Sr. No. 114
HIGH COURT OF JAMMU & KASHMIR AND LADAKH
AT JAMMU
MA No 45/2025
CM No. 5555/2025
Cav No. 1923/2025
Chuni Lal
…..Appellants
Through: Mr. Sachin Sharma, Advocate
Vs
UT of J&K and ors.
.…. Respondents
Through: Mrs. Monika Kohli, Sr. AAG
CORAM:
1.
HON’BLE MR. JUSTICE SANJAY DHAR, JUDGE
ORDER
01.09.2025
Through
the
medium
of
present
appeal,
the
appellant/plaintiff has challenged order dated 22.07.2025 passed
by the learned District Judge, Udhampur whereby application of
the appellant/plaintiff under Order 39 Rule 1 & 2 CPC for grant
of interim relief has been dismissed.
2.
Issue notice to the contesting respondent Nos. 1 to 3.
Mrs. Monika Kohli, learned Sr. AAG accepts notice on their
behalf. Caveat stands discharged.
3.
Heard and considered.
4.
It appears that the appellant/plaintiff has filed a suit
against respondent Nos. 1 to 3 (contesting defendants) and
respondent Nos. 4 & 5 (proforma defendants) seeking declaration
that he along with proforma defendants have become owner of the
land
measuring
marlas
falling
in
khasra
Nos.
MA No 45/2025
1852/1851/1614 situated at village Manthal (Mand) Tehsil and
District
Udhampur
by
way
of
adverse
possession.
The
appellant/plaintiff has also sought a permanent prohibitory
injunction against the contesting defendants restraining them
from interfering in his peaceful possession over the suit land with
a further direction that he should not be dispossessed from the
shops constructed on the suit land nor the said shops should be
dismantled.
5.
It has been pleaded that the plaintiff as well as proforma
defendants and their ancestors have been in continuous and
uninterrupted possession of the suit land for the last more than
100 years. According to the plaintiff, Jamabandi of the year,
1957-58 reflects the possession of his grandfather namely Sarban
and one Mansa Ram over the suit land but in fact, Mansa Ram
has never remained in possession of the said land and whole of
06 marlas of land remained in possession of the plaintiff and
proforma defendants. It has been submitted that the plaintiff and
proforma defendants constructed shops over the suit land and
have been operating their business from these shops. The plaintiff
claims that he is in occupation of three shops but due to
construction of the highway, the said shops became useless
because the height of the road was raised. According to the
plaintiff, he has recently renovated the said shops and has raised
the level of these shops to the level of the road. It has been
pleaded that possession of the plaintiff and proforma defendants
MA No 45/2025
over the suit land is continuous, uninterrupted and hostile
towards rights of contesting defendants for the last 100 years and
the said defendants have been totally ousted from the said land.
6.
It has been further pleaded that possession of the
plaintiffs is hostile to the knowledge of the contesting defendants
and as such, the plaintiff has perfected his title over the suit land
and has become owner of the same by way of adverse possession.
The possession of the plaintiff over the suit land is stated to be
reflected in Kharief 2011 and Rabi 2017 as well. It has been
submitted that in the year, 2012 the contesting defendant No. 2
lodged an FIR No. 16/2012 for offences under Section 447-A RPC
alleging commission of criminal trespass by the plaintiff. The FIR,
after investigation, culminated in filing of the Challan against the
plaintiff. It has been submitted that the said Challan has been
dismissed by learned Special Mobile Magistrate, Udhampur vide
judgment dated 24.05.2018 and the plaintiff has been acquitted
of the charges.
7.
plaintiff
It has also been pleaded that in August, 2018, the
filed
an
application before
Deputy Commissioner,
Udhampur for seeking reconstruction of the shops and a report
was called by the Deputy Commissioner. According to the
plaintiff, one of the shops constructed over the suit land is in the
name of his son and an electric connection has been obtained in
his name. It has been pleaded that contesting defendant Nos. 2 &
3 are trying to forcibly dispossess the plaintiff from the suit land
MA No 45/2025
and they are also trying to dismantle the shops constructed on
the suit land.
8.
The suit has been contested by the contesting defendants
by filing their written statement. In their written statement, it has
been pleaded that the plaintiff is an unauthorized occupant of
the State land and even long possession for a long period does not
confer ownership rights upon him. It has been submitted that the
land in question is public land and any construction or use of the
land without proper authorization amounts to encroachment
which the State has right to remove. It has been contended that
claim of the plaintiff regarding title on the basis of adverse
possession is not supported by any material and the requisite
pleadings.
9.
According to the contesting defendants, the fact that they
had lodged an FIR against the plaintiff for criminal trespass and
the fact that proceedings under Section 133 and 139 of the Land
Revenue Act were initiated by the contesting defendants against
the plaintiff clearly shows that contesting defendants have never
acquiesced in unauthorized occupation of the land in question by
the plaintiff. It has been submitted that in the year, 2020, the
entries in the revenue record in respect of the suit land have been
expunged. It has been further contended that in view of the
directions issued by Division Bench of this Court in the case of
S.K Bhalla Vs. State of J&K contesting defendants are duty
bound to remove all encroachments of the State land and as
MA No 45/2025
such, civil Court cannot entertain a claim which is contrary to the
directions of the Division Bench of this Court.
10.
The contesting defendants have denied the claim of the
plaintiff that he is in uninterrupted possession of the suit land for
the last more than 100 years. It has been claimed that merely
because there is an entry of possession in favour of the plaintiff in
old revenue record does not mean that he has been in continuous
and uninterrupted possession of the suit land. According to the
contesting defendants, their entries only convey that the plaintiff
has been in unauthorized occupation of the suit land during the
years Kharief 2011 and Rabi 2017.
11.
The contesting defendants have alleged that the plaintiff
has tried to raise fresh construction on the suit land whereafter,
notices under Land Revenue Act were issued to the son of the
plaintiff and when he did not stop the construction, eviction
notice was served upon the plaintiff through his son and police
was also involved so that the construction raised by the plaintiff
is demolished. It has been further pleaded by contesting
defendants that the plaintiff was in possession of small patch of
land on spot which came under acquisition and he along with cosharers have been paid a sum of Rs. 3,90,000/- as compensation
for the structures raised on spot.
12.
Learned trial Court after hearing the parties has, vide
impugned order dated 22.07.2025 proceeded to decide the
MA No 45/2025
application of the plaintiff under Order 39 Rule 1 & 2 CPC for
grant of interim injunction. The said application has been
dismissed by the learned trial Court by holding that the plaintiff’s
claim with regard to ownership by way of adverse possession of
the suit land is prima-facie not tenable. The learned trial Court
has further observed that in view of the directions passed by this
Court and the Supreme Court in several cases, the plaintiff
cannot be allowed to raise construction on the State land. Thus,
according to the learned trial Court even the balance of
convenience does not lie in favour of the plaintiff. Consequently,
the learned trial Court has proceeded to dismiss the application
of the plaintiff under Order 39 Rule 1 & 2 CPC by virtue of
impugned order.
13.
The appellant/plaintiff has challenged impugned order
passed by the learned trial Court on the grounds that the learned
trial Court has based its opinion on the strength of misleading
averments made by the contesting defendants in their written
statement. It has been contended that passing of the impugned
order by the trial Court has resulted in forcible demolition and
dispossession of the plaintiff from the suit land/building. It has
also been contended that the observations of the trial Court that
there is inherent inconsistency in the case of the plaintiff are also
without any basis. It has further been pleaded that there is ample
proof that the plaintiff is in continuous and uninterrupted
possession of the suit land but the same has been ignored by the
MA No 45/2025
learned trial Court. It has also been contended that in terms of
Article 112 of the Limitation Act, the plaintiff has perfected his
title because he has succeeded in showing that he has been in
possession of the suit property for more than 30 years and his
possession is open and hostile to the contesting defendants.
According to the appellant/plaintiff, reliance placed by the trial
Court on judgments of this Court and judgments of the Supreme
Court which provide for removal of unauthorized encroachment
on the State land is misplaced in the facts and circumstances of
the case.
14.
The case of the plaintiff is that he has been in
uninterrupted and continuous possession of the suit land for the
last more than 100 years and this possession is open and hostile
to the knowledge of the contesting defendants. Therefore, he has
become owner of the suit land by adverse possession. In this
regard, it is to be noted that in order to establish the plea of
adverse possession against the State merely because the plaintiff
is shown to be in possession over a period of more than 30 years
would not entitle him to be declared as owner by way of adverse
possession. When a person claims ownership by way of adverse
possession of State land, the Court has to scrutinize and analyze
his claim with more seriousness and with more care because if a
Court passes a decree in favour of plaintiff in such a case, it
would amount to conferring title upon him on State resources
which is a public trust. Destruction of right and title of the State
MA No 45/2025
to immovable property has serious consequences on State
resources.
15.
Vs.
The Supreme Court has, in the case of “R. Hanumaiah
Secretary
to
Government
of
Karnataka,
Revenue
Department”; (2010) 5 SCC 203 laid down the principles of law
indicating the nature of proof required in a suit for declaration of
title against the Government. The relevant observations of the
Supreme Court are reproduced as under:“15. Suits for declaration of title against the government, though
similar to suits for declaration of title against private individuals differ
significantly in some aspects. The first difference is in regard to the
presumption available in favour of the government. All lands which
are not the property of any person or which are not vested in a local
authority, belong to the government. All unoccupied lands are the
property of the government, unless any person can establish his right
or title to any such land. This presumption available to the
government, is not available to any person or individual. The second
difference is in regard to the period for which title and/or possession
have to be established by a person suing for declaration of title.
Establishing title/possession for a period exceeding twelve years may
be adequate to establish title in a declaratory suit against any
individual. On the other hand, title/possession for a period exceeding
thirty years will have to be established to succeed in a declaratory suit
for title against government. This follows from Article
112 of Limitation Act, 1963, which prescribes a longer period of thirty
years as limitation in regard to suits by government as against the
period of 12 years for suits by private individuals. The reason is
obvious. Government properties are spread over the entire state and it
is not always possible for the government to protect or safeguard its
properties from encroachments. Many a time, its own officers who are
expected to protect its properties and maintain proper records, either
due to negligence or collusion, create entries in records to help private
parties, to lay claim of ownership or possession against the
government. Any loss of government property is ultimately the loss to
the community. Courts owe a duty to be vigilant to ensure that public
property is not converted into private property by unscrupulous
elements.
16. Many civil courts deal with suits for declaration of title and
injunction against government, in a casual manner, ignoring or
overlooking the special features relating to government properties.
Instances of such suits against government being routinely decreed,
either ex parte or for want of proper contest, merely acting upon the
oral assertions of plaintiffs or stray revenue entries are common.
Whether the government contests the suit or not, before a suit for
declaration of title against a government is decreed, the plaintiff should
establish, either his title by producing the title deeds which
satisfactorily trace title for a minimum period of thirty years prior to
the date of the suit (except where title is claimed with reference to a
grant or transfer by the government or a statutory development
authority), or by establishing adverse possession for a period of more
than thirty years. In such suits, courts cannot, ignoring the
MA No 45/2025
presumptions available in favour of the government, grant declaratory
or injunctive decrees against the government by relying upon one of
the principles underlying pleadings that plaint averments which are
not denied or traversed are deemed to have been accepted or admitted.
A court should necessarily seek an answer to the following question,
before it grants a decree declaring title against the government :
whether the plaintiff has produced title deeds tracing the title for a
period of more than thirty years; or whether the plaintiff has
established his adverse possession to the knowledge of the government
for a period of more than thirty years, so as to convert his possession
into title. Incidental to that question, the court should also find out
whether the plaintiff is recorded to be the owner or holder or occupant
of the property in the revenue records or municipal records, for more
than thirty years, and what is the nature of possession claimed by the
plaintiff, if he is in possession - authorized or unauthorized;
permissive; casual and occasional; furtive and clandestine; open,
continuous and hostile; deemed or implied (following a title).
17. Mere temporary use or occupation without the animus to claim
ownership or mere use at sufferance will not be sufficient to create any
right adverse to the Government. In order to oust or defeat the title of
the government, a claimant has to establish a clear title which is
superior to or better than the title of the government or establish
perfection of title by adverse possession for a period of more than
thirty years with the knowledge of the government. To claim adverse
possession, the possession of the claimant must be actual, open and
visible, hostile to the owner (and therefore necessarily with the
knowledge of the owner) and continued during the entire period
necessary to create a bar under the law of limitation. In short, it should
be adequate in continuity, publicity and in extent. Mere vague or
doubtful assertions that the claimant has been in adverse possession
will not be sufficient. Unexplained stray or sporadic entries for a year
or for a few years will not be sufficient and should be ignored. As
noticed above, many a time it is possible for a private citizen to get his
name entered as the occupant of government land, with the help of
collusive government servants. Only entries based on appropriate
documents like grants, title deeds etc. or based upon actual verification
of physical possession by an authority authorized to recognize such
possession and make appropriate entries can be used against the
government. By its very nature, a claim based on adverse possession
requires clear and categorical pleadings and evidence, much more so,
if it is against the government. Be that as it may.”
16.
From the foregoing analysis of legal position on the
subject, it is clear that merely because there are entries in the
revenue record in favour of a litigant claiming title by way of
adverse possession against the State would not be sufficient to
confer title upon him. It is only the entries based upon actual
verification of the possession on spot which can be used against
the Government. It is also clear that plaintiff has to establish his
adverse possession to the knowledge of the Government for a
period of more than 30 years so as to convert his possession into
MA No 45/2025
title. A permissive, casual or occasional possession may not be
sufficient to create any right adverse to the Government.
17.
In the light of the aforesaid legal position, let us now
advert to the facts of the present case. In the plaint, it has been
pleaded that the plaintiff has been in possession of the suit land
for the last more than 100 years. The revenue record which has
placed on record is pertaining to the year, 1957-58 which shows
possession of predecessor-in-interest of plaintiff and one more
person namely Mansa Ram over the suit land and the name of
owner is shown as the State. Another document on which plaintiff
has placed reliance is copy of khasra girdawari for the year, 2011
in which name of the plaintiff along with name of Mansa Ram is
shown to be in possession of the suit land. Similar is the position
shown in the copy of Girdawari for the year, 2017. The plaintiff
has not placed on record any other document or revenue extract
to show his continuous possession over the suit land for more
than 30 years. On the basis of two entries one of the year, 2011
and another of the year 2017 in the revenue record in favour of
plaintiff, prima facie, it cannot be stated that he has been in
continuous possession of the suit land for the last more than 30
years.
18.
The material on record further shows that possession of
the plaintiff over the suit land has never been accepted by the
contesting defendants. In the year, 2012, they lodged an FIR
against him which culminated in a Challan against the plaintiff.
MA No 45/2025
The same, it appears was dismissed because of non-appearance
of Tehsildar as a witness before the criminal Court but that does
not mean that occupation of the plaintiff over the suit land was
authorized. It is also clear from the record that after the dismissal
of Challan, the contesting defendants proceeded against the
plaintiff under Section 133 of the Land Revenue Act seeking his
eviction from the land in question. So, it is not a case where
contesting defendants have acquiesced in the possession of the
plaintiff over the suit land continuously for more than 30years.
The material on record prima-facie shows that the claim of the
plaintiff regarding ownership by adverse possession is not
tenable. The observations of the learned trial Court in this regard,
therefore, cannot be termed as either perverse or illegal.
19.
There is yet another aspect of the matter which is
required to be considered. As per own case of the plaintiff, the
construction of shops which he has raised/intends to raise on
spot is near the edge of the National Highway. As per the
provisions of Section 3 of the Prevention of Ribbon Development
Act, no building can be erected alongside any road maintained by
the public works department or any other department
within
such distance from the centre of the road as may be specified by
a general or special order published in the official gazette. In
exercise of power under this provision, Chief Engineer, PWD has
issued notification bearing SRO 509 dated 26.10.1970 directing
that no building shall be erected along either side of Pathankot-
MA No 45/2025
Jammu-Srinagar-Uri road (Outside Municipal Limits) within a
distance of 100 feet from the centre of the road without sanction
in writing of the Chief Engineer, PWD (Roads and Buildings).
20.
It is not the case of the plaintiff that he has raised the
construction of shops with the permission of Chief Engineer, PWD
(R&B). Therefore, even as per provisions contained in Section 3 of
the Prevention of Ribbon Development Act, it is not open to the
plaintiff to raise construction of shops on the edge of JammuSrinagar National Highway. On this ground also, no interim
injunction
restraining
the
contesting
defendants
from
demolishing the shops constructed by plaintiff on the edge of the
National Highway could have been granted by the learned trial
Court.
21.
For the foregoing reasons, I do not find any ground to
interfere in the impugned order passed by the learned trial Court.
The appeal lacks merit and is dismissed accordingly.
(SANJAY DHAR)
JUDGE
JAMMU
01.09.2025
Tarun/PS
Whether the order is speaking?
Whether the order is reportable?
Mahavir Singh
2025.09.03 23:14
I attest to the accuracy and
integrity of this document
Yes
No
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review