Sr. No. .
HIGH COURT OF JAMMU & KASHMIR AND LADAKH
AT SRINAGAR
Reserved on:
24.12.2025
Pronounced on: 11.02.2026.2025
Uploaded on:11.02.20261.10.2025
WP(C) No. 590/2023
Whether the operative part or full
judgment is pronounced-Full Judgment
.....Petitioner
Hotel New Metro
Through :- Mr. Jahangir Iqbal Ganai, Sr. Advocate
with
Mr. Sohail Mehraj, Advocate.
v/s
.....Respondents
UT of J&K & Ors.
Through :- Mr. Mohsin Qadri, Sr. AAG with
Mr. Illyas Laway, GA.
CORAM: HON’BLE MR. JUSTICE RAJESH SEKHRI, JUDGE
JUDGMENT
01.
Petitioner has invoked writ jurisdiction of this Court for the issuance of
appropriate writs to the respondents for the clearance of their pending liability
towards hiring the petitioner Hotel for protected political persons.
CASE OF THE PETITIONER
02.
Case of the petitioner is that pursuant to a circular dated 07.11.2020 and
communication dated 12.12.2020 and various communications issued thereafter
from time to time by Divisional Commissioner, Kashmir, it was requested to
provide accommodation, on sharing basis, to protected persons including
Panches, Sarpanches, Municipal Councillors etc., and police personnels/security
forces w.e.f. 18.11.2020. Subsequently, the accommodation came to be de-hired
by the Divisional Commissioner w.e.f. 05.10.2021, in terms of his order dated
01.10.2021. However, immediately after de-hiring at the Divisional Level, a
fresh requisition was made at the District Level by respondent no. 2-Deputy
Commissioner, Srinagar, vide his communication dated 27.10.2021, by virtue of
which four Hotels, including the Hotel in question, came to be re-hired for
accommodating protected persons of District Srinagar including Sarpanches,
Councilors, DDC Members, contesting candidates etc. The petitioner raised
bills, for the periods Hotel premises came to be hired, first at the Divisional
level and later at the District level, however, grievance of the petitioner is that
its payment is not being cleared despite the fact that hiring charges were verified
and approved by the competent authorities and funds released by the
Government.
03.
It is further contended that when representative of the Hotel approached
the office of Divisional Commissioner, he was informed that based on an exparte report of a Committee, amounts of Rs. 51,756/- and Rs. 37,980/- had been
approved for payment on account of boarding and lodging charges w.e.f.
06.10.2021 to 31.05.2022.
04.
According to the petitioner, the accommodation provided to the
protectees at the behest of the Divisional Commissioner, and respondent no. 2Deputy Commissioner, was being guarded by J&K Police/security forces round
the clock and two rooms remained under their continuous occupation for the
entire hiring period. According to the petitioner, after the Hotel rooms came to
be allocated and provided to the protectees, on the strength of hiring orders
issued by competent authorities of the respondents, it is not open for them to
rely on an ex parte report of a committee, constituted much after the Hotel came
to be de-hired and contend that rooms were not in actual occupation of the
WP(C) No. 590/2023
protectees. It is contention of the petitioner that bill verification committee was
constituted by the respondents with a view to defeat its legitimate claim.
05.
The petitioner for the protection and preservation of its right to hold, the
property in the manner provided under law, has invoked writ jurisdiction of this
Court, primarily on the ground that bill verification committee constituted by
Financial Commissioner (Additional Chief Secretary), Home was a colorable
exercise of power with a view to reduce its liability, and that ex parte report of
the committee, is violative of principles of natural justice.
06.
Petitioner has prayed for the issuance of
appropriate writs for the
quashment of order dated 05.11.2022, by virtue of which Bill Verification
Committee came to be constituted, quashment of report dated 10.02.2023 of the
said Committee, and a mandamus to the respondents to clear its pending
liability.
COUNTER
07.
Per contra, respondents though admitted that pursuant to the directions of
the Divisional Commissioner, vide No. 361-Div.Com/Estt.
of 2021 dated
01.10.2021, respondent no. 2, vide his order dated 27.10.2021, hired the
petitioner Hotel, for providing accommodation to political protectees and that it
came to be de-hired w.e.f. 01.06.2022, but controverted inflated claim of the
petitioner.
08.
It is contention of the respondents that for the corresponding period, the
petitioner submitted bills to the tune of Rs. 40,74,665/- at the rates of Rs. 356
(boarding) and Rs. 242 (catering) respectively. Bills were submitted to the
committee constituted by respondent no. 2 under the chairmanship of SDM
(East) vide order dated 05.11.2022, read with order dated 18.01.2023, pursuant
to the directions issued by Financial Commissioner (Addl. Chief Secretary),
WP(C) No. 590/2023
Home Department, J&K for verification of bills of the hoteliers qua the rentals
etc. submitted by various hotels hired for protected persons w.e.f. 05.10.2021.
The Committee submitted its report vide letter dated 02.02.2023 and it was
submitted to the Divisional Commissioner, vide letter dated 10.02.2023. It is
contention of the respondents that bills raised by the petitioner were passed for
an amount of Rs. 89,736/-, as per actual occupancy, those were duly
authenticated by the committee headed by SDM (East), endorsed by Accounts
Officer with the Deputy Commissioner and released in favour of the petitioner
through Additional Treasury Tankipora vide Treasury No. 1 dated 27.03.2023.
Therefore, according to the respondents, liability towards the petitioner stands
cleared in totality.
09.
Respondents are affront with the contention that bills raised by the
petitioner are not only exaggerated figures but far-fetched from reality. Liability
was examined by the committee constituted for the purpose, who recommended
payment of Rs. 89,736/-, for the period w.e.f. 05.10.2021 to 31.08.2022 on the
analogy adopted in similarly circumstanced hoteliers, hired for similar purpose,
as per approved rates of the Estate Department and this amount came to be
credited to the petitioner by the office of the Deputy Commissioner, Srinagar.
Respondents have prayed for dismissal of the writ petition.
SUPPLEMENTARY AFFIDAVIT
10.
The petitioner filed supplementary affidavit to controvert stand of the
respondents by contending that since protected persons had already occupied the
Hotel, it was for this reason that effect of formal allotment was given
retrospective effect, i.e., w.e.f. 15.11.2020. Rates were fixed by the Divisional
Commissioner, @ Rs. 356 per day, per room (room rent) and catering @ Rs.
225 per head, per day, during the summer season and Rs. 242 per day, per room
WP(C) No. 590/2023
(room rent) and catering @ 216 per head, per day, during winter season. As per
the occupation and use of Hotel premises, petitioner from time to time
submitted detailed bills indicating the number of persons occupying the
premises, the number of days rooms were occupied and the amount claimed as
per the rates fixed by the Divisional Commissioner, which were received by the
respondents against proper receipt. After bills were submitted, they were
processed by accounts section of the office of the Divisional Commissioner.
11.
It is contended that calculation was made in two parts, i.e., from
15.11.2020 to 31.03.2021 and thereafter on the basis of revised rates fixed by
the Government vide Government Order No. 178-Est of 2022 dated 18.07.2022,
in terms whereof, consequent upon approval of the competent authority,
sanction was accorded to the enhancement of rent tariff in favour of Estates
hired private hotels. The initial rates were also fixed on the analogy of the rates
fixed by the Estates Department for the private hotels hired by it.
12.
It is further contended that after bills were processed by the accounts
section of the office of Divisional Commissioner for the period w.e.f.
15.11.2020 to 31.03.2021, the amount claimed was determined as Rs.
28,70,368/- and after deducting the claim for providing rooms to the Garath
(Guard), the amount was reduced to Rs. 22,16,112/ and after further deducting
the amount on account of dual accommodation, an amount of Rs. 21,23,774/was found due. It was decided to release 80% of the rent amount and 50% of
catering charges, which came to Rs. 12,90,650/-. After deducting income tax @
10 % on rent and 2 % on catering and GST @ 2%, a net amount of Rs.
11,90,220/- was directed to be paid to the petitioner, which was duly received
by the petitioner. The balance amount, according to the petitioner, for the
aforesaid period is Rs. 8,33,124/WP(C) No. 590/2023
13.
Insofar as second part of hiring is concerned, it is contended that for the
period w.e.f. 01.04.2021 to 04.10.2021, an amount of Rs. 33,17,104/- was
claimed, which was reduced to Rs. 31,24,336/- as per the Estates rates by
excluding the amount claimed for providing rooms to the security personnel
posted in the Garath (Guard). The amount determined did not include in its
entirety the rent
claimed for the month of April 2021 amounting to Rs.
1,74,240/-. According to the petitioner, the amount determined by the accounts
office of the Divisional Commissioner further reduced an amount of Rs. 1, 47,
568/- on account of dual accommodation, and it was determined that the total
amount due to the petitioner was Rs. 29,76, 795/-. According to the petitioner,
the official record of the respondents bears testimony to the fact that an amount
of Rs. 1, 54, 397/- was due to the petitioner on account of enhancement of rent,
but same was not incorporated in the aforesaid amount. The total amount, as
such, for this period, according to the petitioner, comes to Rs. 33,05,432/(29,76,795 + 1,54,397+ 1,74,240). According to the petitioner, an amount of Rs.
10,04,407/-, was directed to be released and after deducting income tax and
GST, an amount of Rs. 9,17,393/- was released and paid to the petitioner. Thus,
according to the petitioner, out of the total rent determined amounting to Rs.
55,21,544/-, an amount of Rs. 22,95,057/- (12,90,650 + 10,04,407) has been
released and the balance amount of Rs. 31,34,159/- remains outstanding.
14.
It is further contention of the petitioner that Hotel premises came to be
de-hired in terms of communication dated 01.10.2021. w.e.f. 05.10.2021.
However, despite said communication, the Hotel continued to remain in
occupation of protected persons as issue was related to the security concern of
protected persons. On account of withdrawal of static guard, the petitioner
immediately filed a representation, whereupon it was directed that the guard
WP(C) No. 590/2023
withdrawn from Hotel premises be immediately redeployed. The petitioner has
placed on record a copy of the signal/fax message dated 17.10.2021. It is thus
contention of the petitioner that as protected persons refused to vacate Hotel
premises, a decision was taken by a duly constituted committee to re-hire the
premises of the petitioner Hotel vide order dated 27.10.2021 and therefore Hotel
rooms remained in continued occupation of protected persons up to 25.10.2022.
As per the bills submitted, the petitioner claimed an amount of Rs. 54,15,110/(including arrears) on account of occupation and use of rooms and catering, but
respondents have released only Rs. 89,736/-. The balance amount for the
aforesaid period, according to the petitioner, of Rs. 53,25,374/- has been
illegally withheld. The total balance amount, therefore, according to the
petitioner is Rs. 84,59,523/- (Rs. 8,33,124+Rs. 23,01,025+Rs. 53,25,374).
15.
According to the petitioner, after the occupation of Hotel in question by
the protected persons and deployment of static guard, petitioner had no direct
control over the Hotel premises nor could it put the premises to any other use
and even keys of the rooms, according to the petitioner, were in custody of the
protected persons.
RESPONSE TO SUPPLEMENTARY AFFIDAVIT
16.
Respondent no. 2-Deputy Commissioner, Srinagar responding to the
supplementary affidavit of the petitioner, has maintained its stand taken in the
counter affidavit that full and final liability of the Government towards
petitioner Hotel stands discharged and contended that writ petition is inter alia
based on disputed and inflated financial claims. Petitioner has not demonstrated
infringement of any fundamental or statutory right warranting interference in
writ jurisdiction. It is contended that writ proceedings cannot be invoked for
enforcement of contractual or pecuniary disputes requiring determination of
WP(C) No. 590/2023
disputed questions of fact, particularly where claims are contested, unaudited
and unverified.
17.
According to the respondents, present petition is a veiled attempt to seek
judicial enforcement of a claim which has already been rejected by a competent
fact-finding committee through a transparent and accountable process. The
claim being highly inflated and devoid of proper substantiation is an attempt at
unjust enrichment and abuse of the judicial process. Therefore, no mandamus
can be issued to enforce such a disputed and unverified liability.
18.
According to the respondents, petitioner’s prayer for quashment of the
report of verification committee and associated Government communications is
misconceived, as same merely conveys the outcome of a factual verification
process carried out to ensure fiscal discipline and rationalised Government
expenditure. It is contended that petitioner has failed to produce any evidence of
occupancy to justify its claim and that committee’s assessment is based on
actual records obtained from official sources. It is further contended that
petitioner, having accepted the payment of Rs. 89,736/- without demur, is
estopped from challenging the committee. Respondents have prayed for
dismissal of the writ petition.
19.
Heard arguments and perused the file.
20.
Learned counsels appearing on rival sides have reiterated their respective
stands in their arguments.
ANALYSIS
21.
As uncontroverted factual narration of the case, emerging from a perusal
of communication dated 12.12.2020 of Divisional Commissioner, Kashmir,
annexed with the petition, would unfold 14 Hotels, including the petitioner
Hotel came to be hired w.e.f. 18.11.2020, for protected persons, on sharing
WP(C) No. 590/2023
basis, including the security forces, who were assigned the duty of providing
round the clock security to the said protectees. Subsequently they came to be
dehired by the Divisional Commissioner w.e.f. 05.10.2021, vide his
communication dated 01.10.2021.
According to the petitioner, a fresh
requisition was made at the District Level by respondent no. 2-Deputy
Commissioner, Srinagar, vide his communication dated 27.10.2021, by virtue of
which four hotels, including the petitioner Hotel, came to be re-hired up to
31.05.2022.
22.
In view of the above, claim of the petitioner is comprised of two parts;
first, when it came to be hired at the Divisional Level w.e.f. 18.11.2020 to
05.10.2021, and second, when it came to be hired at the District level., w.e.f.
06.10.2021 to 31.05.2022.
23.
Pertinently, the petitioner, in the supplementary affidavit, maintained its
stand that since protected persons had already occupied the hotel, it was for this
reason that effect of formal allotment was given retrospective effect, i.e., w.e.f.
15.11.2020. Interestingly, though respondents have admitted that petitioner
Hotel was hired by respondent no. 2 vide his order dated 27.10.2021, pursuant
to order dated 01.10.2021 of the Divisional Commissioner, however, neither in
the objections nor in response to the supplementary affidavit they have dealt
with first claim of the petitioner w.e.f. 18.11.2020 to 05.10.2021.
24.
In terms of Order VIII Rule 3 of the Code of Civil Procedure, it is not
sufficient for a defendant in his written statement to make a general denial of the
grounds alleged by the plaintiff, he is required to specifically deal with each
allegation of fact of which he does not admit the truth and it is a settled principle
of law of pleadings that if every allegation of fact in the plaint is not denied
specifically or by necessary implication, it shall be taken to be an admission in terms
WP(C) No. 590/2023
of Rule 5 of Order VIII of the Code. Now, when law relating to admission is
examined in the light of Order XII Rule 6 CPC, I need not say anything more
than what the legislature has intended in its framework that where admission of
fact is made in the pleadings or otherwise, the Court at any stage of the
proceedings has the jurisdiction to pass such order or give such judgment as it
needs fit, having regard to such admission. It is also settled in law that such
admission includes one that can be inferred from facts and circumstances of a
case without any dispute, as held by Hon’ble Supreme Court in “Charanjit Lal
Mehra vs. Kamal Saroj Mahajan”; 2005 (11) SCC 279. It is also settled in
law that facts admitted need not be proved in terms of Section 58 of the
Evidence Act and a party’s admission is substantive evidence ex proprio vigore.
25.
In the light of afore-stated statutory and crystallized position of law,
insofar as first claim of the petitioner, is concerned that pursuant to circular
dated 07.11.2020 and communication dated 12.12.2020 issued by Divisional
Commissioner, Kashmir, its Hotel came to be hired by the respondents to
accommodate protected persons on sharing basis w.e.f. 18.11.2020 to
05.08.2021, same having not been denied by the respondents amounts to
admission and petitioner is entitled to the relief prayed for.
SECOND CLAIM
26.
Coming to the second claim, the admitted position on record is that Hotel
in question came to be hired at the District Level by respondent no. 2-Deputy
Commissioner, Srinagar, w.e.f. 05.10.2021 to 31.08.2022. Respondents have
contested this claim primarily on the ground that for the corresponding period,
bills raised by the petitioner to the tune of Rs. 40,74,665/- were submitted for
verification to the Bill Verification Committee, constituted for the purpose by
respondent no. 2, vide order dated 05.11.2022, read with order dated 18.01.2023
WP(C) No. 590/2023
under the Chairmanship of SDM (East), on the directions of Financial
Commissioner (Additional Chief Secretary), Home. The Committee vide letter
dated 02.02.2023 submitted its report, and it was submitted to the Divisional
Commissioner, vide letter dated 10.02.2023. As per actual occupancy, an
amount of Rs. 89,736/- came to be passed, which was endorsed by the Accounts
Officer with the Deputy Commissioner, and released in favour of the petitioner.
Therefore, according to the respondents, entire liability of the petitioner stands
cleared.
27.
Petitioner has taken an exception to the stand of the respondents by
contending that since protected persons had already occupied the hotel rooms, it
was precisely for this reasons that effect of formal allotment was given
retrospective effect; w.e.f., 15.11.2020. It is also contended that though
petitioner Hotel was de-hired w.e.f 05.10.2021 in terms of communication dated
01.10.2021 of the Divisional Commissioner, the hotel continued to remain in
occupation of protected persons due to security concerns. It is averred that when
static guard in the petitioner Hotel was withdrawn, petitioner filed a
representation, whereupon it was directed that guard withdrawn from the Hotel
premises be immediately re-deployed, as evident from the copy of the signal/fax
message dated 17.10.2021 placed on record. It is thus contention of the
petitioner that as protected persons refused to vacate the hotel, it came to be rehired after the decision of a duly constituted committee, and therefore, Hotel
remained in continued occupation of protected persons.
28.
The record bears testimony to the fact that accommodation provided by
the petitioner to the protectees at the Divisional or District Level was being
guarded by J&K Police (Security Forces) round the clock and two rooms
remained under continuous possession of the security forces for the entire hired
WP(C) No. 590/2023
period. After accommodation was provided by the petitioner on the strength of
various orders issued at the Divisional or District Levels from time to time,
petitioner was under an obligation to reserve the required boarding and lodging
for the allottees, identified by the respondents, for the said purpose. In the
circumstances, there is force in the contention of the petitioner that it is not open
to the respondents or their officials to contend that rooms of the petitioner Hotel
were not in actual occupation of the protectees, and that too, much after the
hotel in question came to be de-hired.
29.
Stand of the petitioner that after accommodation was provided, hotel
premises were guarded by the security forces round the clock, keys of the rooms
remained with the persons occupying the Hotel rooms, and therefore, premises
could not be put to any other use by the petitioner, is again not denied by the
respondents either in their response to the petition or to the supplementary
affidavit. Copy of the fax message placed on record by the petitioner indicates
that security guard withdrawn from the Hotel premises were immediately
directed to be re-deployed. Respondents have not disputed this fact of the case
also. It, therefore, indicates that after the occupation of the petitioner Hotel by
the persons, identified by respondents, and deployment of security framework
by the UT for the security of the protected persons, petitioner had no direct
control over the hotel premises/rooms, which were reserved for their
accommodation.
30.
The respondents constituted a committee for verification of the bills and
the Committee submitted its report vide its letter dated 02.02.2023 i.e. about
nine months after the Hotel accommodation came to be de-hired. According to
the respondents, the Committee conducted a detailed examination of the
occupancy
records,
WP(C) No. 590/2023
hiring
orders,
official
requisitions
and
related
documentation. However, it nowhere indicates that petitioner, at any point of
time, was associated with the verification of bills or was asked to produce
evidence of actual occupancy to justify its claim.
31.
There is difference between a fact-finding committee and Bill
Verification Committee. The fact-finding committee has a different job
altogether to perform. It is constituted to investigate, gather evidence and
establish the facts surrounding a specific incident. Even a fact-finding
committee would ordinarily follow the principles of natural justice. On the other
hand, the Committee constituted for the verification of bills would embark upon
verifying the authenticity, calculation and validity of bills/invoices or claims
presented by a claimant. The job of such Committee is to verify if services were
rendered, goods were delivered, calculations made are correct and claims
adheres to the policy/contractual norms or not. The claimant, in the
circumstances and for the purpose for which the Committee is constituted, is to
be accorded a right of hearing to submit explanations during the process of
verification of bills, particularly when Committee proposes or intends to reject
or reduce the claim. Principle of Audi alteram partem applies with full force if
the rejection of a bill is based on allegations of fraud or misconduct or that claim
is inflated. To ensure procedural fairness, the Committee must provide the
claimant an opportunity to produce evidence, explain the discrepancies
identified during verification and justify the claim.
32.
As stated, the premises in question came to be de-hired by the
respondents on 01.06.2022, but Committee was constituted much later on
05.11.2022, and Committee submitted its report three months thereafter on
02.02.2023. There is nothing in the stand of the respondents to indicate that
Committee has bothered to verify the record of the petitioner Hotel regarding
WP(C) No. 590/2023
actual occupancy of the persons, whose names were provided by them. As
stated, since after the Hotel in question came to be hired and re-hired by the
respondents, petitioner was obliged not only to provide accommodation to the
protected political persons but also reserve the accommodation for the
protectees, those were being guarded round the clock by the security forces,
there is force in the contention of the respondents that after this arrangement,
petitioner was not able to put the Hotel for any other use. The Bill Verification
Committee has not verified that whether said accommodation was provided by
the petitioner to anybody else during the period, the premises were hired by the
respondents at the Divisional or District level. Under these circumstances, it is
not open to the respondents, at this length of time, to dispute the claim of the
petitioner.
33.
For what has been observed and discussed above, present petition is
allowed and order dated 05.11.2022, by virtue of which respondents constituted
a Committee for verification of Bills and ex-parte report dated 10.02.2023 of the
said Committee are quashed. Respondents are directed to liquidate claims of the
petitioner within a period of eight weeks from the date a copy of this judgment
is made available, failing which they shall be liable to pay interest @ 6% per
annum.
34.
Disposed of.
(Rajesh Sekhri)
Judge
JAMMU
11.02.2026
Abinash
Whether the judgment is speaking? Yes
Whether the judgment is reportable? Yes
WP(C) No. 590/2023
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review