Full Judgment Text
Text read from the judgment PDF published on the High Court's eCourts portal, through the
Indian High Court Judgments open data set (Dattam Labs,
CC BY 4.0).
The court's own copy is the authoritative text.
APHC010420592026
IN THE HIGH COURT OF ANDHRA PRADESH
AT AMARAVATI
(Special Original Jurisdiction)
WEDNESDAY, THE 23rd DAY OF SEPTEMBER 2026
PRESENT
THE HONOURABLE SRI JUSTICE VENKATESWARLU NIMMAGADDA
WRIT PETITION NO: 22719 OF 2026
Between:
1. G MOHAN KUMAR, S/o G Nagaveni, Aged about 41 years, Occ IT Employee,
R/o.No.8-2, Pullur Cross Road Village,
Srirangarajapuram Mandal, Chittor
District -517167
...Petitioner
AND
1. THE STATE OF ANDHRA PRADESH, Rep., by its Principal Secretary,
Energy Department, Secretariat Building, Velagapudi,
Amaravathi, Guntur
District.
2. The Andhra Pradesh Southern Power Distribution Company Ltd APSPDCL,
Rep., by its Chairman and Managing Director, O/o. 19-13-65/A, Srinivasapuram,
Tiruchanoor Road, Chittoor, Andhra Pradesh.
3. The Superintending Engineer, Operations, Chittoor, Circle, APSPDCL,
Chittoor, Chittoor District.
4. The Executive Engineer, Operations Chittoor Division, APSPDCL, Chittoor
District.
5. The Assistant Engineer, Operations, SR Puram Sub- Division, APSPDCL,
Chittoor District.
...Respondents
Petition under Article 226 of the Constitution of India praying that in the
circumstances stated in the affidavit filed therewith, the High Court may be
pleased toissue an appropriate Writ, Order or direction more particularly one in
the nature of Writ of Mandamus declaring the action of the respondent Nos. 3 to
5 in shifting 11 KV in electric service pole from existing R and B land adjacent to
Chittor-Puttoor Road to proposed/marked place which narrowing down the 10
feet existing road by obstructing petitioner pathway and ingress and egress to
the
main
road
to
Chittor-Puttor
Road,
Pullur
Cross
Road
Village,
Srirangarajapuram Mandal, Chittor District, that to without maintaining standard
of safety distance for moving of motor vehicles i.e., tractors to agricultural field
as well as plots existing, eventhough, there is an abundant alternative place
available for shifting the same in R and B site by the respondent Nos.3 to 5,
without assigning any valid reasons, as arbitrary, illegal, unjust, violative of the
provisions and procedure prescribed under the Electricity Act, 2003, the rules
made thereunder and the General Terms and Conditions of Power Supply and
violative of Articles 14, 21 and 300-A of the Constitution of India
and
consequentially to direct the respondent No.5 not to shift 11 KV in Lower
Tension (LT) Cat-V electric Pole from existing R and B land adjacent to ChittorPuttoor Road to proposed/marked place which is narrowing down 10 feet
existing road by obstructing petitioner pathway and ingress and egress to the
main road to Chittor-Puttor Road, Pullur Cross Road Village, Srirangarajapuram
Mandal, Chittor Distric
IA NO: 1 OF 2026
Petition under Section 151 CPC praying that in the circumstances stated in
the affidavit filed in support of the petition, the High Court may be pleased stay all
further proceedings including shifting 11 KV in Lower Tension (LT) Cat-V elebtric
Pole
from
existing
R&B
land
adjacent
to
Chittor-Puttoor
Road
to
proposed/marked place which narrowing down 10 feet existing road by
obstructing petitioner pathway and ingress and egress to the main road to
Chittor-Puttor Road, Pullur Cross Road Village, Srirangarajapura m Mandal,
Chittor District, pending disposal of the above Writ Petition
Counsel for the Petitioner: RAVITEJA TALASEELA
Counsel for the Respondents: VENKATA RAMA RAO KOTA SC FOR
APSPDCL Counsel for the Respondents:GP FOR ENERGY
The Court made the following order:
THE HON’BLE SRI JUSTICE VENKATESWARLU NIMMAGADDA
WRIT PETITION NO: 22719 OF 2026
ORDER:
The present Writ Petition is filed under Article 226 of the Constitution of India
seeking following relief:
“to issue writ, order or direction more particularly one in
the nature of Writ of Mandamus declaring the action of the
respondent Nos.3 to 5 in shifting 11 KV in electric service pole from
existing
R&B
land
adjacent
to
Cittor-Puttor
Road
to
proposed/marked place which narrowing down the 10 feet existing
road by obstructing petitioner pathway and ingress and egress to the
main road to Chittor-Puttor Road, Pullur Cross Road Village,
Srirangarajapuram
Mandal,
Chittor
District,
that
to
without
maintaining standard of safety distance for moving of motor vehicles
i.e. tractors to agricultural field as well as plots existing, eventhough,
there is an abundant alternative place available for shifting the same
in R&B site by the respondent Nos.3 to 5, without assigning any
valid reasons, as arbitrary, illegal, unjust, violative of the provisions
and procedure prescribed under the Electricity Act, 2003, the rules
made thereunder and the General Terms and Conditions of Power
Supply and Violative of Articles 14,21 and 300-A of the constitution
of India, for the facts and circumstances stated hereunder.”
2.
Heard learned counsel for the petitioner and learned Standing
Counsel for the respondents.
3.
The case of the petitioner herein is that the petitioner is an absolute
owner and possessor of the property of residential building (G+1) house
bearing D.No.8-2, Pullur Cross Road Village, Srirangarajapuram Mandal,
Chittor District. While so, the petitioner left over an approach road for his
ingress and egress to his house from the main road with the width about
10 feet from Chittor-Puttoor main road. While things stood thus, the
respondent No.5 visited and verified the 10 feet approach road of the
petitioner with an intention to lay electric pole with a load of 11-KV which is
abetting to the 10 feet subject approach road of the petitioner’s land.
4.
Learned Counsel for the petitioner submits that if such a pole is
erected, the width of the road would be reduced and that there has been
much in-convenience for ingress and egress of vehicles since it is only 10
feet width. For which the petitioner submitted his objections to the
respondent No.5, who visited and verified the land to find out suitable
locality / place for erection of electric pole. Finally he selected location out
of this road area to erect the subject electric pole with a load of 11-KV.
Ignoring the objections of the petitioner and the respondents are
proceeding further for shifting the said electric pole from the road margin of
the Chittor-Puttoor road to his subject area. He further submits that in view
of the directions of Vidyut Ombudsman vide order dated 26.05.2026 in
respect of representation No. 36 of 2025/26 filed by Dorbabu Jonna
Reddy, that the respondents cannot restrict the road area for their common
ingress and egress of the petitioner and others is contrary to law. Hence
the writ petition.
5.
On the other hand, learned Standing Counsel furnished written
instructions on 09.08.2026 wherein it is stated that:
“In compliance with the above order, necessary action
was initiated by this department for execution of the pole shifting
work. The proposed shifting location was required to be identified
and marked properly in coordination with the Revenue authorities,
as the location falls in the road portion/ R&B site. The Hon’ble Vidyut
Ombudsman order itself records that the proposed shifting location
was in the road portion belonging to the R&B Department.
Accordingly, necessary arrangements were made for
execution of the pole shifting work. However, at the time of taking up
the work, Sri.G.Mohana Kumar, S/o. G.Nagaveni, aged about 41
years, Occupation: IT Employee, R/o. D.No.8-2, Pullur Cross Road
Village, Srirangarajapuram Mandal, Chittor District - 517167,
objected to the proposed pole shifting work.
Due to the objection raised by Sri.G. Mohan Kumar at
the site, the execution of the pole shifting work was HOLD.”
6.
Learned Standing Counsel further submits that in view of the
directions of the Vidyut Ombudsman, the respondents are taking steps for
shifting and erecting the electric pole which is situated within the road
margin of Chittor-Puttoor road to some other place which is nearest and
technically suitable to the present place of the pole. He further submits that
so far the exact location for erection of shifting pole is not identified
particularly, and the contention of the petitioner is that the proposal for
erection of said electric pole is within the limits of his approach road cannot
be considered, as there are no proceedings for identification of land for
shifting the subject pole as per the complaint made before the said Vidyut
Ombudsman.
7.
Considering the submissions made by the learned Counsel of the
petitioner and the learned Standing Counsel for the respondents and after
perusing the material available on record, it is observed that the existing
electric pole which was sought for shifting from the subject place is
situated within the road margin of Chittor-Puttoor highway. Therefore, this
subject pole is within the public premises, but not in any individual place. In
view of the orders of the Vidyut Ombudsman dated 26.05.2026, the
respondents are under the statutory obligation to take steps for shifting of
the subject pole to other place, after identifying the suitable place which
may not cause any in-convenience to the public at large. It is further
observed that to get rid of the in-convenience caused as claimed by the
complainant before the Vidyut Ombudsman, the authorities cannot be
permitted to cause much inconvenience to other public while shifting and
erecting the subject pole. Being the public authority, the respondents take
all pros and cons and verify the land nearby physically and come to a
conclusion that whether the subject land is suitable for erection or not and
in compliance of the orders of the Vidyut Ombudsman.
8.
In view of the reasons stated above, Therefore this court is of the
opinion that the present writ petition can be disposed of directing the
respondent Nos. 3 to 5 herein to identify and verify the suitable land for
erection of said electric pole. After having thorough enquiry in the presence
of the petitioner as well as the complainant before the Vidyut Ombudsman,
the respondents shall proceed for shifting of the said pole as per the
directions of Vidyut Ombudsman in accordance with law.
9.
With the above directions, the Writ Petition is disposed of.
There shall be no order as to costs.
As a sequel, miscellaneous petitions, if any, pending shall stand closed.
__________________________________
VENKATESWARLU NIMMAGADDA, J
23.09.2026
PVS/BAK
HON’BLE SRI JUSTICE VENKATESWARLU NIMMAGADDA
WRIT PETITION NO: 22719 OF 2026
23.09.2026
PVS/BAK
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?