-1IN THE HIGH COURT OF KARNATAKA AT BENGALURU
DATED THIS THE 12th DAY OF JUNE, 2026
BEFORE
THE HON’BLE MRS. JUSTICE K.S. HEMALEKHA
WRIT PETITION No.13316/2025 (GM-KEB)
C/W
WRIT PETITION No.14646/2025 (GM-KEB),
WRIT PETITION No.26022/2025 (GM-KEB),
WRIT PETITION No.30238/2025 (GM-KEB)
IN W.P.NO.13316/2025
BETWEEN:
DISTRIBUTED SOLAR POWER ASSOCIATION
THROUGH ITS AUTHORIZED
REPRESENTATIVE FAIZA ZIA
REGISTERED OFFICE OF THE
SOCIETY IS AT A-57,
DDA SHEDS, OKHLA INDUSTRIAL,
PHASE-II, NEW DELHI-110020.
MAHALAKSHMI B M
Location: High Court
of Karnataka
...PETITIONER
(BY SRI C.K. NANDAKUMAR, SENIOR COUNSEL FOR
SRI MOHAMMED SHAMEER, ADVOCATE)
AND:
1.
KARNATAKA ELECTRICITY REGULATORY COMMISSION
REGISTERED OFFICE NO.16, C-1,
MILLERS TANK BUND RD,
BED AREA, VASANTH NAGAR,
BANGALORE-560052.
THROUGH SECRETARY.
2.
CENTRAL ELECTRICITY AUTHORITY
REGISTERED OFFICE AT SEWA BHAWAN,
RAMA KRISHNA PURAM,
-2SECTOR-1, NEW DELHI-110066.
THROUGH CHAIRPERSON.
... RESPONDENTS
(BY SMT. PRATIBHANU SINGH KHAROLA, ADVOCATE FOR R-1;
SRI ARAVIND KAMATH, ASG FOR R-2;
SRI K.N. PHANEENDRA, SENIOR COUNSEL FOR
SRI SHIVAPRASAD SHANTHANAGOUDAR, ADVOCATE FOR IMPLEADING
APPLICANT ON I.A.NO.2/2025)
THIS WRIT PETITION IS FILED UNDER ARTICLES 226 AND 227
OF THE CONSTITUTION OF INDIA, PRAYING TO ORDER OR DIRECTION
SETTING ASIDE / QUASH THE SUO-MOTU ORDER PASSED BY LD. KERC
DATED 28.03.2025 VIDE ANNEXURE-A WHEREBY LD. KERC HAS LAID
DOWN THE PROCEDURE FOR DATA COLLECTION, SCRUTINY AND
VERIFICATION OF INTRA-STATE CAPTIVE STATUS OF GENERATING
PLANTS AND CAPTIVE USERS, CHALLENGED HEREIN AND ETC.
IN W.P.NO.14646/2025
BETWEEN:
JSW ENERGY LIMITED
A COMPANY INCORPORATED UNDER
THE COMPANIES ACT, 1956
HAVING ITS REGISTERED OFFICE AT
JSW CENTRE, BANDRA KURLA COMPLEX,
BANDRA (EAST), MUMBAI-400051
REPRESENTED BY ITS
AUTHORIZED SIGNATORY
MR. KARTIKEYA MISRA,
Email: kartikeya.misra@jsw.in
...PETITIONER
(BY SRI DHYAN CHINNAPPA, SENIOR COUNSEL FOR
SRI LOMESH KIRAN N., ADVOCATE)
AND:
KARNATAKA ELECTRICITY REGULATORY COMMISSION
TANK BED AREA, 16C-1,
MILLERS TANK BUND RD,
KAVERAPPA LAYOUT, VASANTH NAGAR,
BENGALURU, KARNATAKA-560052
-3REPRESENTED THROUGH ITS SECRETARY
Email: kerc-ka@nic.in
...RESPONDENT
(BY SMT. PRATIBHANU SINGH KHAROLA, ADVOCATE)
THIS WRIT PETITION IS FILED UNDER ARTICLE 226 OF THE
CONSTITUTION OF INDIA, PRAYING TO QUASH THE IMPUGNED ORDER
DATED 28.03.2025 PASSED BY THE LD. COMMISSION AS BEING,
PRODUCED AT ANNEXURE-A; QUASH THE KERC CAPTIVE VERIFICATION
PROCEDURE FOR VERIFICATION OF CAPTIVE STATUS OF CAPTIVE
GENERATING PLANT AND ITS CAPTIVE USER(S) LOCATED WITHIN
STATE OF KARNATAKA ALONG WITH ITS ANNEXURES AS SET OUT IN
THE IMPUGNED ORDER DATED 28.03.2025 PASSED BY THE LD.
COMMISSION.
IN W.P.NO.26022/2025
BETWEEN:
1.
SEMBCORP GREEN INFRA PRIVATE LIMITED
(PREVIOUSLY KNOWN AS GREEN
INFRA WIND ENERGY LIMITED)
A COMPANY REGISTERED UNDER
THE COMPANIES ACT, 2013
THROUGH ITS AUTHORIZED REPRESENTATIVE
SHRIKANTH SHANTESHRAO KULKARNI,
ASSISTANT VICE PRESIDENT
REGISTERED OFFICE AT BUILDING 7A,
LEVEL 5, DLF CYBER CITY,
GURUGRAM-122002.
2.
GREEN INFRA WIND POWER GENERATION LIMITED
A COMPANY REGISTERED UNDER
THE COMPANIES ACT, 2013
THROUGH ITS AUTHORISED REPRESENTATIVE
SHRIKANTH SHANTESHRAO KULKARNI
ASSISTANT VICE PRESIDENT
BUILDING 7A, LEVEL 5, DLF CYBER CITY,
GURUGRAM-122 002, HARYANA.
3.
GREEN INFRA CLEAN SOLAR ENERGY LIMITED,
A COMPANY REGISTERED UNDER
THE COMPANIES ACT, 2013
THROUGH ITS AUTHORIZED REPRESENTATIVE
-4SHRIKANTH SHANTESHRAO KULKARNI
ASSISTANT VICE PRESIDENT
REGISTERED OFFICE AT BUILDING 7A,
LEVEL 5, DLF CYBERCITY,
GURUGRAM, HARYANA-122002.
4.
GREEN INFRA SOLAR POWER PROJECTS LIMITED
A COMPANY REGISTERED UNDER
THE COMPANIES ACT, 2013
THROUGH ITS AUTHORIZED REPRESENTATIVE
SHRIKANTH SHANTESHRAO KULKARNI
ASSISTANT VICE PRESIDENT
REGISTERED OFFICE AT BUILDING 7A,
LEVEL 5, DLF CYBERCITY,
GURUGRAM, HARYANA-122002.
5.
GREEN INFRA CLEAN WIND POWER LIMITED
A COMPANY REGISTERED UNDER
THE COMPANIES ACT, 2013
THROUGH ITS AUTHORIZED REPRESENTATIVE
SHRIKANTH SHANTESHRAO KULKARNI
ASSISTANT VICE PRESIDENT
REGISTERED OFFICE AT BUILDING 7A,
LEVEL 5, DLF CYBERCITY,
GURUGRAM, HARYANA-122002.
...PETITIONERS
(BY SRI VISHROV MUKHARJEE AND SRI YASHASWI KANT, ADVOCATES)
AND:
KARNATAKA ELECTRICITY REGULATORY COMMISSION
THROUGH ITS SECRETARY,
REGISTERED OFFICE NO.16, C-1,
MILLERS TANK BUND RD, BED AREA,
VASANTH NAGAR, BANGALORE-560052.
...RESPONDENT
(BY SMT. PRATIBHANU SINGH KHAROLA, ADVOCATE)
THIS WRIT PETITION IS FILED UNDER ARTICLES 226 AND 227
OF THE CONSTITUTION OF INDIA, PRAYING TO DIRECTION SETTING
ASIDE/QUASHING THE SUO-MOTU ORDER PASSED BY LD. KERC DATED
28.03.2025 (ANNEXURE-A) WHEREBY LD. KERC HAS LAID DOWN THE
PROCEDURE FOR DATA COLLECTION, SCRUTINY AND VERIFICATION OF
-5INTRA-STATE CAPTIVE STATUS OF GENERATING PLANTS AND CAPTIVE
USERS, TO THE EXTENT CHALLENGED HEREIN AND ETC.
IN W.P.NO.30238/2025
BETWEEN:
JSW STEEL LIMITED
A COMPANY INCORPORATED UNDER
THE COMPANIES ACT, 1956
HAVING ITS REGISTERED OFFICE AT
JSW CENTRE, BANDRA KURLA COMPLEX,
BANDRA (EAST), MUMBAI-400 051
REPRESENTED BY ITS
AUTHORISED SIGNATORY
MR. ASHISHKUMAR NAIR
Email: ashishkumar.nair@jsw.in
DESIGNATION: GENERAL MANAGER-LEGAL.
...PETITIONER
(BY SMT. TWINKLE J. CHADWA AND SRI AJAY T., ADVOCATES FOR
SRI LOMESH KIRAN N., ADVOCATE)
AND:
KARNATAKA ELECTRICITY REGULATORY COMMISSION
TANK BED AREA, 16C-1,
MILLERS TANK BUND RD,
KAVERAPPA LAYOUT, VASANTH NAGAR,
BENGALURU, KARNATAKA-560052.
REPRESENTED THROUGH ITS SECRETARY.
Email: kerc-ka@nic.in
...RESPONDENT
(BY SMT. PRATIBHANU SINGH KHAROLA, ADVOCATE;
SRI SHAHABAAJ HUSAIN, ADVOCATE FOR IMPLEADING APPLICANT)
THIS WRIT PETITION IS FILED UNDER ARTICLE 226 OF THE
CONSTITUTION OF INDIA, PRAYING TO QUASH THE IMPUGNED ORDER
DATED 28.03.2025 PASSED BY THE KERC AS BEING, PRODUCED AT
ANNEXURE-A AND ETC.
THESE WRIT PETITIONS HAVING BEEN HEARD AND RESERVED
FOR ORDERS ON 08/04/2026, COMING ON FOR PRONOUNCEMENT THIS
DAY, THE COURT MADE THE FOLLOWING:
-6-
CORAM:
HON'BLE MRS JUSTICE K.S. HEMALEKHA
CAV O R D E R
These writ petitions are filed challenging the order
dated
28.03.2025
passed
by
the
Karnataka
Electricity
Regulatory Commission (KERC) (Annexure-A), whereby the
“Procedure for Data Collection, Scrutiny and Verification of
Captive Status”, in respect of the captive generating plants
and captive users within the State of Karnataka has been
introduced. The petitioners principally challenge Clause 6.7 of
the
impugned
order
prescribing
procedure
relating
to
proportionality test and “Unitary Qualifying Ratio” (UQR)
applicable to the group active users.
2.
The petitioners in these writ petitions are entities
engaged in captive generation, captive consumption, renewal
energy regeneration and association of captive users within
the State of Karnataka.
-7-
3.
The petitioner in W.P.14646/2025 is “JSW Energy
Limited”, a company engaged in power generation and
operation of captive generating plants.
4.
The petitioner in W.P.No.30238/2025 is “JSW
Steel Limited”, is a captive user and beneficiary of captive
power arrangements.
5.
The petitioners in W.P.No.13316/2025 include
associations and stakeholders representing distributed solar
power producers, renewal captive generators and captive
users, who contend that the impugned procedure adversely
affect the captive status and surcharge exemption available
to their members under the Electricity Act, 2003 (‘Act, 2003’
for short).
6.
The
petitioners
in
W.P.No.26022/2025
are
‘Sembcorp Geen Infra Pvt. Ltd’, ‘Green Infra Wind Power
Generation ltd’, ‘Green Infra Clean Solar Energy ltd’, ‘Green
Infra Solar Power Projects ltd’ and ‘Green Infra Clean Wind
-8-
Power ltd’ are power generation and operation of captive
generating plants.
7.
The impleading applicant, who is Orient Cement
Limited, supporting the petitioners also state that the
impugned order is contrary to the scheme of Act, 2003 and
Rule 3 of the Electricity Rules, 2005 (‘Rules, 2005’ for short)
and law declared in the case of M/s. Dakshin Gujarat Vij
Company Limited Vs. M/s. Gayatri Shakti Paper and
Board Limited and Another1 (Dakshin Gujarat).
8.
I.A.No.5/2025 is filed by the BESCOM, who seeks
to come on record as an impleading applicant supporting the
impugned KERC order dated 28.03.2025.
9.
The petitioners and the impleading applicant i.e.,
Orient Cement Limited, challenged the impugned order
contending
that
the
impugned
order
(Annexure-A)
is
contrary to Section 9 of the Act, 2003 and Rule 3 of the
2023 SCC Online 1276
-9-
Rules, 2005 and the law declared by the Apex Court in the
case of Dakshin Gujarat.
10.
The petitioners state that the impugned order
suffers from lack of jurisdiction, retrospective operation and
violation of principles of natural justice and excessive
delegation.
11.
Learned Senior counsel C. K. Nanda Kumar,
appearing for the petitioners in W.P.No.13316/2025 submits
that the petitioners are group active users within the
meaning of Rule 3 of the Rules, 2005 and satisfy the
statutory
requirements
governing
“Captive
Generating
Plants”, and “Captive Users”. It is contended that the
impugned order dated 28.03.2025 passed by the KERC,
particularly Clause 6.7 of the Captive Verification Procedure,
is contrary to the provisions of the Act, 2003, Rule 3 of the
Rules, 2005 and the law declared by the Apex Court in
Dakshin Gujarat judgment. It is submitted that the Apex
Court in Dakshin Gujarat, while affirming Kadodara
- 10 -
Power Pvt. Ltd. and Others Vs. Gujarat Electricity
Regulatory Commission and Another2 (Kadodara Power
Pvt. Ltd.), interpreted Rule 3 and recognized “UQR”, based
on 51% consumption and 26% ownership, referring to the
paragraph Nos.25, 26, 27, 28, 42, 43, 44, 45 and 48 of the
said judgment, it is contended that the proportionality
requirement
applies
only
for
satisfying
the
qualifying
threshold of 51% captive consumption and cannot be
extended to total actual consumption.
12.
According to the learned Senior counsel, Rule 3
only prescribes minimum qualifications requirements and
does not contemplate any maximum cap or continuing ceiling
on consumption. It is argued that KERC, by introducing a
dynamic UQR formula, based on total actual consumption
and total ownership, has effectively rewritten Rule 3 and
introduced a new substantive condition not contemplated by
the statute or by the Apex Court’s Judgment.
2009 SCC Online APTEL 119
- 11 -
13.
It is further contended that paragraph No.26 of
the Dakshin Gujarat specifically uses the expression “not
less than”, thereby prescribing only a minimum threshold.
According to the petitioners, once 26% ownership and 51%
consumption are satisfied, the captive user qualifies and the
Rule
does
not
permit
any
upper
limit
restriction
or
disqualification mechanism on total consumption. Learned
Senior counsel submits that Rule 3 (3), inserted by the
amendment, specifically empowers the Central Electricity
Authority (CEA) to frame procedures for verification of
captive status in respect of interstate captive generating
plants and captive users. Therefore, KERC has no jurisdiction
to
independently
adopt
or
formulate
a
verification
mechanism for intrastate captive projects by borrowing the
CEA procedure.
14.
It is contended that KERC initially proposed draft
regulation in 2023 and revised draft regulation in 2024 under
Section 181 of the Act, 2003 and invited public objections.
However, the impugned order came to be issued without
- 12 -
fresh
public
notice,
consultations
or
hearing,
thereby
violating Section 86(3) of the Act, 2003 and principles of
natural justice.
15.
Learned Senior counsel for the petitioner further
contends that the impugned order retrospectively applies the
new
methodology
to
financial
year
2024-25,
though
procedure itself was issued subsequently. Such retrospective
operation, according to the petitioners, is impermissible and
seriously prejudices captive generators and captive users in
Karnataka.
It
is
argued
that
the
Karnataka
captive
generators are being discriminated against and exposed to
disqualification contrary to the statutory scheme and the
Apex Court’s judgment.
16.
Learned Senior counsel, Sri Dyan Chinnappa,
appearing for the petitioners in W.P.No.14646/2025 and the
petitioners
in
W.P.No.30238/2025
submits
that
notwithstanding the alternative remedy as contended by the
respondents, the impugned order is:
- 13 -
i.
Without jurisdiction.
ii.
The impugned order violates principles of natural
justice.
iii.
The challenge is to the delegated legislation
procedure framework itself.
iv.
The impugned order violates the binding law
declared by the Apex Court.
17.
In addition, learned Senior counsel submits that
the KERC has no substantive power under Sections 9, 86 or
181 of the Act, 2003 to redefine the captive qualification
norms already prescribed under Rule 3. It is contended that
once Rule 3 occupies the field, the stands interpreted by the
Apex Court, subordinate authorities cannot introduce a
different qualifying methodology.
18.
Learned Senior counsel, Sri K.N. Phaneendra,
learned Senior counsel for Sri Shivaprasad Shanthanagoudar,
learned counsel for impleading applicant, supports the
- 14 -
petitioners and contend that the impugned order is contrary
to the scheme of Act, 2003, Rule 3 of the Rules, 2005 and
the law declared in Dakshin Gujarat.
19.
Per
contra,
learned
counsel
appearing
for
respondent No.2-KERC submits that the writ petitions are
liable to be dismissed as the impugned order merely
operationalises Rule 3 of the Rules, 2005 and does not
introduce any new substantive condition. It is contended that
Rule 3 contains:
i.
Two group level thresholds namely:
a.
Minimum 26% ownership and
b.
Minimum
51%
aggregate
captive
consumption.
ii.
An
additional
proportionality
requirement
applicable to association of persons.
20.
According to KERC, the second proviso to Rule 3
(1)(a) independently mandates that captive users consume
- 15 -
electricity in proportion to their ownership within ± 10%
variation. It is contended that the proportionality necessarily
implies both lower and upper limits. If, no upper limit is
recognized,
insignificant
disproportionate
electricity
shareholder
may
consume
and
capital
benefits,
misuse
thereby “gaming” the system. Referring to paragraph Nos.43
to 47 of the Dakshin Gujarat, learned counsel submits that
the Apex Court recognized:
i.
Proportionality.
ii.
Annual determination.
iii.
Anti-gaming principles.
iv.
Weighted average ownership.
v.
Continuous compliance throughout the financial
year.
21.
Learned counsel submits that the petitioners
incorrectly treated the illustrative figure of 1.96% as a
universal fixed ratio. It is contended that 1.96% merely
- 16 -
represents a baseline qualifying illustration derived from
51% ÷ 26% and cannot be mechanically applied in all factual
situations. It is submitted that the dynamic “UQR” formula is
only a mathematical expression of proportionality already
embedded in Rule 3 and is necessary to prevent misuse by
captive users holding insignificant shares but consuming
disproportionate electricity. It is further contended that Rule
3(3) does not oust the jurisdiction of State Commission.
According to the learned counsel, Rule 3(3) merely enables
the CEA to prescribe procedure to interstate projects and
does not prohibit State Commission from determining captive
status of intrastate projects in exercise of their statutory
powers under Sections 42 and 86 of the Act, 2003. It is
submitted that the State Commission necessarily determines
captive sub-status while examining surcharge exemption
under Section 42(2) and therefore possesses incidental and
ancillary jurisdiction to prescribe verification methodology. It
is further contended that the impugned procedure is merely
procedural and not delegated legislation requiring prior
- 17 -
publication under Section 181(3). Therefore, the absence of
fresh consultation does not invalidate the order. It is
submitted that the writ petitions are premature, as no final
determination, disqualifying the petitioners has yet been
made and no surcharge liability has crystallized.
22.
It is further submitted that the petitioners have an
alternative effective remedy before the Appellate Tribunal for
Electricity (APTEL) under Section 111 of the Act, 2003.
23.
Per contra, Sri Aravind Kamath, learned ASG
appearing for respondent No.2, submits that the concept of
captive generating plants was being misused by several
entities through “gaming” and therefore, strict verification of
proportionality became necessary. It is contended that Rule
3 itself emphasizes proportionality between ownership and
consumption and CEA was specifically empowered under Rule
3(3) to frame procedure in respect of interstate captive
projects. According to the learned ASG, the CEA procedure
merely operationalises Rule 3 and gives effect to the
- 18 -
principles recognized in Dakshin Gujarat judgment. It is
admitted that the illustrations contained in the Apex Court’s
judgment are merely explanatory and cannot be treated as a
rigid universal formula applicable in all factual scenarios.
24.
It is contended that the impugned procedure is
intended to prevent misuse by insignificant shareholders
consuming
disproportionate
electricity
while
availing
exemption from cross subsidiary surcharge and additional
surcharge. The impleading applicant namely the BESCOM is
led by the Senior counsel Sri Shashikiran Shetty, who
supports the impugned order and contends that under
Section 42(2) of the Act, 2003, BESCOM is ordinarily entitled
to collect:
i.
Cross Subsidiary Surcharge (CSS) and
ii.
Additional Surcharge (ASC) from open access
consumer.
25.
It is submitted that the captive generating plants
are exempted from payment of CSS and ASC and therefore,
- 19 -
strict verification of captive status becomes necessary to
prevent misuse of statutory exemptions.
26.
Referring to Rule 3 and Judgment in Dakshin
Gujarat, it is contended that:
i.
Proportionality principle is mandatory.
ii.
Rule intends to prevent misuse of insignificant
shareholders.
iii.
The impugned provisions are designed to detect
non-genuine captive arrangements.
27.
It is submitted that the petitioners have an
alternative effective remedy before the APTEL under Section
111 of the Act, 2003 and technical issues concerning captive
verification should not be examined in a writ jurisdiction.
28.
This
Court
has
carefully
considered
the
contentions and perused the material on record. The points
that arise for consideration are:
- 20 -
i.
Whether the impugned order dated 28.03.2025
passed by the KERC, prescribing the “test of
proportionality for group active users”, is contrary
to Rule 3 of the Electricity Rules, 2005 and the
law declared by the Apex Court in Dakshin
Gujarat?
ii.
Whether the KERC could prescribe a dynamic
“UQR” based on total actual captive consumption
and
total
ownership,
contrary
to
the
proportionality formula recognized by Apex Court
in paragraph No.43 of the Dakshin Gujarat?
iii.
Whether the impugned order travels beyond the
scope of Rule 3 of the Rules, 2005 and introduce a
new
substantive
qualification
mechanism
not
contemplated under the Rules?
29.
In order to answer the aforesaid points for
consideration, it is necessary to refer to the relevant
definitions and provisions of the Act and the Rules. Section
2(8) of the Act, 2003 defines “Captive Generating Plant” as
under:
“Section 2. (Definitions): --- In this Act, unless
the context otherwise requires,--
- 21 (8) “Captive generating plant” means a power
plant set up by any person to generate electricity
primarily for his own use and includes a power plant
set up by any co-operative society or association of
persons for generating electricity primarily for use of
members of such cooperative society or association;”
30.
The person definition is defined under Section
2(49), which reads as under:
“(49) “person” shall include any company or
body corporate or association or body of individuals,
whether incorporated or not, or artificial juridical
person;”
31.
Section 9 of the Act, 2003 reads as under:
“Section 9. (Captive generation):
(1) Notwithstanding anything contained
in this Act, a person may construct,
maintain or operate a captive generating
plant and dedicated transmission lines:
Provided
that
the
supply
of
electricity from the captive generating
plant through the grid shall be regulated
in the same manner as the generating
station of a generating company.
- 22 [Provided further that no licence
shall be required under this Act for
supply of electricity generated from a
captive generating plant to any licencee
in accordance with the provisions of this
Act and the rules and regulations made
thereunder and to any consumer subject
to the regulations made under subsection
(2) of section 42.]
(2)
Every person, who has constructed
a captive generating plant and maintains
and operates such plant, shall have the
right to open access for the purposes of
carrying
electricity
from
his
captive
generating plant to the destination of his
use:
Provided that such open access shall
be subject to availability of adequate
transmission facility and such availability
of
transmission
facility
shall
be
determined by the Central Transmission
Utility or the State Transmission Utility,
as the case may be:
Provided further that any dispute
regarding the availability of transmission
- 23 facility shall be adjudicated upon by the
Appropriate Commission.”
32.
Rule 3 is being extracted for ready reference:
“3. Requirements of Captive Generating Plant.(1) No power plant shall qualify as a ‘captive
generating plant’ under section 9 read
with clause (8) of section 2 of the Act
unless(a) in case of a power plant –
(i) not less than twenty six percent of
the
ownership
is
held
by
the
captive user(s),
(ii) not less than fifty one percent of
the aggregate electricity generated
in such plant, determined on an
annual basis, is consumed for the
captive use:
Provided that in case of power
plant
set
up
by
registered
cooperative society, the conditions
mentioned under paragraphs at (i)
and (ii) above shall be satisfied
- 24 collectively by the members of the
cooperative society:
Provided further that in case of
association of persons, the captive
user(s) shall hold not less than
twenty
six
percent
of
the
ownership of the plant in aggregate
and
such
captive
user(s)
shall
consume not less than fifty one
percent
of
generated,
the
electricity
determined
on
an
annual basis, in proportion to their
shares in ownership of the power
plant
within
a
variation
not
exceeding ten percent;
(b) in case of a generating station
owned by a company formed as special
purpose
vehicle
for
such
generating
station, a unit or units of such generating
station identified for captive use and not
the entire generating station satisfy (ies)
the conditions contained in paragraphs
(i) and (ii) of sub-clause (a) above
including –
- 25 Explanation :(1) The electricity required to be
consumed by captive users shall be
determined with reference to such
generating unit or units in aggregate
identified for captive use and not with
reference to generating station as a
whole; and
(2) the equity shares to be held by
the captive user(s) in the generating
station shall not be less than twenty
six per cent of the proportionate of
the equity of the company related to
the generating unit or units identified
as the captive generating plant.
Illustration: In a generating station with
two units of 50 MW each namely Units A
and B, one unit of 50 MW namely Unit A
may
be
identified
as
the
Captive
Generating Plant. The captive users shall
hold not less than thirteen percent of the
equity shares in the company (being the
twenty six percent proportionate to Unit
A of 50 MW) and not less than fifty one
percent of the electricity generated in
Unit A determined on an annual basis is
to be consumed by the captive users.
- 26 -
(2) It shall be the obligation of the captive
users to ensure that the consumption by
the Captive Users at the percentages
mentioned in sub-clauses (a) and (b) of
sub-rule (1) above is maintained and in
case the minimum percentage of captive
use is not complied with in any year, the
entire
electricity
generated
shall
be
treated as if it is a supply of electricity by
a generating company.
(3) The captive status of such generating
plants, where captive generating plant
and its captive user(s) are located in
more than one state, shall be verified by
the Central Electricity Authority as per
the procedure issued by the Authority
with
the
approval
of
the
Central
Government.
Explanation.(1) For the purpose of this rule.a. “Annual Basis” shall be determined
based on a financial year;
b. “Captive User” shall mean the end
user of the electricity generated in a
Captive Generating Plant and the term
- 27 “Captive
Use”
shall
be
construed
accordingly;
Provided
that
the
consumption
of
electricity by the captive user may be
either
directly
or
through
Energy
Storage System:
Provided further that the consumption
by a subsidiary company as defined in
clause
(87)
of
Section
of
the
Companies Act, 2013 (18 of 2013) or
the holding company as defined in
clause
(46)
of
Section
of
the
Companies Act, 2013 (18 of 2013), of
a company which is a captive use,
shall also be admissible as captive
consumption by captive user;
c.
“Ownership”
in
relation
to
a
generating station or power plant set
up by a company or any other body
corporate shall mean the equity share
capital with voting rights. In other
cases
ownership
shall
mean
proprietary interest and control over
the generating station or power plant;
- 28 d.
“Special
Purpose
Vehicle”
shall
mean a legal entity owning, operating
and maintaining a generating station
and with no other business or activity
to be engaged in by the legal entity.”
33.
amended
Rule 3 of the Rules, 2005 has been inter alia
by
the
Central
Government
in
2023.
The
generating plant has to be established in accordance with
Section 2(8) and has to fulfill the conditions under Rule 3 of
the Rules, 2005 with respect to share holding pattern and
consumption pattern in order to be qualified as a captive
generator
users.
(Verification
of
The
KERC
Captive
published
Status
of
the
draft
Generating
KERC
Plants/
Consumers in the State of Karnataka), Regulations 2023
(‘draft Regulations, 2023’ for short), under Section 181 of
the Act, 2003. Subsequent to the publication of the draft
Regulations 2023, the Apex Court, in the case of Dakshin
Gujarat, interpreted Rule 3 of the Rules, 2005 and laid down
the eligibility criteria for captive plants and captive users to
claim captive status under the Act, 2003.
- 29 -
34.
The Apex Court at paragraph Nos.43 and 44 has
held as under:
“43. The last portion of the second proviso to
Rule 3(1)(a) of the Rules, that is, the proportionality
principle, specifies an unitary qualifying ratio. The
unitary
qualifying
requirement
ratio
divided
is
by
the
consumption
the
shareholding
requirement, that is, 51% divided by 26%. This
means that the owner of every 1% shareholding of
the CGP should have minimum consumption of
1.96% of the electricity generated by the CGP, with
a variation of ±10% being permissible. Therefore,
the unitary qualifying ratio has to be within a range
of 1.764% to 2.156%. In other words, we do not
take into consideration 100% of the electricity
generated.
Instead,
we
apply
the
shareholding
requirement, which should not be less than 26% in
aggregate, to the electricity consumed, which should
not be less than 51%, and thereby compute whether
the
ownership
criteria
and
the
proportionate
consumption criteria is satisfied. Benefit of variation
by 10% either way is to be a given.
44. For clarity, the illustrations provided Mr.
M.G.
Ramachandran,
reproduced below:
Senior
Advocate,
are
- 30 -
Total Generation
100%
Consumption Requirement (Not less
than)
51%
Shareholding Requirement (Not less
than)
26%
Shareholder
Unitary Qualifying Ratio is Consumption
Requirement divided by Shareholding
Requirement (with a variation of 10%) i.e.
51% divided by 26% which equals to 1.96%
consumption by a captive user for every 1%
shareholding
Actual
Actual
Unitary
Consumption Shareholding Ratio
Achieved
Remarks
Result
Illustration 1
A
10.2
1.96
B
10.2
1.96
C
10.2
1.96
D
10.2
1.96
E
10.2
1.96
Others
A, B, C, D, and E (all) consume not A
to
E
less than 1.96% for 1% shareholding qualify as
and therefore all qualify as captive captive
users. All collectively own more than users
26% shareholding.
Illustration 2
A
2.14
B
2.5
C
D
3.75
E
3.75
Others
-
A, B, C, D, and E (all) consume more A
to
E
than 1.96% for 1% shareholding and qualify as
therefore all qualify as captive users. captive
All
collectively
own
26% users
shareholding.
Illustration 3
A
B
C
D
5.75
1.92
E
1.67
A, B and C qualify the captive A
to
D
consumption qua their shareholding qualify as
in the ratio of not less than 1.96% of captive
1% shareholding. The ratio of D is not users. E is
above 1.96, yet it qualifies on account not
a
of
its ratio being within the captive
permissible limit of 10% variation. E user.
does
not
qualify
as
unitary
consumption is 1.67% only, i.e. less
- 31 Others
9.25
-
than 1.96% per 1% shareholding and
the same does not fall within 10%
variation.
Excluding
E,
the
shareholding held by A, B, C and D is
33% i.e. not less than 26%. Hence A,
B, C and D qualify as Captive users.
The disqualification of E will not affect
A, B, D and D as they cumulatively
consume more than 51% and hold
33% i.e. not less than 26%.
Illustration 4
A
4.17
B
C
D
E
Others
-
A, B, C and D qualify the captive No
one
consumption qua their shareholding qualifies
in the ratio of not less than 1.96% for as captive
1% shareholding. E does not qualify user
as unitary consumption is 1% only,
i.e. less than 1.96% per 1%
shareholding.
Excluding
E,
the
shareholding held by A, B, C and D
however
is
only
21%.
Since
cumulatively A, B, C, and D do not
hold not less than 26%, by virtue of
Rule 3(2) of Electricity Rules, 2005,
they cannot claim captive user status.
Illustration 5
A
B
0.84
Others
-
Neither of A or B qualify as captive No
one
user even though they collectively qualifies
satisfy the requirements of minimum as captive
shareholding of not less than 26% user
and minimum consumption of not less
than 51%. B does not qualify as
unitary consumption is less than
1.95% and not within the 10%
variation. A or B independently do not
satisfy
the
shareholding
and
consumption requirements. By virtue
of Rule 3(2) of Electricity Rules, 2005,
they cannot claim captive user status
Once the above standard is met and satisfied, the
person satisfying the requirement will be treated as
a member of the group captive users.”
Emphasis supplied
- 32 -
35.
The Apex Court considered the second proviso to
Rule 3 (1)(a) of the Rules, 2005 relating to association of
persons/group
captive
users
and
explained
the
proportionality requirement. The Apex Court held that Rule 3
prescribes:
i.
Minimum 26% ownership and
ii.
Minimum 51% captive consumption.
36.
The Apex Court, further observed that if the
proportionality principle has to be examined with reference
to the qualifying requirement under Rule 3 and not with
reference to 100% of total electricity generated. The Apex
Court recognized “UQR” as 51% ÷ 26%=1.96%, meaning
thereby
for
every
1%
ownership,
there
should
be
corresponding qualifying captive consumption of 1.96%
subject to permissible variation of ± 10%.
- 33 -
37. The Apex Court, further clarified that:
a.
The
benchmark
for
proportionality
is
qualifying captive consumption requirement
under Rule 3.
b.
And not total actual generation or total
actual consumption.
38.
By the impugned order, the KERC provides at
Clause 6.7 as under:
“6.7 Test of proportionality for Group Captive User
[As per 2nd provisio of clause (a) (ii) of sub-rule (1)
of Rule 3 of Electricity Rules, 2005]:
(i) The test of proportional consumption in case of
the Group Captive Users except Cooperative
Society, shall be on actual energy consumption
by Captive Users, determined on an annual
basis and in proportion to the shares in
ownership of the power plant within a variation
not
exceeding
calculate
the
ten
percent.
In
proportionate
order
to
energy
consumption requirement of Captive Users a
term called Unitary Qualifying Ratio (UQR) is
- 34 used, which is the ratio of percentage of total
consumption by Captive Users (Y) and the
percentage of total ownership of Captive Users
in the CGP (X). Thus, UQR=Y/X
(ii) The proportional consumption requirement by
a Captive User in a CGP, except the Cooperative Society, shall be calculated on the
basis of following formula:
Proportionate consumption of a Captive
User = UQR * Percentage ownership of that
Captive User.
Variation of ± 10 % in the Proportionate
consumption of a Captive User is allowed. This
formula is applicable for all Group Captive
Users, except Co-operative Society
An illustration, in this regard, is provided at
Annexure II.
(iii) In case of the change in shareholding during
the year under consideration, the weighted
average
shareholding
calculation
of
shall
proportional
be
used
for
consumption
requirement. Two illustrations, in this regard,
are provided at Annexure III.”
- 35 -
39.
Under Clause 6.7, KERC provides the formula
UQR=Y ÷ X, where;
a.
“Y”
is
equal
to
percentage
of
total
consumption by captive users.
b.
“X” is equal to percentage of total ownership
of captive users in the CGP.
40.
Thus, under the impugned procedure:
i.
Proportionality is determined with reference
to total actual captive consumption and total
ownership.
ii.
And not with reference to the qualifying
threshold of 51% captive consumption as
recognized
in
paragraph
No.43
of
the
Dakshin Gujarat.
41.
According to the petitioners, paragraph No.43 of
the Dakshin Gujarat’s judgment recognizes a UQR derived
from 51% ÷ 26%=1.96%, and the Apex Court specifically
- 36 -
rejected taking 100% generation or total consumption as a
benchmark and that the KERC under Clause 6.7 applies
proportionality to:
a.
Total actual captive consumption and
b.
Total ownership.
Thereby, introducing a fluctuating or dynamic “UQR” and
therefore, it is contended that the KERC has substituted the
statutory qualifying ratio recognized by the Apex Court with
an entirely different methodology, and thereby rewriting Rule
3 through a procedural order.
42.
According to the petitioners, once the Rule 3 and
paragraph
No.43
of
the
prescribe
proportionality
Dakshin
with
Gujarat’s
reference
to
judgment
qualifying
consumption, KERC could not have introduced a new formula
based on total actual consumption and that the Clause 6.7 of
the impugned order is directly contrary to the law declared
by the Apex Court.
- 37 -
43.
The KERC, however, contends that the petitioners
are selectively reading paragraph No.43 without considering
the entire judgment, particularly paragraph Nos.45 to 47.
Paragraph Nos.45 to 47 of the Dakshin Gujarat reads as
under:
“45. The aforesaid interpretation checks, “gaming”,
by owners, which would amount to misuse and
abuse of the Rule 3(1)(a) of the Rules. Instances of
gaming
are
where
a
1%
or
an
insignificant
shareholder of the CGP disproportionately uses the
electricity generated, in which case he should not be
treated as a group captive user and, therefore,
should be denied the benefits that are given under
the Act to the captive users. Gaming or misuse
should be checked to protect interests of the
Distribution Licensee.
46. This brings us to the question of applicability of
the second proviso of Rule 3(1)(a) in cases where
there is a change in ownership or shareholding of the
CGP. An issue arises with respect to calculation of
proportional
consumption
of
electricity
under
the second proviso to Rule 3(1)(a) of the Rules when
an
existing
captive
user
exits/transfers
their
shareholding/ownership to a new captive user. It
- 38 may
happen
in
multiple
situations. The
APTEL
in Tamil Nadu Power had postulated that such issue
would be resolved if the minimum consumption and
shareholding requirements are verified only at the
end of the financial year. However, we have held
that the minimum consumption and shareholding
requirement
are
required
to
be
maintained
continuously and not just at the end of the year. It is
only with respect to determining the ownership
proportionate to consumption of electricity that
requires
our
attention,
with
respect
to
the
second proviso to Rule 3(1)(a) of the Rules.
47. In case of change of ownership, shareholding, or
consumption, the principle of weighted average
should be applied to ensure compliance of the
proportional
electricity
consumption
requirement
stipulated under the second proviso to Rule 3(1)(a).
For instance, if a captive consumer exits or drops out
in
the
middle
of
the
year,
transferring
its
shareholding to another or new captive user, it would
be fair to hold that the captive user who has become
a shareholder in the middle of the year, is required
to
consume
proportionately
to
the
electricity
generated. In a given case, existing captive users
taking advantage of the variation, may enhance their
consumption. The concept of weighted average
shareholding comes in aid to calculate the relevant
- 39 average shareholding of the captive user in the year
and the proportionate electricity required to be
consumed by him. To borrow from the illustrations
provided by learned Senior Advocate Mr. Basava
Prabhu Patil, appearing on behalf of Tata Power
Company Limited, this comes in aid in instances
where the shareholding of a captive user in a CGP
fluctuates, provided that the minimum ownership
requirement of 26% in aggregate is not being
breached. Further, a shareholder may hold 30% of
shares of the CGP for 3 months, 40% of shares for 4
months, and 50% of the shares for the balance 12
months. The weighted average shareholding method
is applied by taking average shareholding held by
particular shareholder for the year for the purpose of
calculating proportionate electricity required to be
consumed by it in terms of the second proviso of
Rule 3(1)(a).”
44.
According to KERC, 1.96% is only illustrative and
contends that 1.96% is not a rigid universal formula and it
merely illustrates the statutory relationship between 51%
and 26% and that Clause 6.7 of the impugned order merely
operationalises
the
proportionality
requirement
embedded
Rule
not
in
and
does
create
already
any
new
- 40 -
substantive conditions. The KERC strongly relies upon the
Apex Court's observation regarding “gaming” by insignificant
shareholders and contends that if unless actual consumption
is proportionally linked to ownership, captive users may
misuse surcharge exemption benefits. Therefore, the core
issue for determination is “whether paragraph No.43 of the
Dakshin Gujarat’s judgment limits proportionality only to
qualifying consumption requirement under Rule 3?” or
“whether,
the
judgment
read
as
a
whole
permits
proportionality verification with reference to total actual
captive consumption as prescribed under Clause 6.7 of the
impugned KERC order?”
45.
A careful reading of the judgment of the Apex
Court in Dakshin Gujarat, particularly the above referred
paragraphs, would indicate that the Apex Court interpreted
Rule 3 of Rules, 2005 in the context of:
i.
Minimum qualifying ownership of 26%.
ii.
Minimum qualifying captive consumption of 51%.
- 41 -
iii.
Proportionality
consumption
in
between
ownership
association
of
and
persons/group
captive structures.
iv.
Prevention of misuse or “gaming”, by insignificant
shareholders.
46.
The Apex Court observed that a fix, constant
baseline of “UQR” by deriving the figure 51% ÷ 26% =
1.96%. The Apex Court observed that for every 1%
ownership there shall be a corresponding qualifying captive
consumption of 1.96% variation of ± 10%. The illustrations
contained in paragraph No.44 of the judgment and the
subsequent observation explain the working methodology of
proportionality principle with reference to the qualifying
requirement under Rule 3. The petitioners contend that the
Apex
Court
thereby
confirmed
proportionality
only
to
qualifying captive consumption requirement of 51% and not
to total actual consumption. According to the petitioners,
once Rule 3 of Rules 2005 prescribes only minimum
- 42 -
qualification thresholds and the Apex Court, itself used
qualifying benchmark of 51% ÷ 26%, KERC, could not have
substituted the same by introducing a fluctuating or dynamic
UQR based on “total actual captive consumption”. It is further
contended that the impugned KERC order, which prescribes
UQR as “Y ÷ X,” is contrary to the law laid down by the Apex
Court, since under the illustration adopted by KERC, the UQR
itself
fluctuates
depending
upon
the
total
actual
consumption. According to the petitioners, this approach
departs from paragraph of the Apex Court judgment.
47.
The illustrations referred in paragraph Nos.43 and
44 indicate that the Apex Court examined proportionality
with reference to qualifying captive consumption requirement
under Rule 3 and not with reference to total actual
consumption and Clause 6.7 of the impugned order departs
from the above methodology and recalculates the UQR
dynamically on the basis of total actual captive consumption
and total ownership. Rule 3 nor paragraph No.43 of the
Dakshin Gujarat’s judgment, expressly contemplates such
- 43 -
fluctuating or dynamic UQR, the Rule prescribed qualifying
thresholds, and the Apex Court explained proportionality with
reference to those qualifying thresholds. Though the KERC
seeks to justify the impugned methodology by relying upon
the anti-gaming observations contained in paragraph Nos.45
to 47 of Dakshin Gujarat’s judgment, such observations
cannot be read in isolation so as to substitute the qualifying
ratio expressly explained by the Apex Court in paragraph
No.43. The illustration furnished in the impugned order
substantially alters the basis of proportionality by treating
total actual captive consumption as the benchmark. This
results in introduction of a new verification mechanism not
expressly found either in Rule 3 or in judgment of the Apex
Court.
48.
Further,
the
KERC
had
earlier
issued
draft
regulation during 2023 and revised draft regulation during
2024 inviting stakeholder objections. However, the impugned
order introducing a materially different methodology cannot
be
issued
without
fresh
consultation
or
hearing
the
- 44 -
petitioners. Thus, cannot be non-suited solely on the ground
of an alternative remedy, particularly, when the challenge is
to the jurisdiction and legality of the impugned framework
itself.
49.
The contention of the KERC that the impugned
order is merely procedural and also cannot be accepted in its
entirety, since
methodology
prescribed directly
impacts
determination of captive status and consequent liability
towards cross subsidy surcharge and additional surcharge.
Accordingly,
the
points
framed
for
consideration
are
answered and this Court is of the considered view that the
impugned order introduces a dynamic “UQR” based on actual
captive consumption contrary to the qualifying benchmark
explained in paragraph No.43 of the Dakshin Gujarat’s
judgment and the same cannot be sustained and this Court
pass the following:
ORDER
i.
The writ petitions are allowed.
- 45 -
ii.
The
impugned
Order
dated
28.03.2025
(Annexure-A) passed by the KERC is hereby
quashed.
iii.
The KERC to reconsider the matter and frame an
appropriate procedure consistent with Rule 3 of
the Electricity Rules, 2005 and law declared by
the Apex Court in Dakshin Gujarat’s judgment,
after following the due consultative process and
principles of natural justice.
iv.
Till such consideration, no coercive action shall be
taken against the petitioners.
Pending IAs, if any, would not survive for consideration.
Sd/______________________
JUSTICE K.S. HEMALEKHA
AT
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review