IN THE HIGH COURT AT CALCUTTA
CONSTITUTIONAL WRIT JURISDICTION
APPELLATE SIDE
Present:
The Hon’ble Justice Rai Chattopadhyay
WPA 12778 of 2023
Paritosh Joddar & Ors.
Vs.
The State of West Bengal & Ors.
With
WPA 16629 of 2023
Ganesh Chandra Dutta & Ors.
Vs.
The State of West Bengal & Ors.
For the Petitioner
: Mr. Arabinda Chatterjee, ld. Sr. Adv.
: Mr. Bhaskar Nandi
… in WPA 12778 of 2023
: Mr. N.I. Khan
: Md. Rafiqul Islam
… in WPA 16629 of 2023
For the respondent No. 6
: Mr. Arabinda Chatterjee, ld. Sr. Adv.
: Mr. Bhaskar Nandi
… in WPA 12778 of 2023
For the State
: Mr. Amal Kumar Sen, Ld. AGP
: Mr. Subrata Guha Biswas
Judgment on
: 18.08.2026
Uploaded on
: 18.08.2026
Rai Chattopadhyay, J. :1)
The two writ petitions as mentioned above are connected
and bear similar issues. Hence both have been heard
together and disposed of by this common judgment.
2)
The petitioners in writ petition No. WPA 12778 of 2023, who
are the operators over Route No. 39, 39A and 39A/1, have
challenged the resolution of RTA Kolkata dated February 9,
2010 and its other resolution dated April 12, 2023. They
have prayed for setting aside of both and for further
direction allowing the petitioners to ply vehicles on the
alignment from Picnic Garden to Howrah Station (via
Kushtia, Chittaranjan Hospital, Mallick Bazar, Sealdah,
M.G.Road), which is the original route alignment of Route
No. 39A/2.
3)
The petitioners in WPA 16629 of 2023 have alleged about
illegal and unauthorised plying of vehicle on Route No.
39A/2 by the petitioners in WPA 12778 of 2023, in the
common stretch of alignment used by the said petitioners
and sought for due implementation of the resolution of RTA
Kolkata dated April 12, 2023.
4)
Vide the notification No. 2129-WT/8S-50/2000 Pt. III dated
May 7, 2003, published under section 71(3)(a) of the Motor
Vehicles Act, 1980, fleet strength of Route No.39A/2 (from
Howrah Station to Picnic Garden), has been fixed as 18. The
petitioners in WPA 12778 of 2023 were granted permits over
the route, in the years 2015, 2016 and 2018 respectively.
5)
The petitioners in WPA 16629 of 2023 are the permit
holders and operators over Route No. S-128 and S-128/1.
Vide the same notification, that is dated May 7, 2003,
maximum number of stage carriage permits over Route
No.S-128 was fixed as 30.
6)
Much before the petitioners in WPA 12778 of 2023, were
granted permit over Route No. 39, 39A and 39A/1, in the
years 2015, 2016 and 2018 respectively, one Mr. Ashok
Ganguli, Secretary, Route Committee of Route No. 39, 39A
and 39A/2, submitted prayer for extension of Route No.
39A/2, to RTA Kolkata on September 18, 2006. In the
impugned resolution dated February 9, 2010, the said
prayer of extension of Route No. 39A/2 was allowed. Now
the new road alignment comes to be from Bhojer hat to
Howrah Station (via Bhatipota, Leather Complex Gate No. 3,
Banadevitala, Leather Complex Gate No. 1, Kata Tala,
Kolkata Police Fari, Kachageri, Bamanghata Bazar, Jalpath 1
No. Government Colony , B.I.T. College, Bantala Bazar, Koyla
Depo, Chowbagha, Paschim Chowbagha, Arupota Cuvert, VIP
Bridge, Science City More, Topsia, Kohinoor Market, Darga
Road/4 No. Bridge Crossing, Lady Brabourn College, Mullick
Bazar/Park Street Crossing, James School, Nil Ratan Medical
College & Hospital, Chabighar Cinema, College Street/M.G.
Road Crossing, Burrabazar P.S., Howrah Bridge approach).
7)
The petitioners in WPA 12778 of 2023 have alleged that vide
the impugned resolution as above, the route alignment of
Route No. 39A/2 has been altered absolutely thereby
curtailing a portion of route from Kohinoor Market to Picnic
Garden (VIP Bazar) and extending the said route up to
Bhojer hat from Darga Road/No.4 Bridge Crossing.
8)
Mr. Arabinda Chatterjee, learned senior counsel for the
petitioners in WPA 12778 of 2023 has submitted firstly that
in response to an application for extension of route, the
authority could not have lawfully effected both curtailment
and extension of the route together. It is submitted that in
accordance with Section 80(3) of the Motor Vehicles Act,
1988, a change in the name of extension of route thereby
effecting both curtailment as well as extension thereof, is
not permissible. Allegedly, in the instant case, the
respondent authority has acted in such an impermissible
manner which according to Mr. Chatterjee, learned counsel
for the petitioners amount to variation of the existing route.
He submits that there are also criteria stipulated in the
statute as to when and by what manner variation of an
existing route is permissible. That is, variation is
permissible keeping the termini of the route intact. However,
also allegedly, in this case as per the impugned resolution of
RTA, Kolkata dated February 09, 2010 allowed the terminus
to be altered, in violation of what the law has provided. It is
stated that a portion of route from ―Kohinoor Market to Picnic
Garden (VIP Bazar)‖ stood curtailed whereas the alignment
stood extended up to Bhojer Hat from Darga Road/No. 4
Bridge Crossing. He submits that due to such gross violation
of the provisions of law, the decision adopted by the RTA,
Kolkata on February 09, 2010 is illegal and liable to be
quashed.
9)
The decision of the RTA, Kolkata vide resolution dated
February 09, 2010 also stands in violation of an earlier
notification issued by the Transport Department,
Government of West Bengal on August 02, 2004, Mr.
Chatterjee has submitted. It is submitted by the
Government took a policy decision whereby the State
Transport Authority, West Bengal and all the Regional
Transport Authorities in the State have been directed not to
issue any new permit for stage carriage originating,
terminating and/or passing through the Central Business
District that is, Esplanade and Bandstand in Kolkata and
Howrah Station and approach area of Howrah bridge. It was
decided
that
no
new
bus
route
should
be
created/formulated within Kolkata and Howrah in view of
such restriction. Mr. Chatterjee has submitted that decision
of the RTA, Kolkata vide resolution dated February 09, 2010
amounts to creation of a new route rather than extension of
an existing route, due to change of complete alignment of
route No. 39A/2. Therefore, it is submitted that the RTA,
Kolkata has acted unauthorizedly and beyond jurisdiction in
adopting resolution dated February 09, 2010.
10)
Next, it is argued that though a decision of change and/or
extension of route was taken by the respondent/Regional
Transport Authority, Kolkata vide resolution dated February
09, 2010, still when the petitioners were granted permits in
the year 2015, 2016 and 2018 respectively, they have been
provided with the ‗Fare Chart‘ issued for the route alignment
from Picnic Garden Road to Howrah Station which is the old
alignment of the route. Therefore, according to the writ
petitioners here, the extended route has never been made
effective by the respondent authority till the year 2023,
when the petitioners were restrained to ply vehicle from
Picnic Garden to Howrah Station on March 06, 2023 for the
first time and were directed to operate from Bhojer Hat to
Howrah Station. It is submitted that endorsement of the old
route that is from Picinic Garden to Howrah Station was
made in Part A and B of the permits of the petitioner, even
after extension of route has said to have been given effect to
vide resolution dated February 09, 2010.
11)
It is not only that the petitioners have never restrained to
operate over the old alignment of the route since the time
they have been granted with the permit but also that never
the petitioners were required to seek for counter-signature
of the RTA, South 24 Paraganas in terms of Section 88,
Motor Vehicles Act, 1988 read with Rule 102 of the West
Bengal Motor Vehicles Rules, 1989, which would have been
otherwise required for the petitioner to ply their vehicle over
the so-called extended new route alignment from Bhojer Hat
to Howrah Station. Also that, in spite of a condition having
been mentioned in the resolution dated February 09, 2010
that the extension of route shall come into effect only with
approval of the Transport Department of Government of
West Bengal, no such approval has ever been sought for or
granted. Therefore, according to the petitioners, the
condition for the extension of route to come into effect has
never been fulfilled. Therefore, the petitioners cannot be
forced to comply with the so-called new alignment on road,
which also otherwise tantamount to violation of their own
permit conditions.
12)
The petitioners have alleged that the respondent authority
wanted to implement the extended route as above by
endorsement in the respective permits of the petitioners, in
resolution dated April 12, 2023 which is unfair, unjust,
mala fide, motivated, arbitrary and vindictive.
13)
For all the reasons as stated above, petitioners in writ
petition No. 12778 of 2023 pray for that both the resolutions
of the RTA, Kolkata dated February 09, 2010 and April 12,
2023 may be set aside and they may be allowed to continue
operating over the route as per their original permit.
14)
Mr. N.I. Khan, learned advocate has represented the writ
petitioners in WPA 16629 of 2023, the petitioners therein
are the operators of route No. S-128 (Eastern part to Howrah
Fire Station) who filed a complaint dated January 03, 2023
before the respondent authority alleging unauthorized plying
of vehicle over route No. 39A/2. Mr. Khan, learned advocate
has submitted that instead of plying vehicle over the
permitted route No. 39A/2, the operators are unauthorizedly
and illegally violating the route alignment and plying on a
different route, substantial operation of which falls within
the common alignment of the route of the petitioners there.
Mr. Khan has further submitted that in spite of lodging
complaint, the RTA, Kolkata has not taken any steps with
regard to the grievance of the petitioners and to restrain the
wrong doers to continue with their unauthorized and illegal
plying of vehicle. It is submitted that due to violation of the
permit condition, the violators are liable for punishment of
cancellation of their permits as per provision under Section
86 of the Motor Vehicles Act, 1988. Mr. Khan further
submits that change of route by way of extension, if any,
was done by the respondent authority for public purpose
and for the purpose of safety and security of the commuters.
That, it no way prejudice the rights of the petitioner‘s in
WPA 12778 of 2023. It is submitted that also the said
persons have acted in violation of law by not applying for
counter-signature before the RTA, South 24 Paraganas as
the extended alignment of route amounts to be an interregional route spreading over the jurisdiction of the two
Regional Transport Authorities.
15)
State authorities are represented by Mr. Amal Kumar Sen,
learned AGP. According to the State, there has been
direction by the Hon‘ble Division Bench of this Court
regarding restricted operation over the particular area of
Kolkata city as well as Howrah (as mentioned above). In due
compliance thereof, the State issued notification dated May
7, 2003 restraining vehicle operation within and at the
vicinity of Kolkata, including Howrah. Mr. Sen has seriously
disputed the submissions made that change brought in to
the alignment of the route has amounted to variation of the
route. He submits that STA, Kolkata is empowered under
statute to bring into effect any extension of route
considering the public interest. Therefore, in exercise of that
power, the respondent authority has brought in changes
over the route that too, particularly, keeping in mind the
order of the Hon‘ble Division Bench, though without
changing both the termini points over the route. Thus, it is
submitted that the State respondent has duly complied with
the statutory requirement of extension of a route. That, this
right the RTA, Kolkata can exercise without permission
approval or prior approval of the State authority as per law
that, since there is no change of termini, the argument of
the petitioners in WPA 12778 of 2023, that a new route has
been formulated without sanction of State authority is only
baseless.
16)
Thus, the State respondent has fully supported the
resolutions dated February 09, 2010 and April 12, 2023
adopted by the RTA, Kolkata as impugned in writ petition
No. WPA 12778 of 2023.
17)
About objection of the petitioners in WPA 16629 of 2023, for
plying of the vehicles by the writ petitioners in WPA 12778
of 2023, over the route from Picnic Garden to Howrah
Station, the petitioners in WPA 12778 of 2023 say that the
other petitioners in WPA 16629 of 2023 are their rivals in
trade being the other existing operators. It is submitted that
the existing operators, who are rival in trade, have no locus
standi to raise any objection in accordance with the law
settled. In this regard, the petitioners in WPA 12778 of 2023
have relied on the judgments of the Hon‘ble Supreme Court
in Mithilesh Garg versus the Union of India reported at
AIR 1992 SC 443 and the Larger Bench of this Court in
Prabhat Pan and others versus State of West Bengal
reported at (2015) 2 CHN 185.
18)
Mr. Khan, learned advocate for the petitioners in WPA
16629 of 2023 has relied on a judgment of the Supreme
Court in Subhash Chandra and others versus State of
U.P. and others reported at AIR 1980 SC 800, to submit
that route alignment is fixed necessarily for the purpose of
convenience and safety of the public at large. That, it is not
at the convenience of the individual operator to follow a
particular route or time-table at his whims. That, it consists
to be condition of permit which the law mandates for due
performance by the operator.
19)
Mr. Amal Kumar Sen, learned AGP while representing the
State, has relied on a Division Bench judgment of this Court
in Secretary, Route No. 56 Bus Association versus
Champadanga Dakshineswar Bus Association and
others dated February 20, 1997 in FMAT 2902 of 1996. The
Division Bench, in the said judgment has held that a
separate prior formulation of the route by the State
Government was not an indispensable pre-requisite for
granting the permit. Route formulation could form part of
the permit granting process and the Transport Authorities
were competent to determine the route having regard to
traffic and public transport considerations. The Court has
held that, since the authorities had considered and
approved the temporary route, the permit arrangement was
not liable to be quashed merely because there had been no
separate formal route formulation by the State Government.
Thus, in the said judgment, the Court has clearly
distinguished two aspects, firstly, formal route formulation
by the State Government and permit arrangement over a
route having regard to traffic and public transport
considerations.
20)
Mr. Arabinda Chatterjee, learned advocate for the
petitioners in 12778 of 2023, has distinguished both the
judgments relied on respectively by the petitioners of WPA
16629 of 2023 and the State. He submits that, in the
factual background of the present case, the judgment of
Mithilesh Garg (supra) has no manner of application to
the instant case as the subject matter thereof is totally
different and distinguishable, which relates to age of a
vehicle. While distinguishing the judgment relied on by the
State in the case of Secretary, Route No. 56 Bus
Association (supra), Mr. Chatterjee, learned advocate has
stated that to be not applicable in the present case in which
the Court has dealt with an emergent situation when
Vivekananda Bridge had collapsed and the route had to be
altered for the said compelling reason; that the Court has
observed in the same, that arrangement decided upon by
the authorities is a temporary one for the time till the bridge
is repaired and reopened.
21)
In essence, the petitioners in WPA 12778 of 2023 have
challenged the authority of RTA, Kolkata, that it lacked
jurisdiction to issue notification dated February 09, 2010.
Allegedly also, the statutory procedure for alteration of a
stage carriage route was not followed. Furthermore, that the
notification dated February 09, 2010 has never been
implemented or given effect to in case of the present
petitioners, before the subsequent impugned resolution
dated April 12, 2023. Therefore, for them it was never
operative and cannot be made so any further. The
petitioners‘ contention is barred upon administrative
conduct or acquiescence, that they continuously used old
alignment with knowledge of the respondent authority, that
the authority continuously collected taxes, issued fitness
certificates or otherwise treated their operation as
permissible. Finally, that the individual permits of the
petitioners in WPA 12778 of 2023 expressly authorize each
permit holder to ply over the route alignment as per preFebruary 09, 2010 regime. No change in the permit
conditions have ever been made since after issuance of the
purported resolution dated February 09, 2010, in the
permit conditions of the petitioners. Therefore, those
persons claim it to be their rightful entitlement as per terms
and conditions of their individual permits, to continue
plying vehicle over the old alignment of route which existed
during regime pre-February 09, 2010. Any change therein,
according to them would amount to changing the route
itself, which would require separate set of statutory
compliance to be made by the appropriate statutory
authority empowered and authorized to do change in route
alignment. For all these reasons, they have stated that not
only the impugned resolution dated February 09, 2010 but
also the impugned resolution dated April 12, 2023 which
sought to endorse the new alignment in the permits of the
petitioners, stand contrary to law and liable to be set aside
being contrary to law.
22)
To best understand the pre-February 09, 2010 regime route
alignment and the change introduced therein after February
09, 2010, the following flow chart and map may be of some
help –
NOTIFIED CHANGE
AFTER 09.02.2010
BEFORE 09.02.2010
HOWRAH
HOWRAH
SEALDAH
SEALDAH
NO. 4 BRIDGE / DARGA ROAD
NO. 4 BRIDGE / DARGA ROAD
KOHINOOR MARKET
TOPSIA
LEATHER COMPLEX
PICNIC GARDEN
(VIP BAZAR)
BHOJER HAT
23)
The following diagram may be used to understand the
alleged overlapping or clash which the petitioners in WPA
16629 of 2023 claims to have happened due to nonalignment of the changed route condition by the petitioners
of WPA 12778 of 2023 –
24)
Having noticed the respective submissions, the statutory
scheme and the route diagrams placed on record, the
principal question which falls for consideration is whether
the resolution of the Regional Transport Authority, Kolkata
dated February 9, 2010 can be characterised as an act of
creation or formulation of an altogether new route, beyond
the jurisdiction of the said authority, or whether it is, in
substance and in law, a permissible alteration/extension of
the alignment of an existing route, namely Route No. 39A/2.
The answer to the question, in the facts of the present case,
must necessarily be found not merely from the description
of the route in the resolution but by examining the identity
and continuity of the route before and after the impugned
decision.
25)
Section 2(38) of the Motor Vehicles Act, 1988 defines "route"
to mean a line of travel which specifies the highway which
may be traversed by a motor vehicle between one terminus
and another. Section 80(3) of the said Act contemplates
variation, extension and curtailment of a route covered by
an existing permit and treats an application for such
alteration, subject to the statutory provisos, as an
application for grant of a new permit. The provision,
therefore, itself recognises that a route may undergo
variation, extension or curtailment without every such
alteration being treated, in substance, as the creation of an
entirely independent route. The statutory distinction
between an alteration of an existing route and formulation of
a new route cannot be lost sight of.
26)
The second proviso to Section 80(3), in particular,
recognises variation and extension within the prescribed
limits and makes public convenience the controlling
consideration. The statutory scheme consequently does not
proceed on the premise that the identity of a stage-carriage
route becomes immutable upon its first formulation.
27)
It is true that Section 68(3)(ca) of the Act provides that the
Government shall formulate routes for plying stage
carriages. The petitioners are, therefore, right to the limited
extent that the Regional Transport Authority cannot, by an
administrative device, arrogate to itself the statutory power
of the Government to formulate an altogether new route. But
that proposition does not carry the matter any further. The
question is not whether the RTA could formulate a new
route; the question is whether what was done on February
9, 2010 amounted to such formulation at all. The distinction
is fundamental. Formulation of a route and alteration of the
alignment of an existing route are not synonymous
exercises. The former creates the statutory identity of a
route; the latter regulates the line of travel by which an
already existing route is to be operated, in accordance with
the statutory and regulatory framework governing stagecarriage services.
28)
The precise terms of the resolution dated February 09,
2010, as communicated by the memo dated April 16, 2010,
assume significance in determining the true character of the
decision taken by the Regional Transport Authority, Kolkata.
The resolution records that the RTA ‗decided to extend the
alignment of Route No.39A/2 upto Bhojerhat subject to
necessary approval from the Transport Deptt.‘ and further
records that the desired NOC in that regard had already
been received from the RTA, South 24-Parganas. The
language employed by the statutory authority is thus not
one of formulation or creation of a new route, but expressly
one of extension of the alignment of an existing route. This
distinction is of some importance in the context of Section
80(3) of the Motor Vehicles Act, 1988. The said provision
expressly brings within its contemplation an application
involving ‗variation, extension or curtailment‘ of the route
specified in a stage carriage permit and treats such an
application as an application for grant of a new permit for
the purpose of the statutory procedure. The provision,
therefore, itself recognises that an existing route may
lawfully be varied or extended without the resulting route
necessarily becoming, in substance, an altogether newly
formulated route. The second proviso to Section 80(3)
further prescribes that, in the case of an extension, the
distance covered by such extension shall not exceed twentyfour kilometres from the terminus and that such extension
within the prescribed limit can be made only when the
transport authority is satisfied that the same will serve the
convenience of the public and that it is not expedient to
grant a separate permit in respect of the original route as so
extended or any part thereof. The Division Bench of this
Court in State of West Bengal & Ors. versus Arup
Kumar Ghosh, APOT 117 of 2025, decided on
September 04, 2025, while examining the very scope and
object of Section 80(3) of the Motor Vehicles Act 1988, has
emphasised that public convenience is the paramount
consideration underlying the provision and that the
statutory requirements governing variation and extension
cannot be treated as dispensable. The Division Bench has,
upon a plain reading of Section 80(3), recognised that an
application for alteration, variation, extension or curtailment
of an existing stage-carriage route falls within the statutory
scheme of Section 80(3), and has specifically held that the
convenience of the public has to be considered while dealing
with such alteration. In the present case, therefore, the legal
character of the resolution has to be determined by the
statutory expression actually used therein. It is an extension
of the alignment of Route No.39A/2, and not a formulation
by the RTA of a new and independent route. The
requirement of twenty-four kilometres under the second
proviso must consequently be applied to the proposed
extension from the relevant terminus of the existing route,
and not by treating the entire length of Route No.39A/2
from Howrah Station to Bhojerhat as the ‗extension‘. The
route materials placed before this Court show that the preexisting alignment terminated at VIP Bazar/Picnic Garden
and that the subsequent alignment proceeded from the
existing
corridor
towards
Bhojerhat
through
the
eastern/south-eastern corridor including Topsia, Science
City, Bantala and the Leather Complex. Historical route
material likewise records both the earlier Howrah Station–
VIP Bazar alignment and the subsequent Howrah Station–
Bhojherhat alignment. Thus, the statutory distance
requirement has to be tested with reference to the additional
distance between the erstwhile terminus and Bhojerhat, and
not with reference to the entire Howrah–Bhojerhat route.
29)
On the materials placed before the Court, there is no basis
for treating the entire distance from Howrah Station to
Bhojerhat as the extension contemplated by Section 80(3).
The route map, in fact, demonstrates substantial continuity
of the pre-existing route and an alteration/extension at its
eastern/south-eastern end. Further, the resolution itself did
not
purport
to
make
the
extension
operational
unconditionally; it expressly made the decision subject to
the ‗necessary approval from the Transport Deptt.‘ and
recorded that the NOC of RTA South 24-Parganas had
already been obtained. The conditional language employed
by the RTA is significant. It demonstrates that the RTA was
conscious of the statutory hierarchy and did not treat its
resolution as equivalent to an independent governmental
formulation of a new route. Rather, it resolved to extend the
alignment of an existing route, subject to obtaining the
approval which was required at the governmental level.
Such a resolution cannot, therefore, be characterised as an
assumption by the RTA of a power expressly reserved to the
Government under Section 68(3)(ca) of the Act of 1988 to
formulate routes. The statutory scheme has to be read
harmoniously: the Government retains the power to
formulate routes, whereas the transport authorities exercise
the regulatory powers contemplated by Section 80(3) in
relation to variation and extension of existing permitted
routes, subject to the conditions prescribed by the statute.
The distinction is not merely semantic but goes to the
jurisdictional question raised by the petitioners. A decision
to extend an existing route, subject to the necessary
governmental approval, is legally different from an
unauthorised decision by the RTA to formulate an entirely
new route. The resolution dated February 9, 2010 falls in
the former category.
30)
The route diagrams appended to the record make the
position particularly clear. Prior to February 9, 2010, Route
No. 39A/2 proceeded from Howrah Station through the
established common corridor including Sealdah and No. 4
Bridge/Darga Road and thereafter towards Kohinoor Market
and Picnic Garden (VIP Bazar). Following the impugned
decision, the portion from Kohinoor Market to Picnic Garden
was curtailed and, from the No. 4 Bridge/Darga Road area,
the alignment was carried towards Topsia, Leather Complex
and ultimately Bhojer Hat. The portion of the journey from
Howrah Station through the established central corridor was
not extinguished and replaced by an unrelated line of travel;
rather, the line of travel was redirected at a particular point
and the service was extended towards another destination.
The diagrams therefore disclose continuity rather than
rupture. The route did not acquire an unrelated origin and
destination disconnected from the pre-existing Route No.
39A/2. What occurred was an alteration in the line of travel
of the same stage-carriage service.
The diagram placed at paragraph 22 of the record itself
demonstrates the point: the common portion from Howrah
through Sealdah up to the No. 4 Bridge/Darga Road
remains identifiable, while the divergence occurs thereafter.
31)
The argument that the entire route was "absolutely altered"
because one portion was curtailed and another portion was
added proceeds from a description of the physical
consequence of the alteration, rather than from its legal
character. A route is not rendered a newly formulated route
merely because its alignment has been substantially
modified. If that were the test, every substantial alteration of
an existing stage-carriage route would necessarily require
formulation of a new route, notwithstanding the statutory
provisions which expressly contemplate variation, extension
and curtailment. The appropriate test is one of legal identity
and continuity. Here, Route No. 39A/2 remained the route
in question; the existing service from Howrah Station
continued; the established central-city portion continued;
and the alteration concerned the line of travel at and beyond
the No. 4 Bridge/Darga Road area. The petitioners'
description of the alteration as the "creation of a new route"
is therefore not borne out by the route itself.
32)
Rule 104 of the West Bengal Motor Vehicles Rules, 1989
specifically contemplates extension or variation of a route
within the prescribed statutory framework and provides for
concurrence where the proposed extension or variation falls
within the jurisdiction of another Regional Transport
Authority. Rule 105 of the said Rules of 1989, on the other
hand, recognises the power of the State Transport Authority
or Regional Transport Authority, within its respective region,
to introduce or augment stage-carriage services having
regard to the needs of the commuting public and the
requirement of an efficient means of service, subject to the
prescribed procedure. The legislative intention is thus
plainly not to freeze a route alignment for all time. Public
transport is inherently a regulatory field in which the
competent authority must retain the ability to adjust routes
to
meet
changing
traffic
conditions,
commuting
requirements, public convenience and considerations of
efficient transport administration. The Division Bench
judgment in Secretary, Route No. 56 Bus Association
(supra) is instructive in this context. The controversy there
involved an altered route which partially overlapped another
existing route owing to the closure of a portion of the earlier
alignment. The Division Bench recognised the competence of
the transport authorities to make an appropriate route
arrangement having regard to traffic and public transport
considerations. The principle emerging from the said
decision is that the transport regulatory power cannot be
understood in an excessively rigid manner divorced from the
practical requirements of public transport. The said
principle is further reinforced by Rule 105 of the West
Bengal Motor Vehicles Rules, which expressly places the
need of the commuting public and provision of an efficient
means of service in the forefront of route administration.
33)
It is necessary, however, to make one further aspect clear.
The fact that the resolution is characterised as for extension
of the route, does not, by itself, dispense with the statutory
requirements of Section 80(3). The Division Bench in Arup
Kumar Ghosh (supra) has made it clear that the expression
‗variation‘ or ‗extension‘ cannot be divorced from the
statutory conditions accompanying such exercise and that
public convenience is a paramount consideration under
Section 80(3). The question, therefore, is not whether the
RTA could ever extend the alignment of an existing route—it
plainly could do so within the statutory framework—but
whether the particular extension resolved upon on February
9, 2010 was within the statutory limits and whether the
competent authority had proceeded upon the considerations
mandated by law. The resolution records that the RTA had
received the NOC from RTA, South 24-Parganas and
expressly made the proposed extension subject to the
necessary approval of the Transport Department. The
subsequent governmental approval, if any, and the
materials accompanying the same are consequently relevant
for determining whether the statutory safeguards stood
satisfied. In the absence of a demonstrated violation of the
twenty-four-kilometre ceiling, or a demonstrated failure to
consider public convenience and the statutory question
whether a separate permit was expedient, the Court cannot
convert an otherwise permissible extension of an existing
route into an act of creation of a new route merely because
the altered alignment substantially changed the eastern
terminus of the service.
34)
The reliance of the petitioners in WPA 12778 of 2023 upon
the Government notification restricting creation of new
routes in the central business areas of Kolkata and Howrah
also does not assist them. The prohibition against creation
or formulation of a new route cannot logically be converted
into a prohibition against alteration of an existing route. The
object of the policy was to prevent proliferation of new
routes and consequent traffic and operational difficulties in
the specified areas; it cannot be read as requiring an
existing route to remain permanently confined to an
alignment which the competent authority, in exercise of its
statutory regulatory function, has subsequently altered.
Indeed, to accept the petitioners' construction would
produce the anomalous consequence that an authority
competent to regulate an existing stage-carriage service
would be powerless to rationalise its alignment merely
because one end of the route has been altered, even where
such alteration is found necessary in public interest.
35)
There is another aspect of the matter which deserves
emphasis. The petitioners themselves were granted permits
only in the years 2015, 2016 and 2018, namely several
years after the resolution dated February 9, 2010. The
record therefore does not disclose any pre-existing
contractual or statutory right in their favour which had
accrued prior to the alteration of the route. Their permits
were consequently granted in a regulatory environment in
which the resolution dated February 9, 2010 already
existed. The fact that the petitioners were subsequently
furnished with fare charts or permit endorsements reflecting
the earlier alignment may raise an administrative issue
concerning implementation, but it cannot by itself repeal or
render non-existent an earlier decision of the competent
transport authority. An administrative act inconsistent with
an operative statutory or regulatory decision cannot acquire
superior legal efficacy or standard, merely by repetition. The
argument founded upon long continuation of operation on
the old alignment is thus untenable. A permit-holder cannot
acquire, by continued user alone, a right to disregard a
subsequently notified route alignment. The principle is
elementary, that is, practice cannot amend law;
administrative inaction cannot confer a statutory
entitlement contrary to the governing instrument; and
repeated tolerance of an irregularity cannot transform the
irregularity into legality. If the route had been validly altered
on February 9, 2010, the petitioners' (WPA 12778 of 2023)
right to operate thereafter had to be tested with reference to
the route alignment then legally governing Route No. 39A/2.
Their continued operation upon the superseded alignment
could not constitute a source of right to that alignment,
addressing the same only, to be the existing permit
conditions to be followed by them. Even the plea of
legitimate expectation cannot be invoked to compel a public
authority to continue an arrangement contrary to law or to
prevent it from discharging its statutory regulatory function.
At the highest, legitimate expectation may require fairness
in the manner of transition, communication or
implementation; it does not confer a substantive right to
perpetuate an alignment which is no longer the notified
alignment. The distinction between an expectation as to
administrative treatment and an enforceable legal right is
particularly important in a field such as public transport,
where route alignments are necessarily susceptible to
change in public interest.
36)
The contention that the petitioners' individual permits
contain the old alignment and therefore confer a vested right
to continue upon it, is found to be unacceptable. A permit is
a statutory instrument issued within the regulatory
framework of the Motor Vehicles Act. It cannot be construed
in isolation from subsequent lawful orders or route
determinations made by the competent authority. The
permit-holder acquires a right to operate subject to the
route, conditions and regulatory regime lawfully governing
the permit. A permit cannot be treated as a conveyance of
an immutable proprietary right in a particular road
alignment. The Supreme Court in Mithilesh Garg (supra)
emphasised the liberalised scheme of the 1988 Act and the
public character of the transport system, observing that the
transport system is intended for the benefit and convenience
of the public and that the liberalised policy is directed
towards that object. At the same time, the Court cannot
accept the proposition that Mithilesh Garg (supra) operates
as an absolute bar against every challenge by an existing
operator. The Full Bench of this Court in Prabhat Pan
(supra), authoritatively explained the true scope of
Mithilesh Garg. The Full Bench has held, in substance,
that an existing operator cannot challenge the entry of a
rival merely because the latter's operation may prejudice his
business or commercial interest; but ratio decided in
Mithilesh Garg’s case (supra) cannot be applied to mean
that an existing operator is without remedy against an
illegal act of the authority or the operator.
37)
The submission that the RTA, Kolkata could not have acted
upon the prayer for extension because the result involved
both curtailment and extension also does not merit
acceptance. The statutory scheme must be understood in
substance and not by isolating a single word used in an
administrative resolution. The authority was called upon to
regulate the alignment of an existing stage-carriage service.
The fact that, for operational purposes, one segment was
discontinued while another segment was introduced does
not, by that circumstance alone, convert the exercise into
the formulation of a new route. The Court must examine
whether the authority has departed from the identity of the
existing service and created an unrelated route or whether it
has modified the line of travel of an existing service. The
route map answers that question in favour of the latter.
38)
The statutory power of the RTA cannot be viewed
independently of public convenience. The Motor Vehicles Act
and the Rules constitute a regulatory code intended to
secure an orderly and efficient system of public
transportation. Section 80(3) of the said Act itself makes
public convenience a statutory consideration in relation to
permissible variation or extension. The West Bengal Rules
similarly recognise the needs of the commuting public and
efficient service as considerations governing route
administration. A construction which makes the authority
incapable of responding to changed traffic patterns or public
requirements, despite the statutory recognition of such
considerations, would defeat rather than advance the
legislative object.
39)
It is also material that the prayer for extension of Route No.
39A/2 had been made as far back as September 18, 2006
and was considered by the RTA before the petitioners in
WPA 12778 of 2023 obtained their permits in 2015, 2016
and 2018. The resolution dated February 09, 2010 was
therefore not an ad hoc decision suddenly directed against
the present petitioners. The decision substantially preceded
their entry into the field. The subsequent resolution dated
April 12, 2023, therefore, cannot be characterised as an act
which created the altered route for the first time. Its
essential purpose was to give operational effect to the
alignment already determined earlier. The challenge to the
2023 resolution must consequently fail once the validity of
the underlying 2010 decision is upheld. The argument
based upon the absence of counter-signature under Section
88 of the Act also does not advance the petitioners' case
beyond the statutory framework. Section 88 becomes
material where a permit or operation extends into the
jurisdiction of another Regional Transport Authority and the
statutory requirements relating to inter-regional operation
are attracted. Rule 104 of the West Bengal Motor Vehicles
Rules itself contemplates the concurrence of the concerned
Regional Transport Authority in cases of extension or
variation falling within another region. The mere possibility
that the revised alignment traverses an area falling beyond
the original regional jurisdiction cannot, however,
retrospectively convert the route-alignment decision into the
formulation of an altogether new route. The consequence, if
any, is compliance with the statutory inter-regional
machinery; it does not invalidate the underlying
determination of the alignment merely by nomenclature.
40)
It is therefore found that the resolution dated February 9,
2010 cannot be characterised as an unauthorised creation
of a new route merely because it curtailed the portion
between Kohinoor Market and Picnic Garden (VIP Bazar)
and carried the alignment from the No. 4 Bridge/Darga
Road area through Topsia and Leather Complex towards
Bhojer Hat. The map demonstrates that the altered
alignment retained the substantial existing corridor and
altered the line of travel at the relevant point. The legal
identity of Route No. 39A/2 was not thereby extinguished
and replaced by an unrelated route. The contention that
such action was beyond the jurisdiction of the RTA, Kolkata
is, accordingly, rejected.
41)
This brings the Court to WPA 16629 of 2023. The petitioners
therein are operators of Route No. S-128 and S-128/1 and
complain of overlapping operation by the petitioners in WPA
12778 of 2023. Their grievance, however, is founded upon
the assumption that the operators of Route No. 39A/2, by
continuing upon the old alignment, have created an
unlawful overlap with their route. The route diagram placed
at paragraph 23 of the record requires the objection to be
examined carefully. It depicts Route S-128 and the postFebruary 09, 2010 alignment of Route 39A/2 and identifies
the common corridor. The very existence of that common
corridor, however, cannot by itself establish illegality. What
has to be established is that the operation complained of is
contrary to the legally prescribed alignment of Route 39A/2.
The argument of the petitioners in WPA 16629 of 2023 that
the alleged overlap would disappear, only if the changed
alignment of Route No. 39A/2 is followed, cannot be
accepted. The alleged change in Route No. 39A/2 cannot be
employed as the legal yardstick for determining the validity
of the alignment of Route No. 39A/2. The two route
alignments are separate regulatory matters. More
importantly, the common stretch between the concerned
points is not a phenomenon brought into existence merely
because of the subsequent alteration complained of in
respect of Route No. 39A/2. The route diagram
demonstrates that the relevant common corridor existed
even prior to the alleged later change in Route No. 39A/2.
Consequently, the supposed overlap cannot logically be
attributed to the failure to follow the later alignment of
Route No. 39A/2. The objection therefore suffers from a
basic factual and causal infirmity. The distinction is
therefore between overlap which is legally sanctioned by the
respective route alignments and unauthorised operation
beyond the route for which the permit has been granted.
The former is not rendered illegal merely because it causes
commercial competition; the latter would plainly attract the
statutory consequences applicable to violation of permit
conditions. On the material presently before this Court, the
petitioners in WPA 16629 of 2023 have failed to establish
that the alleged common stretch is itself outside the legally
permissible alignment of Route No. 39A/2. The route
diagram, rather than supporting their contention,
demonstrates that the common portion forms part of the
respective
route
alignments
independently
of
the
subsequent alteration alleged in Route No. 39A/1.
42)
The principle stated by the Supreme Court in Subhash
Chandra and others (supra), that the conditions attached
to a permit are intended to regulate the operation of
transport services and that the regulatory conditions are not
matters left to the individual convenience of an operator, is
relevant to this aspect. Route alignment is a regulatory
condition designed not merely for the convenience of an
individual operator but for the orderly movement and
convenience and safety of the travelling public. That
principle, however, cuts both ways. It means that the
operators of Route No. 39A/2 must follow the legally
operative alignment; it does not mean that the operators of
Route S-128 acquire a right to insist upon a particular
alignment of Route 39A/2 merely because portions of the
two routes overlap. The law stated in Mithilesh Garg
(supra) also has relevance here, but only to the extent of
recognising that the transport system is intended to serve
the public and that competition or overlapping operation, by
itself, does not constitute infringement of a vested right of
an existing operator. The Supreme Court rejected the
contention that existing operators have a right to exclude
other operators merely because their entry may affect the
existing operator's business. The Full Bench in Prabhat
Pan (supra) subsequently clarified that the protection of
Mithilesh Garg (supra) is not a licence for an authority to
act illegally. But that qualification does not assist the
petitioners in WPA 16629 of 2023 because, on the merits,
no illegal route operation has been established merely by
demonstrating an overlap.
43)
The distinction is therefore between overlap which is legally
sanctioned by the respective route alignments and
unauthorised operation beyond the route for which the
permit has been granted. The former is not rendered illegal
merely because it causes commercial competition; the latter
would plainly attract the statutory consequences applicable
to violation of permit conditions. On the material presently
before this Court, the petitioners in WPA 16629 of 2023
have failed to establish that the alleged common stretch is
itself outside the legally permissible alignment of Route No.
39A/2. The route diagram, rather than supporting their
contention, demonstrates that the common portion forms
part of the respective route alignments independently of the
subsequent alteration alleged in Route No. 39A/2. It follows
that the complaint of the petitioners in WPA 16629 of 2023
cannot be sustained merely on the basis of commercial
overlap. The decision in Prabhat Pan (supra) does not
authorise an existing operator to secure judicial exclusion of
another operator merely because their operations intersect.
It only preserves the right to question an illegal act. Since no
such illegality has been established in the present case, the
substantive foundation of WPA 16629 of 2023 is absent.
There is, therefore, no necessity to decide the matter on the
narrower ground of locus standi alone. Indeed, such an
approach would not accurately reflect the law declared in
Prabhat Pan (supra). The appropriate conclusion is that
although the petitioners in WPA 16629 of 2023 were entitled
to bring their grievance regarding an alleged illegal operation
before the appropriate authority and, in an appropriate
case, before the Court, the grievance must fail on merits
because the alleged illegality has not been established.
44)
On the other hand, the challenge in WPA 12778 of 2023
presents a somewhat different question. The petitioners
there undoubtedly have a commercial and operational
interest in the old alignment, and their individual permits
contain references which, according to them, continued to
reflect the pre-February 9, 2010 alignment. Such
circumstances may explain why they continued to operate
on the old route. They cannot, however, supply legal
justification for continuing an operation which is
inconsistent with the route alignment validly determined by
the competent authority. A continued course of conduct,
even if known to the authority, cannot repeal a lawful
regulatory decision. If the petitioners considered the 2010
decision invalid, the appropriate course was to challenge it
in accordance with law. What they could not do was to treat
its alleged non-implementation as equivalent to its legal
extinction. Equally, the fact that the authorities may have
issued fitness certificates, collected taxes or permitted the
vehicles to operate on the earlier alignment does not amount
to an adjudication that the old alignment remained legally
operative. Such administrative acts are necessarily referable
to the statutory framework and cannot be treated as an
implied repeal of the resolution dated February 09, 2010.
The petitioners' argument, if accepted, would lead to the
undesirable proposition that the longer an authority
tolerates an incorrect mode of operation, the stronger
becomes the operator's right to continue it. Such a
proposition would invert the relationship between
administrative practice and statutory authority.
45)
The Court is not unmindful of the submission that Section
68(3)(ca) of the Act of 1988 reserves route formulation to the
Government. That provision is important and must be
respected. But precisely because it must be respected, the
Court has examined whether the impugned decision
amounts to formulation of a new route. For the reasons
already recorded, it does not. The existing Route No. 39A/2
remained the subject of regulation; its alignment was altered
in the manner shown in the route diagram. The statutory
power to regulate, vary and extend an existing stagecarriage service cannot be equated with the power to
formulate an entirely new route. This construction
harmonises Section 68(3)(ca) with Section 80(3) of the
statute and the relevant provisions of the West Bengal Motor
Vehicles Rules, rather than rendering any of them otiose.
The interpretation advanced by the petitioners, on the other
hand, would make the statutory provisions permitting
variation and extension practically incapable of operation
wherever the alteration is substantial. The decision of the
Division Bench in Secretary, Route No. 56 Bus
Association (supra) also illustrates why the Court should
not approach the question by an excessively formalistic
distinction between a route and its alignment. There, too,
the transport authority was required to respond to an
altered traffic situation and the arrangement involved
overlapping with another existing route. The Division Bench
recognised the competence of the transport authorities to
determine an appropriate transport arrangement having
regard to traffic and public transport considerations. The
present case stands on an even clearer footing because the
alteration under consideration was not shown to be an
accidental or informal departure by individual operators but
originated in a resolution of the competent transport
authority following a prior prayer for extension.
46)
The Court therefore holds that the petitioners in WPA 12778
of 2023 do not possess a vested or accrued right to continue
plying on the pre-February 09, 2010 alignment merely
because their permits were subsequently issued with
references to that alignment or because they were permitted
to operate thereon for a period of time. Their right is to
operate in accordance with the route alignment lawfully
governing Route No. 39A/2. Their objection to the resolution
dated February 9, 2010, founded on alleged creation of a
new route, is rejected. Their consequential challenge to the
resolution dated April 12, 2023 must also fail, since the
latter cannot be invalidated merely for giving effect to an
alignment which had already been determined by the earlier
resolution. The challenge, however, is not rejected on the
ground that an existing operator has no right whatsoever to
question an action of the transport authority. Such a
proposition would be inconsistent with the Full Bench
decision in Prabhat Pan (supra). The challenge is rejected
because, upon examination, the impugned action is not
shown to be an illegal formulation of a new route, nor has
any statutory prohibition been demonstrated which
rendered the RTA, Kolkata incompetent to regulate the
alignment of the existing Route No. 39A/2 in the manner
complained of.
47)
For the foregoing reasons, I find no ground to interfere with
the resolution of the RTA, Kolkata dated February 9, 2010.
The challenge to the subsequent resolution dated April 12,
2023, which seeks to implement the altered alignment in the
permits of the concerned operators, also fails. The
petitioners in WPA 12778 of 2023, therefore, cannot claim a
legal entitlement to continue plying over the superseded
alignment from Kohinoor Market to Picnic Garden (VIP
Bazar), contrary to the route alignment determined by the
competent authority.
48)
WPA 16629 of 2023 is equally liable to fail. The petitioners
therein have not established that the operation complained
of constitutes an unauthorised overlap arising from noncompliance with the altered alignment of Route No. 39A/2.
The common stretch identified in the route diagram existed
independently of the alleged subsequent alteration of Route
No. 39A/2 and cannot be treated as an illegality attributable
to the operators of Route No. 39A/2. The mere fact of
overlapping routes, without proof of operation outside the
legally sanctioned alignment, furnishes no ground for
interference under Article 226 of the Constitution.
49)
WPA 16629 of 2023 is, accordingly, liable to be dismissed
and is hereby dismissed.
50)
For the reasons recorded hereinabove, the challenge put
forth by the petitioners in WPA 12778 of 2023 to the
resolutions of the Regional Transport Authority, Kolkata
dated February 09, 2010 and April 12, 2023 is found to be
unsustainable. The said writ petition is, accordingly,
dismissed.
51)
Urgent certified copy of this judgment, if applied for, be
supplied to the parties upon compliance with all requisite
formalities.
(Rai Chattopadhyay, J.)
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review