Petitioner No.1 – 30%.”
3.
A letter vide Lr.Rc.No.Spl/ CW/ SS/ Court Cases/ 2025-26
dated 20.02.2026 issued by the State Project Director, Samagra
Shiksha is passed on to the Court, wherein it is stated that the
Memorandum of Understanding referred above is ratified. In view
thereof, no further orders are required to be passed.
4.
The Writ Petition is closed by placing the Memorandum of
Understanding dated 19.02.2026 and the Letter dated 20.02.2026 on
record.
5.
No order as to costs.
6.
As a sequel, pending applications, if any, shall stand closed.
__________________
NYAPATHY VIJAY, J
Date: 20.02.2026
IS
HON’BLE SRI JUSTICE NYAPATHY VIJAY
WRIT PETITION No.27166 of 2025
Date: 20.02.2026
IS
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review