C/FA/4441/2009
JUDGMENT DATED: 03/04/2024
IN THE HIGH COURT OF GUJARAT AT AHMEDABAD
R/FIRST APPEAL NO. 4441 of 2009
FOR APPROVAL AND SIGNATURE:
HONOURABLE MR. JUSTICE DEVAN M. DESAI SD/================================================================
Whether Reporters of Local Papers may be allowed
to see the judgment ?
NO
To be referred to the Reporter or not ?
YES
Whether their Lordships wish to see the fair copy
of the judgment ?
NO
Whether this case involves a substantial question
of law as to the interpretation of the Constitution
of India or any order made thereunder ?
NO
================================================================
GUJARAT ELECTRICITY BOARD (NOW PASHCHIML GUJARAT VIJ CO. &
ORS.
Versus
INDRASINH NATUBHA JADEJA
================================================================
Appearance:
MS LILU K BHAYA(1705) for the Appellant(s) No. 1,2,3
ADVOCATE NOTICE SERVED for the Defendant(s) No. 1
================================================================
CORAM:HONOURABLE MR. JUSTICE DEVAN M. DESAI
Date : 03/04/2024
ORAL JUDGMENT
1.
The present First Appeal is filed by the appellant
under Section 96 of the Code of Civil Procedure, 1908
(for short, hereinafter referred to as `the Code’).
Being aggrieved by the judgment and decree dated
18.4.2009 passed by the learned Principle Senior
C/FA/4441/2009
JUDGMENT DATED: 03/04/2024
Civil Judge, Jamnagar in Special Civil Suit No.74 of
2004 and directing the appellant – original defendant
to
pay
to
the
respondent
original
plaintiff
Rs.15,21,800/- with running interest at the rate of
7.5% per annum from 27.4.2004 till realization.
2.
Heard learned advocate Ms. Lilu Bhaya for the
defendant
-
appellant.
Though
served,
none
appeared for the respondent/s – original plaintiffs.
3.
The brief facts of the case are as under:
4.
The plaintiff has filed a suit for the recovery of
Rs.15,21,800/- with running interest @ 7.5% p.a.
from 27.4.2004 till realisation against defendants.
The plaintiff is running a hotel in the name of `Hotel
Arjun’ at Moti Khavdi, Village Sikka Taluka Jamnagar
and having a Customer No.82102–00725-1 of GEB.
The electric meter was installed on 19/1/1999, form
C/FA/4441/2009
JUDGMENT DATED: 03/04/2024
No.15 was filled up and at that time, the terminal
block was burned. A checking squad from Mehsana
Division of the appellants visited the Hotel premises
of respondents on 27/6/2003 and carried out the
checking. It was found that the meter which was
installed at the plaintiff’s Hotel was running 36.48%
slow. The said meter was sent on for laboratory
testing. It was found that the PT link of wire and
pressure coil of the meter were found tampered with
on the upper portion of the screws instead of lower
portion of the screws and PT wire was found broken
near the link. It was reported that it was a case of
theft of electricity, resultantly supplementary bill of
Rs.52,91,728=24 Paisa was issued to the present
respondent.
The
said
supplementary
bill
was
challenged before the Appellate Committee of the
appellant. The Appellate Committee revised the
supplementary bill and a revised supplementary bill
for an amount of Rs.13,40,391=23 Paisa was raised
against which the respondent filed a Special Civil Suit
C/FA/4441/2009
JUDGMENT DATED: 03/04/2024
for cancellation of the said supplementary bill.
Pending suit, pursuant to the application for reconnection of the Electric Supply vide Exh.14, the
order to restore the connection, on a condition to
deposit the entire amount of revised supplementary
bill was passed. Plaintiff deposited an amount of
Rs.15,21,800/- with the appellant and the Electric
Supply was restored.
5.
The appellant appeared and filed Written Statement
vide Exh.10 and contended that at the time of
checking of installation as well as at the time of
checking of the meter in laboratory, the position of
burnt terminal block was not found and meter seals
were found to be tampered with. It was also found
that the pressure coil was also tampered with. As the
meter was tampered with, supplementary Bill was
issued. It was also found at the time of checking by
the Squad on 27.6.2003 that illegal load of Electricity
was found of 111.66 HP and it was also found that
C/FA/4441/2009
JUDGMENT DATED: 03/04/2024
the meter was running 36.48% slow seal wires were
replaced and seals were sticked by adhesive object.
Body seals were tampered with and seals
were
found duplicate. Even the terminal block was found
tampered with by way of touching screw.
6.
Issues were framed at Exh.23 which are reproduced
hereunder:
(i)
Whether the plaintiff proves that the
terminal block was in burned position and
defective right from the beginning at the
time of installation of meter by the
defendant ?
(ii) Whether the plaintiff proves that the
Supplementary suit bill is against the Rules,
Arbitrary and Illegal ?
(iii) Whether the defendants prove that
the factum of burned position of terminal
block has no connection with theft of
electricity ?
(iv) Whether defendants prove that the
Court has no jurisdiction to entertain this
suit against the order of the Appellate
Authority of GEB ?
C/FA/4441/2009
JUDGMENT DATED: 03/04/2024
(v) Whether the plaintiff proves that he is
entitled to get refund of Rs.15,21,800/which is deposited by him on dated
27.4.2004 from the defendants ?
(vi) Whether the plaintiff is entitled to
recover Rs.15,21,800/- with interest from
the defendants ? If yes, what rate of
interest ?
(vii) What order and decree ?”
7.
Plaintiff has examined himself at Exh.24 and has also
produced documentary evidences vide Exhs.26 to
37.
8.
On behalf of defendant, witness Pratapbhai Babaldas
Chaudhary has been
examined at Exh.46 and
another witness namely; Daulatsinh
Dhansinh was
also examined at Exh.51.
9.
Learned advocate Ms.Lilu Bhaya for the appellant
submitted that the checking was carried out in the
premises of respondent’s Hotel Arjun in the presence
C/FA/4441/2009
JUDGMENT DATED: 03/04/2024
of respondent. It was found that the seals were
tampered with. The metal meter box seal No.MMB.2C-945594 was fixed with some adhesive material and
resealing was done. The seal wire was found to be
duplicate. Meter bodies seal wires were changed and
seals were resealed. The Terminal block was having
touching with this screw and there were marks of
sparks. All these irregularities were sufficient to
prove theft of electricity. The meter was removed
and sent to laboratory in presence of the respondent
and
representatives
of
the
respondent.
The
irregularities found at the time of checking were
mentioned in the checking sheet. The checking sheet
dated
27/6/2003
representative
of
was
counter
signed
the
respondent.
It
is
by
the
further
submitted that the meter was checked in the
laboratory
on
19/9/2003
in
presence
of
the
respondent, it was found that hooks of main parts of
all seats were pressed and seal wire was of ordinary
steel. The plastic seals were found to be refixed with
C/FA/4441/2009
JUDGMENT DATED: 03/04/2024
some adhesive material. On opening the meter, it
was seen that “R” phase PT wire was broken near the
link and “Y” and “B” phase PT wires were fitted on
the screws instead of below the screw. Tampering
with pressure coil of the meter was clear. Thereafter,
the respondent was booked for the theft of electricity
and supplementary bill was issued. FIR was also
lodged
against
the
respondent.
Against
the
supplementary bill of Rs.13,40,392/-, the respondent
approached Appellate Committee by way of an
appeal. The Appellate Committee considered the
contentions
of
respondent
and
the
Appellate
Committee came to the conclusion that there was
sufficient and reliable evidence to establish that
there was a tampering with the Metal Meter Box
(MMB) seals.
10. Vide
order
dated
24/12/2003
the
Appellate
Committee came to the conclusion that the theft was
committed by the respondent and give benefit in the
C/FA/4441/2009
JUDGMENT DATED: 03/04/2024
duration factor and reduce the bill. The learned Trial
Court has committed an error in interpreting the
documents on record and evidence adduced by the
Officers of appellant. Despite the finding of fact by
the
Appellate
Committee
regarding
theft
of
electricity, learned Trial Court has committed an
error of interpreting a fact that MMB and terminal
block are two separate things / instrument / objects.
The learned Trial Court has erred in not believing the
case of theft of electricity. The decision of the
Appellate Committee on fact of theft of electricity has
attained finality.
11. The learned Trial Court has committed an error in not
properly appreciating the oral evidence of Pratapbhai
Chaudhary, Deputy Engineer - Exh.46 the said
witness, who conducted the checking on 27/6/2003,
stated that in the checking sheet, there is a
reference of tampering with the seals and Seal wires
being duplicate.
C/FA/4441/2009
JUDGMENT DATED: 03/04/2024
12. The learned Trial Court has also failed to appreciate
the oral evidence of Shri Daulat Singh Exh.51, who
was working as a Junior Engineer in the meter testing
laboratory and has conducted the meter testing. He
has
explained in detail the conditions of seals,
duplicate seal wire and tampering with pressure coils
of meter. He also stated that terminal block was not
found burnt at the time of checking of meter in the
laboratory. It is submitted by learned advocate for
the appellant that looking to the modus operandi of
theft, it has no relevance with the terminal block
which was found burnt. There was tampering with
MMB seals and Meter Body Seals and tampering with
the pressure coils of meter. It is submitted that the
Terminal Block is separate from the metal meter box.
It is further submitted that the finding that the meter
was defective and it was in burnt position is contrary
to record. It is not the case of defendants that the
metal meter box was burnt.
C/FA/4441/2009
JUDGMENT DATED: 03/04/2024
13. It is further submitted that theft of electricity has
been proved beyond any doubts before the Appellate
Committee and the finding of fact on theft of
electricity has been derived at by the Appellate
Committee. The learned trial Court has committed an
error in observing that the meter was defective.
14. Before the Appellate Committee of the appellant, it
was not the case of respondent that the Metal Meter
Box was defective.
15. The learned advocate for the appellant has relied
upon a decision of the Honorable Apex Court in the
case of Madhya Pradesh Electricity Board v.
Smt.
Basantbai
reported
in
AIR
(1)
Supreme Court Cases, 23 wherein, Supreme Court
has held at only in the case of slowness of meter
electrical Inspector will have jurisdiction but not in
C/FA/4441/2009
JUDGMENT DATED: 03/04/2024
the case where there is a fraud of tampering has
been done by the party with the meter.
16. I have considered the submissions and the Record
and
Proceedings
of
the
case.
The
electrical
installation of the respondent was checked on
27/6/2003 by the Deputy Engineer In-charge Squad,
Mehsana in presence of representatives of the
correspondent. The total load was found at 211.66
HP against the contract load of 100 HP. During the
checking, the seal wire of MMB was found changed
and the MMB seal was found resealed with substance
like adhesive and all the four meter body seals were
found tampered with. The meter was tested on Accue
check and it was found that the same was running
slow by 36.48%. It was also found that the screws of
terminal block were tampered with and there were
some signs of Sparks. The checking authority came
to the conclusion that the respondent had abstracted
electric energy by tampering with MMB seal, meter
C/FA/4441/2009
JUDGMENT DATED: 03/04/2024
body seals and meter mechanism. The electric
connection of the respondent was disconnected on
27/6/2003. The MMB seal and meter were inspected
in the laboratory on 19/9/2003 in presence of the
representatives of the respondent and irregularities
were found during that process.
17. The laboratory Report reveals that PT links of 'Y' and
'B' phase were found fitted on the upper portion of
the screws instead of lower portion of the screws and
R phase PT wire was found broken near link.
18. Thereafter, the respondent was booked for the theft
of
electrical
energy
Rs.52,91,728=24
and
Paisa
supplementary
was
issued
bill
to
of
the
respondent. The respondent challenged the said bill
before the Appellate Committee and the State
Committee
revised
the
bill
to
the
Rs.13,40,391-23 Paisa on 30th January 2004.
tune
of
C/FA/4441/2009
JUDGMENT DATED: 03/04/2024
19. The case of respondent right from the beginning is
that when the meter was installed the Terminal block
was in a burnt condition. The said fact is undisputed
on record. It seems that the respondent is trying to
mix up terminal block with MMB seal and meter body
seals. It is clear that the terminal block and the MMB
seals and Meter Body Seals are two different parts.
The respondent has harped upon the fact that
terminal block was in a burnt condition at the time of
installation and resultantly meter was a defective
one since inception. But respondent has not been
able to point out any material that burnt terminal
block has direct nexus with MMB seal and Meter
Body. As observed earlier, terminal block and MMB
seal and Meter Body are different parts. The learned
trial Judge was misdirected on this factual aspect and
come
to
a
wrong
conclusion
defective.
that
meter
was
C/FA/4441/2009
JUDGMENT DATED: 03/04/2024
20. The learned Trial Court has failed to appreciate the
inspection sheet and laboratory testing report, which
establishes that respondent has tampered with the
MMB Seals and Meter Body and Pressure Coils,
resultantly the meter was running slow 36.28%.
Tampering with MMB seal and Meter Body and
pressure coil can be found from the material placed
on record and duly established by the appellant. The
supplementary bill was issued by the appellant on
the basis of tampering of the meter and because of
that the meter was running slow. The learned Trial
Court has failed to appreciate that while taking Accue
test of the meter it was found that the electric load
was 111.66 H.P. The sealed wires were tampered
with and were stuck with adhesive object. In absence
of any contrary evidence against the testing report of
the laboratory and the finding of fact which was
arrived
at
by
the
Appellate
Committee
that
respondent has committed a theft of electricity.
Moreover, the challenge in the plaint was not
C/FA/4441/2009
JUDGMENT DATED: 03/04/2024
regulating the testing procedure or any plans in the
report of laboratory Testing Report.
It cannot be
presumed that the findings recorded in the report of
the laboratory is perversed or it is against the actual
condition of the MMB seal and Meter Seals. The
plaintiff could not point out from the evidence that
the allegation of theft of electricity is wrong and MMB
seals and the meter mechanism was never tampered
with. In the case of Smt. Basantbai (Supra), in
paragraph Nos.9 and 13, Hon’ble Supreme Court
has observed as under:
“9.
It is evident from the provisions of this
section that a dispute as to whether any
meter referred to in sub-section (1) is or is
not correct has to be decided by the
Electrical Inspector upon application made
by either of the parties. It is for the Inspector
to determine whether the meter is correct or
not and in case the Inspector is of the
opinion that the meter is not correct he shall
estimate the amount of energy supplied to
the consumer or the electrical quantity
contained in the supply during a period not
exceeding six months and direct the
consumer to pay the same. If there is an
allegation of fraud committed by the
consumer in tampering with the meter or
manipulating the supply line or breaking the
body seal of the meter resulting in not
registering the amount of energy supplied to
C/FA/4441/2009
JUDGMENT DATED: 03/04/2024
the Consumer or the electrical quantity
contained in the supply, such a dispute does
not fall within the purview of sub- section
6 of section 26. Such a dispute regarding the
commission Of fraud in tampering with the
meter and breaking the body seal is A
outside the ambit of section 26(6) of the said
Act. An Electrical Inspector, has, therefore,
no jurisdiction to decide such cases of fraud.
It is only the dispute as to whether the
meter is/is not correct or it is inherently
defective or faulty not recording correctly
the electricity consumed, can be decided by
the Electrical Inspector under the provisions
of the said Act.
13. We are however, unable to accept this
contrary view as it is obvious from the
provisions of section 26 sub-section 6 of the
said Act that dispute whether a meter is
correct or faulty would come under the said
provisions and not the dispute regarding
tampering of meter. In our view, the view
taken about the scope of section 26(6) in the
decisions cited above are correct. In the
instant case the dispute relates to whether
the meter is correet one or it is faulty not
recording the actual energy consumed in
running the oil mill of the respondent. So this
dispute squarely falls within the provisions of
the said Act and as such it has been rightly
found by the High Court that it is the
Electrical Inspector who alone is empowered
to decide the dispute. If the Electrical
Inspector comes to the finding that the
meter is faulty and due to some defect it has
not registered the actual consumption of
electrical energy, then the Inspector will
estimate the amount of energy consumed
and will fix the amount to be paid in respect
of such energy consumed within a period not
exceeding six months. The appellant No. 1 is
not competent pending the determination of
this dispute by the Electrical Inspector to
issue
the
impugned
notice
threatening disconnection
of
supply
of
C/FA/4441/2009
JUDGMENT DATED: 03/04/2024
electricity for non payment of supplementary
bill prepared and sent by it. The Board is also
not competent to prepare and send a
supplementary bill in respect of energy
consumed by the respondent from the one
phase which stopped functioning and did not
record any consumption of energy. For the
reasons, aforesaid we affirm the order of
High Court and dismiss the appeal without
costs.”
21. The aforesaid decision applied to the case on hand.
The Hon’ble Apex Court while dealing with issue held
that in case whether meter is correct or faulty, would
come under the provision of Section 26(6) of the
Electricity Act, 1910 and not the dispute regarding
tampering of meter.
22. Thus, taking into consideration the aforesaid factual
aspects, I am of the view that the learned trial Court
has committed an error of misreading the facts and
the controversy.
23. Resultantly,
the
judgment
and
decree
dated
18.4.2009 passed by the learned Principal Senior
C/FA/4441/2009
JUDGMENT DATED: 03/04/2024
Civil Judge, Jamnagar in Special Civil Suit No.74 of
2004 is hereby quashed and set a side. The Special
Civil Suit No.74 of 2004 is hereby dismissed. The
Appeal is accordingly allowed. No order as to cost.
24. Record and proceedings to be sent back to the
concerned Court forthwith.
SD/(D. M. DESAI,J)
VATSAL
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review