SHRI HARI CHARITABLE TRUST
...Petitioner
Versus
STATE OF HARYANA AND ORS
...Respondents
$ %$&+($ (
% $',, $ "(
)*
GRAM PANCHAYAT VILLAGE NINAN
...Petitioner
Versus
STATE OF HARYANA AND ORS
...Respondents
-
Present:
. / - !
. / - !
01 2 00
Mr. Aman Pal, Senior Advocate with
Mr. Bhupender Ghanghas, Advocate and
Mr. Rajendra Kumar, Advocate,
for the review petitioner (in RA/CW/475/2025).
Mr. Vikas Chatrath, Senior Advocate with
Ms. Dhamanpreet Kaur, Advocate,
for the review petitioner (in RA/CW/483/2025)
Mr. Sandeep Chhabra, Addl. A.G., Haryana.
*****
0-
$ %$&' $
$ %$&+($
1.
3 !4
/5
(*
(
The present review petitions have been filed keeping in view
the order dated 06.10.2025 passed by the Hon’ble Supreme Court of India in
Special Leave Petition (Civil) Diary No(s).40590 of 2025 and 44071 of
HARISH KUMAR
2026.02.04 17:33
I attest to the accuracy and
authenticity of this
order/judgment
% $"(" &$ "# *
% $',, $ "(
4 5
2025, by which the review petitioners were given liberty to approach this
Court for the review of orders dated 27.03.2025 passed by the Coordinate
Bench of this Court in CWP/15124/2016 and CWP/8993/2015, vide which
the writ petitions were finally decided.
2.
The order dated 06.10.2025 passed by the Hon’ble Supreme
Court of India in Special Leave Petition (Civil) Diary No(s).40590 of 2025
is as under:/
“Delay condoned.
We have heard the learned counsel appearing for
the petitioners.
we find that the order of remand
passed by this Court has not been complied with
In such view of the matter, we are inclined to give
liberty to the petitioners to file a review before the High
Court within a period of four weeks from the date of
receipt of a copy of this order.
Liberty is also given to the petitioner to challenge
this order in the event of the review petition being
dismissed.
The Special Leave Petitions are disposed of in
aforesaid terms.
Pending applications(s), if any, shall also stand
disposed of.”
3.
A bare perusal of the above would show that an observation has
been made by the Hon’ble Supreme Court of India that the order of
remand of the writ petitions passed by the Hon’ble Supreme Court of India,
vide order dated 21.02.2024 has not been complied with by Coordinate
Bench of this Court while passing the orders dated 27.03.2025.
HARISH KUMAR
2026.02.04 17:33
I attest to the accuracy and
authenticity of this
order/judgment
% $"(" &$ "# *
% $',, $ "(
4.
4 5
Keeping in view the said observation, coupled with the
argument raised by the learned senior counsel for the review petitioner that
no justifiable reason exercised with the State of Haryana so as to acquire the
land in question, which argument has not been dealt by the Coordinate
Bench while passing the orders dated 27.03.2025, dismissing the writ
petitions, are hereby recalled.
5.
On the joint request of learned counsel for the parties, the writ
petitions are taken up for consideration.
% $"(" &$ "# *
% $',, $ "(
1.
The petitioners have challenged the acquisition of land, where
notifications under Sections 4 and 6 of the Land Acquisition Act, 1894 (for
short, ‘the 1894 Act’) were issued on 26.08.2013 and 21.08.2014,
respectively. The land was sought to be acquired for development of Sector
31/Part, Bhiwani. The land is situated in villages Ninaan, Had Bast No.17,
Palawas, Had Bast No.12, Tehsil and District Bhiwani.
2.
Learned Senior Counsel appearing on behalf of the petitioners
has raised an argument that the acquisition of the land in question measuring
5.28 acres has been done by the Government in the present case without any
valid justification. Learned Senior Counsel submits that though, the process
envisaged under law so as to acquire the land in question, as has been upheld
by the Hon’ble Supreme Court of India in Civil Appeal No. 5947/5948 of
2022, titled as ‘HSIIDC and others vs. Deepak Aggarwal and others’,
decided on 28.07.2022 has been followed, but the only grievance of the
petitioners is that the acquisition was done without any valid cogent reason
and any justification also has not been given by the State of Haryana so as to
HARISH KUMAR
2026.02.04 17:33
I attest to the accuracy and
authenticity of this
order/judgment
% $"(" &$ "# *
% $',, $ "(
4&5
acquire the said land, especially when the Gram Panchayat as well as the
petitioner/Shri Hari Charitable Trust have raised a crucial objection that the
land in question has already been in use for beneficial purposes of the public
at large. Learned Senior Counsel for the petitioner further submits that a
community centre and Rajiv Gandhi Seva Kendra have been established on
the land in question which is being used for public good and therefore, the
said land should have been released from the acquisition after considering
said objection, which has not been done, which issue needs to be adjudicated
by this Court in the present petition.
2.
Learned Additional Advocate General, Haryana, appearing on
behalf of the State of Haryana, submits that prior to the issuance of
notification under Section 4 of the Land Acquisition Act, 1894, in the year
2013, the area in the vicinity of the land in question had already been
acquired, which acquisition was challenged by the landowners by making a
reference to the land in question that the same has not been acquired so as to
claim due compensation and adopting pick and choose method. Learned
State Counsel further submits that qua said argument which was put before
the Hon’ble Supreme Court of India by the State, in Special Leave to Appeal
(Civil) No. 35396 of 2011, titled as ‘Gaushala Trust, Bhiwani vs. State of
Haryana and others’, it was noticed that the land in question in the present
case is also being acquired as draft notification under Section 4 of the Land
Acquisition Act, 1894 had already been prepared and placed before the
competent authority. Learned State counsel submits that keeping in view the
said statement of the State of Haryana, the case was adjourned, where the
notification under Section 4 dated 28.06.2013 was produced before Hon’ble
HARISH KUMAR
2026.02.04 17:33
I attest to the accuracy and
authenticity of this
order/judgment
% $"(" &$ "# *
% $',, $ "(
4(5
Supreme Court of India, hence, the acquisition has been done is in terms of
the statement made before the Hon’ble Supreme Court of India. Learned
State Counsel further submits that land has been acquired for public purpose
namely development of transport and communication, which fact has gone
unrebutted at the hands of the petitioners.
2.1
Learned State Counsel further submits that any building which
was constructed on the land in question has already been released and
therefore, no prejudice is being caused to the petitioners with regard to the
acquisition of land in question.
3.
We have heard the learned counsel for the parties and have
gone through the record of the case with their able assistance.
4.
It may be noted that all the arguments which were raised before
the Coordinate Bench of this Court when the writ petitions were decided on
27.03.2025 have already been dealt with by the Coordinate Bench. The said
order passed by the Coordinate Bench has not been shown to be perverse to
this Court and the only argument raised is that certain other arguments
with regard to the necessity of acquisition have not been dealt with. Hence,
the order passed by the Coordinate Bench dated 27.03.2025 with regard to
the issues raised and decided, is being reiterated once again for better
adjudication of matter in hand. The findings recorded by the Coordinate
Bench in the order dated 27.03.2025 in CWP/8993/2025 are as under:/
“2.
The learned counsel appearing for the petitioner
argues, that since the declaration as became passed under
Section 6 of the Land Acquisition Act, 1894 (hereinafter
referred to as “the Act of 1894”), was so passed on 21.8.2014,
thereby when the date of making of the said declaration, thus
occurred subsequent to the coming into force of the Right to
HARISH KUMAR
2026.02.04 17:33
I attest to the accuracy and
authenticity of this
order/judgment
% $"(" &$ "# *
% $',, $ "(
4#5
Fair Compensation and Transparency in Land Acquisition,
Rehabilitation And Resettlement Act, 2013 (hereinafter
referred to as the “Act of 2013”). Therefore, he argues that no
legal relevance can become assigned to the issuance of a
notification under Section 4 on 26.8.2013.
3.
Therefore, he submits that the notification(s) (supra),
are required to be quashed, and, set aside, thus on the ground,
that since on the date of makings of Section 6 notification, the
'Act of 2013' had assumed force thus, thereby the proceedings
for acquisition were required to be launched under the 'Act of
2013', than under the 'Act of 1894'.
4.
The above raised contention before this Court by the
learned counsel for the petitioner, is no longer
, as
it becomes completely answered by a verdict drawn by the
Hon’ble Apex Court in case titled as “
” to which
!"#$%!"#&
,--.,%,--.'
'('' arising out of
)* +
'(,& became assigned. The Hon’ble
Apex Court in paragraph No.31 of the verdict (supra),
paragraph whereof, becomes extracted hereinafter, had
thereins formulated the question of law, thus for an answer
being rendered thereons.
!"
# # $#
%
"
$#
" &
# # $#
'
(
5.
# # $#
!" "
)
A reading of the hereinabove extracted formulated
question of law, reveals that the issue which engaged the
Hon’ble Apex Court appertained to whether the initiation of
proceedings under the 'Act of 1894', commenced on the date
HARISH KUMAR
2026.02.04 17:33
I attest to the accuracy and
authenticity of this
order/judgment
% $"(" &$ "# *
% $',, $ "(
4+5
of the making of a notification under Section 4 of the said
Act, or whether the initiation of acquisition proceedings under
the 'Act of 1894', commenced on the date of making of a
declaration under Section 6 of the 'Act of 1894'. It appears
that the reason for the drawing of questions of law (supra),
arose from the provisions occurring in Section 24(1) of the
'Act of 2013', provisions whereof stands extracted hereinafter.
'#
/
,&"#
,
*% &
"
!
"
"
+, -
% &
!
"
"
(
"
.
%(&
(
!
"
6.
"
(
"
)
Moreover, the Hon’ble Apex Court was engaged in
making an interpretation of the phraseology “proceedings
initiated under the 'Act of 1894', as occurs in Section 24(1) of
the 'Act of 2013'. In rendering an answer to the above
question of law, the Hon’ble Apex Court in paragraph No.32
thereof, paragraph whereof becomes extracted hereinafter,
had expostulated, that the initiation of acquisition proceedings
under the 'Act of 1894', thus occurs on the date of making of a
notification under Section 4 of the said Act, and, that the
initiation of acquisition proceedings under the 'Act of 1894',
does not occur, on the date of issuance of a declaration under
Section 6 of the 'Act of 1894'.
/
(
$#
HARISH KUMAR
2026.02.04 17:33
I attest to the accuracy and
authenticity of this
order/judgment
"
% $"(" &$ "# *
% $',, $ "(
4'5
/
(
$ % &% &
(
(
$ % &
% &
!" "
# # $#
$#
"
!" "
$#
(
"
!" "
(
# # $#
$#
"
(
$#
"
(
(
$#
(
"
(
(
(
(
(
% &
!"
"
(
$ % &
$#
"
$#
"
(
(
HARISH KUMAR
2026.02.04 17:33
I attest to the accuracy and
authenticity of this
order/judgment
!"
% $"(" &$ "# *
% $',, $ "(
4,5
"
(
(
(
(
(
!" "
$#
"
$ % &% &
(
$#
"
(
(
(
(
(
/
!" "
(
$ % &% &
$#
/ 07
"
" (
%
&
"
(
(8
$#
"
(
(
"
(
(
$#
"
(
HARISH KUMAR
2026.02.04 17:33
I attest to the accuracy and
authenticity of this
order/judgment
% $"(" &$ "# *
% $',, $ "(
4" 5
(
:57
( 8
(
$
(
$ % &%(&
(
$ % &% & (
$ % &% &
$#
"
:57
% &
# # $#
# # $#
'
!" "
(
# # $#
(
(
(
$#
"
"
$ % &% &
7.
$#
"
0 ( )
Moreover, while making the above interpretation to the
above statutory phraseology, which occurs in the 'Act of
2013', the Hon’ble Apex Court in paragraph 32 carried in
verdict (supra), thus proceeded to declare, that if the
notification under Section 4 of the 'Act of 1894', is issued
prior to the coming into force of the 'Act of 2013', thereby if
the award, which was otherwise to be drawn in terms of
Section 11, of the 'Act of 1894', thus is not drawn prior to the
coming into force of the 'Act of 2013', or is drawn on coming
into force of the 'Act of 2013', yet the Acquiring Authority
concerned, rather in terms of the provisions extracted (supra),
becoming endowed with or being preserved a liberty, to yet
proceed to make an award under the 'Act of 1894', besides the
making of an award under the 'Act of 1894', thus post the
coming into force of the 'Act of 2013', rather assuming force.
HARISH KUMAR
2026.02.04 17:33
I attest to the accuracy and
authenticity of this
order/judgment
% $"(" &$ "# *
% $',, $ "(
4""5
Importantly, yet the compensation being amenable to become
determined in terms of the statutory principles contemplated
under the 'Act of 2013'.
8.
In consequence, it has to be now determined, whether
the Acquiring Authority concerned, issued the notification
under Section 4 of the Act of 1894, thus prior to the coming
into force of the Act of 2013, inasmuch as, whether the said
notification became issued prior to 01.01.2014, thus whereons
the 'Act of 2013' assumed force and/or came into operation.
9.
In the above regard, it is not disputed, that the
notification as issued under Section 4 of the 'Act of 1894',
was issued on 26.8.2013, and, when the date of issuance of
the said notification, is prior to the coming into force of the
'Act of 2013'. Therefore, in terms of the verdict (supra), the
acquisition proceedings became initiated as such under the
'Act of 1894'. Consequently, the subsequently issued
declaration under Section 6 of the 'Act of 1894', even if the
date of making of the said declaration, was subsequent to the
coming into force of the 'Act of 2013'. Nonetheless, the trite
factum of issuance of a notification under Section 4 of the
'Act of 1894' rather on a date, but prior to the coming into
force of the 'Act of 2013', has the conspicuous relevance and
import, thus for thereby validating the subsequently issued
declaration under Section 6 of the Act of 1894.
10.
Furthermore, a perusal of reply on affidavit reveals
that the award of the instant acquisition proceedings could not
be passed owing to the interim orders passed by this Court,
which were further made absolute by this Court vide order
dated 05.09.2017, whereby the notification qua the petitioner
was quashed in view of the full Bench judgment rendered in
case titled as
9>
<
6 7
88 9: ;
<
= 91!0
= 9 . Thereafter, the said judgment of the
full Bench of this Court became set aside by the Hon'ble
Apex Court in case titled as
1!
6 7
88 9: ;
40?69 5 and the instant writ petition became remanded by the
HARISH KUMAR
2026.02.04 17:33
I attest to the accuracy and
authenticity of this
order/judgment
% $"(" &$ "# *
% $',, $ "(
4" 5
Hon'ble Apex Court vide order dated 21.02.2024 and the
Hon'ble Apex Court directed to maintain
?
@?
regarding possession. It was in view of the above stay order
in operation till today, that the award could not be
pronounced.
11.
However, since the said non passing of award and non
assumption of possession of the subject lands was owing to
the interim/final orders respectively passed by this Court and
the Hon'ble Apex Court, therefore, it cannot be construed that
the authorities have not proceeded in accordance with law
and/or the acquisition proceedings become vitiated.
12.
Reliance in this regard has been placed upon the
verdict rendered by the Hon'ble Apex Court in case titled as
23 2
'(," * 6)4525 7648+ #,#" whereins
it has been expostulated that
(
'
"
( 8
(
(
"
13.
The import of the above expostulations, is that, the non
rendition of awards under the 'Act of 1894', when arises from
stay orders becoming granted by the Courts of Law, thereby
the launching of acquisition proceedings under the 'Act of
1894', thus would not become lapsed, rather the Collector
concerned, may in terms of Section 11 of the 'Act of 1894'
thus make an award.
14.
However, in the instant case the Section 4 notification
became issued on 26.8.2013, followed by declaration under
HARISH KUMAR
2026.02.04 17:33
I attest to the accuracy and
authenticity of this
order/judgment
% $"(" &$ "# *
% $',, $ "(
4" 5
Section 6 of the 'Act of 1894' on 21.8.2014, therefore, in view
of the settled factual matrix rendered in judgment by the
Hon'ble Apex Court in
*
+, the provisions of Section 24 (1) (a) of the 'Act of
2013' shall apply to the instant case and the determination of
compensation shall be made in accordance with the
provisions of the 'Act of 2013'.
15.
Therefore, the respondent concerned, is directed to
pass award under Section 11 of the 'Act of 1894' in respect of
the acquired lands but the determination of compensation be
made in terms of the 'Act of 2013'. Furthermore, the petitioner
is directed to forthwith hand over encumbrance free
possession of the subject lands to the respondent concerned.
16.
Conspicuously also since it has been stated in the reply
on affidavit, already on record, that the subject lands are an
integral component of the layout plans, thereby when they are
facilitating the relevant public purposes. Consequently, when
public purpose than the ill individualistic interest of the
petitioner is rather to be furthered. Resultantly, this Court
finds no merit in the instant petition, and, is constrained to
dismiss it.
;
17.
9< 9
=
?9 !
In aftermath, this Court finds no merit in the writ
petition, and, with the above observations, the same is hereby
dismissed. The impugned notification(s) are maintained and
affirmed but as stated (supra) the award be passed qua the
subject lands under Section 11 of the 'Act of 1894' but
compensation be determined in terms of the 'Act of 2013'.”
5.
The findings recorded by the Coordinate Bench vide order
dated 27.03.2025 reproduced above stand reiterated even by this Court
today.
6.
HARISH KUMAR
2026.02.04 17:33
I attest to the accuracy and
authenticity of this
order/judgment
The question raised with regard to the necessity of the
% $"(" &$ "# *
% $',, $ "(
4"&5
acquisition, which has been raised before this Court now, the same has been
explained by the learned State counsel that the same was done keeping in
view the statement given by the State of Haryana before the
Hon’ble Supreme Court of India in Special Leave to Appeal (Civil) No.
35396 of 2011, titled as :;
<
, which fact has gone unrebutted at the hands of the petitioners.
Hence, the assertion of the learned senior counsel for the petitioner that the
land in question has been acquired without any application of mind cannot
be accepted and is accordingly rejected.
7.
The argument raised at the hands of the petitioners that there
was no necessity at the hands of State for acquiring the land in qustion,
especially when the same was already being used for larger public good, the
same also cannot be accepted! In this regard, it may be noticed that building
of Rajiv Gandhi Seva Kendra, which was constructed by the petitioner for
the execution of some public purpose, has not been acquired, which is a
conceded fact.
8.
Further, the grievance raised by the petitioners with regard to
the pond area and the land on which the community centre had been
constructed that the same has not been released, it may be noticed that the
said land has been acquired for the general public and also for the residents
of the village and the same will be beneficial especially to the residents of
the village. It has already come on record that the acquired land is to be
used for development of transport and communication. Hence, it cannot be
said that in the in the act of acquiring the said land, no public purpose is
involved, rather the case is quite contrary. Merely because a certain portion
HARISH KUMAR
2026.02.04 17:33
I attest to the accuracy and
authenticity of this
order/judgment
% $"(" &$ "# *
% $',, $ "(
4"(5
of the building falling in the chunk of land in question, which could not be
released due to the execution of the purpose for which the acquisition is
being made, cannot be treated as arbitrary or illegal.
9.
It may be noticed that the present land was the left out land
from the earlier acquisition of land done by the State for the purpose of
establishing sector 31/Part, Bhiwani. The action of leaving the present land
out of acquisition was made part of the challenge before the Hon’ble
Supreme Court of India, wherein the State undertook before the Hon’ble
Supreme Court of India that the remaining land i.e. the land in question in
the present matter is also being acquired for public purpose and for greater
public good, which undertaking was established by placing on record
notification under Section 4, upon which the earlier acquisition of land in
vicinity of land in question was upheld. Now, keeping in view said
undertaking, fulfilment of which is necessary, the land in question has been
acquired which also has been done for the public purpose, which fact has
gone unrebutted at hands of petitioners. Hence, once there is a due
application of mind in acquiring the land in question, coupled with the fact
that the same has been done for public purpose, no ground is made out for
any interference in the acquisition of the land.
10.
In CWP/15124/2016, learned senior counsel appearing on
behalf of the petitioner submits that the Land Acquisition Officer has made
an observation qua releasing of the land in question. It may be noticed that
such observation goes contrary to the undertaking given by the State of
Haryana before the Hon’ble Supreme Court of India that the same will be
used for public purpose, hence, keeping in view said aspect, the
HARISH KUMAR
2026.02.04 17:33
I attest to the accuracy and
authenticity of this
order/judgment
% $"(" &$ "# *
% $',, $ "(
4"#5
recommendation made by the Land Acquisition Officer will not entitle the
petitioner to claim the release of the land in question.
11.
Learned senior counsel appearing on behalf of the petitioner
further submits that the time period prescribed to pass an award for land
acquisition, which is to be granted by the Collector, has already lapsed in
terms of Section 11A of the Land Acquisition Act, 1894. On being asked to
point out the same from the pleadings and factual averments on this aspect,
learned senior counsel appearing on behalf of the petitioner fairly concedes
that there exists no such averment. Once, no such averment has been made
in the writ petition, the same cannot be raised at the stage of argument. It is
only the pleadings which have been occurred that need to be decided by this
Court especially when, the liberty was given by the Hon’ble Supreme Court
of India to decide the remaining issues as have been raised in the writ
petition.
12.
No other arguments has been raised.
13.
Keeping in view the discussion made hereinbefore, the present
writ petitions are dismissed.
14.
Pending applications, if any, also stand disposed of.
15.
Photocopy of this order be placed on the file of connected case.
? 9>
#
Whether speaking/reasoned
Whether reportable
HARISH KUMAR
2026.02.04 17:33
I attest to the accuracy and
authenticity of this
order/judgment
0-
Yes
No
41 2 00
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review