C/CA/4893/2024
ORDER DATED: 27/11/2025
IN THE HIGH COURT OF GUJARAT AT AHMEDABAD
R/CIVIL APPLICATION (FOR CONDONATION OF DELAY) NO. 4893 of
In F/CIVIL REVISION APPLICATION NO. 26323 of 2024
==========================================================
DY. COLLECTOR AND SPECIAL LAND ACQUISITION OFFICER
(NARMADA PROJECT) & ANR.
Versus
PATEL PRAHLADBHAI SHANKARDAS
==========================================================
Appearance:
MS NIDHI VYAS, AGP for the Applicants
RAHUL S SHAH(9701) for the Respondent
==========================================================
CORAM:HONOURABLE MR. JUSTICE J. C. DOSHI
Date : 27/11/2025
ORAL ORDER
1.
The present application, invoking Section 5 of the
Limitation Act, 1963, seeks condonation of an inordinate delay
of 5525 days in preferring the captioned CRA.
2.
Factual matrix of the case are as under:-
2.1
That on 22.09.2005, Respondent has )led executive
Application being regular Execution Application No. 284 of
2005 in LAR NO. 805 of 1998 and )led execution application
as per under section 28 aggregate amount of Rs. 3,50,000/including
additional
compensation,
amount of price increase.
30%
Solatium,
12%
C/CA/4893/2024
2.2
ORDER DATED: 27/11/2025
That on 11.05.2007, the learned Principal Senior Civil
Judge has allowed Execution Petition directing Applicant
State to pay a sum of Rs. 3,50,056/-.
been o6ice of Applicants.
Said order has never
Even, no legal opinion has
forwarded vide o6ice of Deponent till 14.02.2022.
2.3
That on 24.09.2013, the same was answered to Civil
Court, Kadi. On 29.11.2023 learned District Government
Pleader has forwarded the summons issued in regular
Execution No. 13 of 2013 issued by Civil Court, Kadi.
2.4
That on 14.02.2022, the learned Civil Court, Kadi has
passed impugned order directing Applicant State to deposit
the amount of Rs. 3,50,056/- and Application was )led was
certi)ed copy of Execution Petition as well as order passed
where under.
2.5
That on 10.03.2022, the certi)ed copies were received.
That
on 11.03.2022, proposal was forwarded to Narmada
Water Resources Water Supply and Kalpsar Department,
State of Gujarat. On 01.04.2022 Narmada Water Resources
Water Supply and Kalpsar Department, State of Gujarat
sought for further details.
On 22.04.2022, legal opinion of
learned District Government Pleader was sought. The same
was forwarded to the Department on 25.04.2022. That on
30.04.2022, certain quarry raised by the Narmada Water
Resources Water Supply and Kalpsar Department. The query
was replied by O6ice of Department on 11.05.2022. On
27.05.2022
the
Department.
On
proposal
was
01.09.2022
forwarded
legal
to
the
Department
Legal
granted
C/CA/4893/2024
ORDER DATED: 27/11/2025
permission to )le Revision Application. The same was
forwarded to the o6ice of Deponent on 03.09.2022.
2.6
The o6ice of the Government Pleader, High Court of
Gujarat assigned the drafting of CRA to the concerned
Assistant Government Pleader, who in turn called the o6icers
for discussion and after discussing the same drafted the CRA
alongwith application of condonation of delay.
2.7
Hence, present application for condonation of delay.
3.
Learned
AGP
Ms.
Nidhi
Vyas
appearing
for
the
applicants in line of the ground stated in the application
submitted that the )le has travelled di6erent tables and which
ultimately, comes to the table of the o6ice of the Government
Pleader in the High Court of Gujarat. It is explained in the
petition and therefore, it is submitted that since su6icient
cause has been explained by the State Government and
therefore, delay may be condoned. She would further submit
that 6% interest was charged upon the interest by the learned
Executing Court while executing the judgment and award
passed by the Tribunal under the Land Acquisition Act. She
would further submit that charging of 6% interest upon the
interest already granted by the learned Tribunal under land
reference proceedings is an issue, which is raised in the CRA
intended to be )led. However, delay of 5525 days has been
caused. She would further submit that the learned Executing
Court cannot go beyond the decree and charge interest upon
the interest.
C/CA/4893/2024
3.1
ORDER DATED: 27/11/2025
Merely upon above submission, learned AGP prays to
allow this application by condoning he delay and to register
the CRA.
4.
Learned advocate Mr.Shah appearing for the respondent
did not appear despite last chance was granted by previous
order.
5.
The factual assertion, which is stated in the foregoing
paras are the main reasons stated to condone huge and
colossal delay of 5525 days.
6.
As far as delay has been sought to be condoned, under
Section 5 of the Limitation Act, 1963, let refer section 5 as
under:“5. Extension of prescribed period in certain
cases.—
Any appeal or any application, other than an
application under any of the provisions of Order
XXI of the Code of Civil Procedure, 1908 (5 of
1908), may be admitted after the prescribed
period, if the appellant or the applicant satis)es the
court that he had su6icient cause for not preferring
the appeal or making the application within such
period.
Explanation.—The fact that the appellant or the
applicant was misled by any order, practice or
judgment of the High Court in ascertaining or
computing the prescribed period may be su6icient
cause within the meaning of this section.”
7.
The
applicants
were
obliged
to
satisfactorily
demonstrate and explicate the colossal delay and to convince
C/CA/4893/2024
ORDER DATED: 27/11/2025
the Court that su6icient cause existed for not preferring the
appeal / application or moving the requisite application within
the statutorily prescribed period. Ordinarily, the Courts adopt
a
liberal
approach
while
considering
applications
for
condonation of delay under Section 5 of the Limitation Act,
provided that the delay is duly attributable to su6icient cause.
Delay cannot be condoned by a mere invocation of “liberal
approach,”
“justice-oriented
approach,”
or
“substantial
justice.” These oft-quoted expressions cannot be deployed to
jettison or emasculate the substantive law of limitation.
8.
Rule of limitation is based upon principles of sound
public policy and principles of equity.
Indeed expression
'su6icient cause' should receive liberal construction so as to
advance substantial justice. This proposition comes into
picture when no negligence or inaction or want of bona )de is
imputable to party seeking condonation of delay. Whether
explanation furnished would constitute 'su6icient cause' or
not will depend on facts of each case and there cannot be
straitjacket formula for accepting or rejecting explanation
furnished for delay caused in taking steps. While considering
the matter, the Court is also required to consider all the fact
that why party has not taken steps within time prescribed.
The Court should not lose sight of the fact that by not taking
steps within the time prescribed time, valuable right has
accrued to other party which should not lightly be defeated by
condoning delay in routine like manner.
9.
Theory of liberal approach should be adjudicated on
C/CA/4893/2024
ORDER DATED: 27/11/2025
theory of due diligence. In the present case, length of delay is
5525 days. It is quite long delay and on going through
application as well as arguments, it remains unexplained.
They are propelled by the applicants, it does not seem to be
germane one and none of the reasons prevented the
applicants from )ling CRA within time period.
It is to be
remembered that pleadings and reasons are not backed out by
any documentary evidence.
10.
According to this Court, the applicants have failed to
establish any su6icient reasons which has prevented him to
)le CRA within stipulated time period.
11.
In
Lanka
Venkateswarlu
v/s.
State
of
Andhra
Pradesh [AIR 2011 SC 1199], the Hon'ble Supreme Court
has observed as under :-
"Generally the Courts including Supreme Court adopt a
liberty approach in considering application for
condonation of delay on ground of su6icient cause under
section 5 of the Act. However, the concept such as
"liberal
approach",
justice
oriented
approach,
"substantial justice" cannot be employed to jettison the
substantial law of limitation."
12.
The Hon'ble Supreme Court in the case of Union of
India v/s. Jahangir Byramji Jeejeebhoy [2024 (2) GLH
217], after surveying earlier judgments in para 33 and 35 has
held as under :-
"33. In the case of Esha Bhattacharjee v/s. Managing
committee of Raghunathpur Nagar Academy (2013)
C/CA/4893/2024
ORDER DATED: 27/11/2025
12 SCC 649, this Court made the following observations
:21. From the aforesaid authorities the principles that
can broadly be culled out are:
21.1. (i) There should be a liberal, pragmatic, justiceoriented, non-pedantic approach while dealing with an
application for condonation of delay, for the courts are
not supposed to legalise injustice but are obliged to
remove injustice.
21.2. (ii) The terms su&icient cause should be
understood in their proper spirit, philosophy and
purpose regard being had to the fact that these terms
are basically elastic and are to be applied in proper
perspective to the obtaining fact-situation.
21.3. (iii) Substantial justice being paramount and
pivotal the technical considerations should not be given
undue and uncalled for emphasis.
21.4. (iv) No presumption can be attached to deliberate
causation of delay but, gross negligence on the part of
the counsel or litigant is to be taken note of.
21.5. (v) Lack of bona -des imputable to a party seeking
condonation of delay is a signi-cant and relevant fact.
21.6. (vi) It is to be kept in mind that adherence to strict
proof should not a&ect public justice and cause public
mischief because the courts are required to be vigilant
so that in the ultimate eventuate there is no real failure
of justice.
21.7. (vii) The concept of liberal approach has to
encapsulate the conception of reasonableness and it
cannot be allowed a totally unfettered free play.
21.8. (viii) There is a distinction between inordinate
delay and a delay of short duration or few days, for to
the former doctrine of prejudice is attracted whereas to
the latter it may not be attracted. That apart, the -rst
one warrants strict approach whereas the second calls
for a liberal delineation.
21.9. (ix) The conduct, behaviour and attitude of a party
relating to its inaction or negligence are relevant factors
to be taken into consideration. It is so as the
fundamental principle is that the courts are required to
weigh the scale of balance of justice in respect of both
parties and the said principle cannot be given a total go
C/CA/4893/2024
ORDER DATED: 27/11/2025
by in the name of liberal approach.
21.10. (x) If the explanation o&ered is concocted or the
grounds urged in the application are fanciful, the courts
should be vigilant not to expose the other side
unnecessarily to face such a litigation.
21.11. (xi) It is to be borne in mind that no one gets away
with fraud, misrepresentation or interpolation by taking
recourse to the technicalities of law of limitation.
21.12. (xii) The entire gamut of facts are to be carefully
scrutinised and the approach should be based on the
paradigm of judicial discretion which is founded on
objective reasoning and not on individual perception.
21.13. (xiii) The State or a public body or an entity
representing a collective cause should be given some
acceptable latitude.
22. To the aforesaid principles we may add some more
guidelines taking note of the present day scenario. They
are:
22.1. (a) An application for condonation of delay should
be drafted with careful concern and not in a haphazard
manner harbouring the notion that the courts are
required to condone delay on the bedrock of the
principle that adjudication of a lis on merits is seminal to
justice dispensation system.
22.2. (b) An application for condonation of delay should
not be dealt with in a routine manner on the base of
individual philosophy which is basically subjective.
22.3. (c) Though no precise formula can be laid down
regard being had to the concept of judicial discretion,
yet a conscious e&ort for achieving consistency and
collegiality of the adjudicatory system should be made as
that is the ultimate institutional motto.
22.4. (d) The increasing tendency to perceive delay as a
non-serious matter and, hence, lackadaisical propensity
can be exhibited in a nonchalant manner requires to be
curbed, of course, within legal parameters.
35. In a plethora of decisions of this Court, it has been
said that delay should not be excused as a matter of
generosity. Rendering substantial justice is not to cause
prejudice to the opposite party. The appellants have
failed to prove that they were reasonably diligent in
prosecuting the matter and this vital test for condoning
C/CA/4893/2024
ORDER DATED: 27/11/2025
the delay is not satis-ed in this case."
13.
Recently, in Shivamma (Dead) by LRs. v. Karnataka
Housing Board and Others, 2025 SCC OnLine SC 1969,
the Hon’ble Supreme Court, in its aureate enunciation, has
held thus:“257. We also wish to highlight that the High Court
applied the legal position incorrectly in the
impugned order and performed an exercise of
'merithunting'. It gave a prima facie relevance to
the argument of the respondent no. 1 on the
grounds that the suit of the appellant was not at all
maintainable in the -rst place. In paragraph 13 of
the impugned order, the High Court recorded that a
semblance of right in favour of respondent no. 1
swayed its mind to allow the condonation of delay,
and it accepted the same as a 'su&icient cause'. We
hold such observations to be erroneous and ex facie
bad in law. Similar contentions were rejected by
this Court in State of Madhya Pradesh v.
Bherulal, reported in (2020) 10 SCC 654 ,
wherein the appellant-State was seeking a
condonation of delay of 663 days. This Court sternly
noted that it will not let the courts to be forums
wherein the Government can walk-in, when it
desires, entirely ignoring the period of limitation,
and buttress reliance on cases of this Court wherein
it allowed condonation, employing its discretionary
powers, on merits or modalities of peculiarities of
those cases. Relevant paragraphs are extracted
below:
3. No doubt, some leeway is given for the
government ine&iciencies but the sad part is that
the authorities keep on relying on judicial
pronouncements for a period of time when
technology had not advanced and a greater leeway
was given to the Government [...]
C/CA/4893/2024
ORDER DATED: 27/11/2025
xxx xxx xxx
5. A preposterous proposition is sought to be
propounded that if there is some merit in the
case, the period of delay is to be given a go-by.
If a case is good on merits, it will succeed in any
case. It is really a bar of limitation which can
even shut out good cases. This does not, of
course, take away the jurisdiction of the Court
in an appropriate case to condone the delay.
6. We are also of the view that the aforesaid
approach is being adopted in what we have
categorised earlier as 'certi-cate cases'. The
object appears to be to obtain a certi-cate of
dismissal from the Supreme Court to put a
quietus to the issue and thus, say that nothing
could be done because the highest Court has
dismissed the appeal. It is to complete this
formality and save the skin of o&icers who may
be at default that such a process is followed. We
have on earlier occasions also strongly
deprecated such a practice and process. There
seems to be no improvement. The purpose of
coming to this Court is not to obtain such
certi-cates and if the Government su&ers
losses, it is time when the o&icer concerned
responsible
for
the
same
bears
the
consequences. The irony is that in none of the
cases any action is taken against the o&icers,
who sit on the -les and do nothing. It is
presumed that this Court will condone the delay
and even in making submissions, straightaway
the counsel appear to address on merits without
referring even to the aspect of limitation as
happened in this case till we pointed out to the
counsel that he must -rst address us on the
question of limitation.
7. We are thus, constrained to send a signal and
we propose to do in all matters today, where
there are such inordinate delays that the
Government or State authorities coming before
us must pay for wastage of judicial time which
has its own value. Such costs can be recovered
C/CA/4893/2024
ORDER DATED: 27/11/2025
from the
supplied)
o&icers
responsible.'
(Emphasis
258. The length of the delay is a relevant matter
which the court must take into consideration while
considering whether the delay should be condoned
or not. From the tenor of the approach of the
respondents, it appears that they want to -x their
own period of limitation for instituting the
proceedings for which law has prescribed a period
of limitation. Once it is held that a party has lost his
right to have the matter considered on merits
because of his own inaction for a long, it cannot be
presumed to be non-deliberate delay and in such
circumstances of the case, it cannot be heard to
plead that the substantial justice deserves to be
preferred as against the technical considerations.
While considering the plea for condonation of delay,
the court must not start with the merits of the main
matter. The court owes a duty to -rst ascertain the
bona -des of the explanation o&ered by the party
seeking condonation. It is only if the su&icient cause
assigned by the litigant and the opposition of the
other side is equally balanced that the court may
bring into aid the merits of the matter for the
purpose of condoning the delay.
259. We are of the view that the question of
limitation is not merely a technical consideration.
The rules of limitation are based on the principles of
sound public policy and principles of equity. We
should not keep the 'Sword of Damocles' hanging
over the head of the respondent for inde-nite
period of time to be determined at the whims and
fancies of the appellants.
260.
From the above exposition of law, it is
abundantly clear that the High Court has
erroneously condoned a massive delay of 3966 days
on account of certain lapses at the administrative
levels and of there being no follow-ups in the
proceedings, along with -nding certain merits in
C/CA/4893/2024
ORDER DATED: 27/11/2025
the case of the respondent no. 1 against the
maintainability of the suit of the appellant and that
of the relief molded by the First Appellate Court.
We have no hesitation in stating that such grounds
are nowhere near to being “su&icient cause” as per
Section 5 of the 1963 Act. The High Court lost sight
of the fact that the precedents and authorities it
relied upon by it had delays of two-digits, or even
that of single-digit, more particularly the delay in
those cases was supported by su&icient cause. The
present case, however, stands on a very di&erent
footing, owing to such an enormous delay. Hence,
we are not inclined to accept the condonation of the
delay by the High Court.
261. Thus, for the reasons aforesaid, the impugned
order of the High Court deserves to be set aside.
Before we proceed to close this judgment, we deem
it appropriate to make it abundantly clear that
administrative lethargy and laxity can never stand
as a su&icient ground for condonation of delay, and
we want to convey an emphatic message to all the
High Courts that delays shall not be condoned on
frivolous and super-cial grounds, until a proper
case of su&icient cause is made out, wherein the
State-machinery is able to establish that it acted
with bona -des and remained vigilant all
throughout. Procedure is a handmaid to justice, as
is famously said. But courts, and more particularly
the constitutional courts, ought not to obviate the
procedure for a litigating State agency, who also
equally su&er the bars of limitation from pursuing
litigations due to its own lackadaisical attitude.
262. The High Courts ought not give a legitimizing
e&ect to such callous attitude of State authorities or
its instrumentalities, and should remain extra
cautious, if the party seeking condonation of delay
is a State-authority. They should not become
surrogates for State laxity and lethargy. The
constitutional courts ought to be cognizant of the
apathy and pangs of a private litigant. Litigants
C/CA/4893/2024
ORDER DATED: 27/11/2025
cannot be placed in situations of perpetual
litigations, wherein the fruits of their decrees or
favourable orders are frustrated at later stages. We
are at pains to reiterate this everlasting trend, and
put all the High Courts to notice, not to reopen
matters with inordinate delay, until su&icient cause
exists, as by doing so the courts only add insult to
the injury, more particularly in appeals under
Section 100 of the CPC, wherein its jurisdiction is
already limited to questions of law.
263. Limitation periods are prescribed to maintain a
sweeping scope for the lis to attain for -nality. More
than the importance of judicial time, what worries
us is the plight of a litigant with limited means, who
is to contest against an enormous State, and its
elaborate and never-exhausting paraphernalia. Such
litigations deserve to be disposed of at the very
threshold, because, say if a party litigating against
the State, for whatever reason, is unable to contest
the condonation of delay in appeal, unlike the
present case, it reopens the lis for another round of
litigation, and leaves such litigant listless yet again.
As courts of conscience, it is our obligation that we
assure that a litigant is not sent from pillar to post
to seek justice.”
14.
Thus in the facts and in circumstances, this Court is of
the opinion that applicants were not diligent in availing
remedy of appeal / application. The averments made in the
application seeking condonation of delay in )ling application
do not inspire any acceptable cause much less su6icient cause
to exercise discretion in its favour.
15.
Another submission that the learned Executing Court has
erroneously charged 6% interest u/s 23(1)(A) of the Land
Acquisition Act despite the learned Tribunal in reference
proceedings, did not pass any such order, has been addressed
C/CA/4893/2024
ORDER DATED: 27/11/2025
by this Court in group of revisions being CRA No.373 of 2022
and allied matters. The observations made by the Coordinate
Bench of this Court reads as under:“Heard Mr. Manraj Barot, learned AGP for the
applicants AND Mr.K.M. Sheth, learned advocate for
the respondents.
In the present applications, the challenge is to the
order passed by the learned Executing Court
awarding compensation under Section 23-1A of the
Land Acquisition Act along with interest thereon to
which the claimants were entitled as per the Land
Reference Case orders. No error has been committed
by the Executing Court since it is a clear case of the
claimants that the 12% increase as contemplated
under Section 23-1A of the Land Acquisition Act was
not calculated and paid to them. This position could
not be disputed by the learned AGP in executing
court as well as in this Court. By the impugned order,
the learned Executing Court has only calculated and
awarded the said amount along with the interest
entitled on it. No case is made out for interference.
Present Civil Revision Applications stand dismissed
accordingly. No order as to costs.”
16.
The aforesaid order is also con)rmed by the Hon’ble Apex
Court in Special Leave to Appeal (Diary) No.13798 of 2024.
17.
In view of the aforesaid discussion, and upon a
meticulous application of the ratio decidendi adverted to
hereinabove, this Court )nds that, in absence whereof, the
very foundation of the allegations crumbles, there is no cogent
or credible explanation forthcoming for the inordinate and
colossal delay of 5525 days. The application, being sans
merits, inexorably merits dismissal and is, accordingly,
C/CA/4893/2024
ORDER DATED: 27/11/2025
DISMISSED.
18.
Consequently, the prayer for registration of the CRA also
stands rejected.
(J. C. DOSHI,J)
SHEKHAR P. BARVE
Original copy of this order has been signed by the Hon'ble Judge.
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review