Full Judgment Text
Text read from the judgment PDF published on the High Court's eCourts portal, through the
Indian High Court Judgments open data set (Dattam Labs,
CC BY 4.0).
The court's own copy is the authoritative text.
IN THE HIGH COURT AT CALCUTTA
CONSTITUTIONAL WRIT JURISDICTION
APPELLATE SIDE
Present:
The Hon’ble Justice Rai Chattopadhyay
WPA 19833 of 2022
Arif Hussain
Vs.
State of West Bengal & Ors.
with
WPA 19385 of 2022
Md. Arif Hussain
Vs.
State of West Bengal & Ors.
For the Petitioner
: Mr. Sattwik Bhattacharya
: Mr. Aashutosh Bhattacharyya
: Mr. Titas Niyogi
: Mr. Aritra Roy
For the State
: Mr. Pantu Deb Roy, Ld. AGP
: Mr. Pannalal Bandopadhyay
Judgment on
Uploaded on
: 10.06.2026
: 10.06.2026
Rai Chattopadhyay, J. :(1)
The two above mentioned writ petitions are filed by the same petitioner, to
seek relief with respect to the different vehicles and permits of him, on
different routes. In WPA No.19833 of 2022, the writ petitioner has prayed
for the relief that the respondent authority may be directed to issue
forthwith the permanent stage carriage permit on the inter-State route from
Kolkata to Khesar [342 Kilometers], as against the existing vacancy of 3
permits for West Bengal State, without giving effect to the impugned
resolution dated November 27, 2020 and January 29, 2021[7th Agenda], in
respect of the petitioner’s two vehicles bearing No. WB-76A/6694 and
WB-76A/6717. He seeks that his representation to that effect, dated
September 21, 2020, be accordingly disposed of by the authority.
(2)
In WPA No.19835 of 2022, the writ petitioner has prayed for the relief that
the respondent authority may be directed to issue the permanent stage
carriage permit on the inter-State route from Kolkata to Marhar [Bihar] via
Burdwan, Asansol, Dhanbad [total length of route 530 Kilometers], as
against the existing vacancy of 6 permits for West Bengal State, without
giving effect to the impugned resolution dated November 27, 2020 and
January 29, 2021[13th Agenda], in respect of the petitioner’s two vehicles
bearing No. WB-76A/7696 and WB-41H/2686. He seeks that his
representation to that effect, dated September 21, 2020, be accordingly
disposed of by the authority.
(3)
The petitioner has also challenged a notification dated February 24, 2020,
declaring probable vacancy position as on January 31, 2020, in order to
grant permits on the inter-State routes, including the 4 vacancy of the
petitioner’s proposed route, for which he has already been granted offer
letters and also the resolution of the respondent Board dated January 29,
2021, thereby rejecting to grant permit to the writ petitioner.
(4)
Since the two writ petitions deal with disputed issued similar to and
intertwined with each other, both have been heard together and are being
disposed of vide the following common judgment.
(5)
The petitioner has initially operated under the Reciprocal Transport
Agreement entered in between the States of West Bengal and Bihar dated
May 27, 1988. After bifurcation of the State of Bihar, the petitioner was
thereafter covered under the Reciprocal Transport Agreement entered in
between the States of West Bengal and Jharkhand published in Calcutta
Gazette dated March 23, 2004. A draft fresh Reciprocal Transport
Agreement was prepared between West Bengal and Bihar on May 21,
2014. 24 additional inter-State routes were created between West Bengal
and Bihar, with concurrence of State authority of Jharkhand dated
September 16, 2015. The Fresh Reciprocal Transport Agreement between
West Bengal and Bihar was finally published in Calcutta Gazette on
February 22, 2016, covering routes through West Bengal, Bihar and
Jharkhand.
(6)
One of such newly created inter-State route is from Kolkata to Khesar via
Burdwan, Suri, Dumka, Deoghar, Katoria, covering a length of 342
Kilometers. One other newly created route is from Kolkata to Marhar
[Bihar] via Burdwan, Asansol, Dhanbad, covering a total length of 530
Kilometers. 10 vacancies were created for each of the routes for the State
of West Bengal under Serial Nos. 19 and 18 respectively, of the said new
Reciprocal Transport Agreement of 2016.
(7)
The petitioner had applied for grant of one permanent stage carriage permit
each for the said respective routes for his abovementioned two vehicles for
each route, on February 21, 2017 [Docket No.96]. the Board took up the
petitioner’s applications for consideration in meeting dated March 17,
2017, vide Agenda Nos. 60 and 61 respectively and approved the same.
(8)
The writ petitioner was issued offer letters dated March 29, 2017 and
January 19, 2017 respectively which he has received on April 24, 2018 and
January 24, 2017 respectively. Validity period of the offer letter dated
March 29, 2017 was extended till October 19, 2018.
(9)
For all his vehicles the petitioner has made prayer before the respondent
authority for according permission and/or approval to get “Sleeper”
incorporated in the Registration Certificate, as the vehicles were fitted with
sleeper births. This provision was available under Rule 108 of the Orissa
Motor Vehicle Amendment Rules 2012. The petitioner requested the
Secretary, Department of Transport, Government of West Bengal, to
amend the prevailing West Bengal Motor Vehicles Rules, 1989 to make the
system of registration of vehicles with sleeper births available on the
Department’s website, vide his representations. The petitioner’s prayer was
accepted and vide notification dated January 19, 2018, the respondent
authority has allowed registration of sleeper coaches, subject to adherence
with the other connected rules. Allegedly despite the said order passed by
the respondent authority, the concerned registering authority has declined
to incorporate “Sleeper”, in the registration certificates of the petitioner’s
vehicles, fitted with sleeper births.
(10) The petitioner says that this gross inaction of the registering authority, in
making necessary modification in the registration certificate of the vehicles
of the writ petitioner, despite there being order issued by the concerned
respondent Department, has resulted into failure of the petitioner to submit
necessary documents before the authority for grant of permit for “Sleeper”
class of vehicle. However, he has filed documents as available along with
RBI Challan showing payment of requisite permit fees on June 29, 2018
and February 21, 2017 respectively.
(11) The writ petitioner’s grievance is that in spite of the same, the respondent
permit issuing authority has illegally, unreasonably and arbitrarily declined
to issue permit of the petitioner’s vehicles and has failed to consider duly
his representation in this regard dated September 21, 2020.
(12) The petitioner is further aggrieved by issuance of notification dated
February 24, 2020, declaring probable vacancy position as on January 31,
2020, in order to grant permits on the inter-State routes, including the 4
vacancy of the petitioner’s proposed route, for which he has already been
granted offer letters.
(13) For redress of such grievance of him, the writ petitioner has filed the
instant two writ petitions.
(14) Mr. Sattwik Bhattacharya, learned advocate has represented the writ
petitioner. At the outset he has expressed grievance of his client against the
Board resolution dated January 29, 2021, in which the Board has held that
“….permit with BS-III compliant vehicle is already restricted vide STA
resolution dated November 27, 2020 and also on the ground that he has
failed to obtain permit since long.” He submits that this resolution of the
Board is in colourable exercise of the statutory power by the Board as
envisaged under section 80 of the Act of 1988. That, it is due to extraneous
and unsustainable considerations as it has the effect of superseding the
earlier decision of the Board itself in favour of the petitioner to grant him
permit and issue him offer letter for that. That, it has infringed the
legitimate right and expectation of the petitioner, emanating from the said
earlier resolution. He says that the decision once taken by the Board on the
basis of its satisfaction as regards the petitioner’s compliance with the
applicable yardsticks for being granted with the permit, has bestowed
indefeasible right to the writ petitioner to be grated with the same. That,
such right of the petitioner cannot be defeated at a later stage, only
unilaterally, without any cogent and justified reason, or else the same
should be considered as unreasonable and arbitrary action of the respondent
authority.
(15) Learned advocate has submitted that delay if any, by the petitioner in
production of the vehicle is due to the reason of default committed by the
registering authority, which has failed to incorporate necessary
modification into the registration certificate of the vehicles by marking
those as “sleeper” class vehicles. Therefore, it has been submitted that
reason for the petitioner’s delay in production of vehicles has been beyond
his control, which should have been condoned by the respondent authority.
His other point of argument is that the respondent Board, by a subsequent
resolution dated August 24, 2022 [Agenda No.1 therein], has
withdrawn/relaxed the restrictions earlier imposed on the BS-III vehicles
vide the resolution dated November 27, 2020, to the extent that
applications approved on the inter-regional route, prior to November 27,
2020, with BS-III vehicles, which are originating, traversing and/or
terminating within Kolkata Metropolitan area, would be allowed to get
permit. Hence, he says, that the petitioner should be rendered with benefits
under this resolution of the respondent authority.
(16) The petitioner has further raised grievance as regards grant of permit to one
Md. Mustaqeen, on the selfsame route, vide the Board’s resolution dated
January 29, 2021 [Agenda No.17], on the ground of fraud and
misrepresentation, as allegedly the said applicant has produced BS-III
vehicle by fraudulently portraying the same as a BS-IV model. It has been
submitted that as per sections 80 and 88 of the Motor Vehicles Act, 1988,
STA West Bengal cannot be treated to have been vested with any power,
authority and jurisdiction to refuse grant of stage carriage permit till the
time, vacancies, as have been created by the Reciprocal Transport
Agreement, do exist. It is submitted that the decision of the authority to
reject grant of permit to the writ petitioner, is contrary to the liberalized
policy as envisaged under the 1988 enactment. Mr. Bhattacharya has
sought for setting aside of the Board’s resolution rejecting grant of permit
to the petitioner and other appropriate order in this writ petition.
(17) The respondent is represented by Mr. Pantu Deb Roy, learned AGP. It is
submitted that in respect of the petitioner’s application dated February 21,
2017, the vehicles No. WB-41E 2924 and WB-11TK 1312 [two owners
including the writ petitioner] were approved for grant of permit and the
offer letter dated April 20, 2018, was issued. That, time-limit prescribed in
the offer letter was extended up to October 19, 2018.
(18) On September 21, 2020, the petitioner submitted application to replace
WB-41E 2924, by another vehicle No. WB-76A 9964. On October 19,
2018, the petitioner submitted further application of permit with respect to
the 2 vehicles No. WB-76A 6717 and WB-76A 6694. It is submitted that in
meeting dated January 29, 2021, the respondent Board resolved to reject
the application of the petitioner for replacement, as well as previous
approval granted to the petitioner vide resolution of meeting dated March
17, 2017. The reason for such rejection is stated to be in exercise of powers
conferred under section 72 (2)(xxiv) of the Motor Vehicles Act, 1988, for
the reason that grant of Interstate stage carriage permit for BS-III vehicles
has already been restricted vide the STA resolution dated November 27,
2020 and also that the petitioner has failed to take steps as per the offer
letter and obtained permit, in spite of a long period of time having elapsed.
(19) The respondent has relied on an order of the National Green Tribunal
dated November 27, 2018 in O.A. No. 33 of 2014 (EZ) (Subhas Datta
versus State of West Bengal and Others) to say that as per the same as well
as directions of the Supreme Court, the old vehicles had to be phased out to
introduce BS-VI standard vehicles on road.
(20) It has been submitted that the decision of the State authority in meeting
dated August 24, 2021 that only those applications of interregional route,
that are originating, traversing and/or terminating within KMA area and
was approved prior to November 27, 2020 for a BS-III vehicle, would be
granted permit, in case they be able to fulfil certain conditions -- was taken
only in terms of the order of the National Green Tribunal as mentioned
above and directives of the Supreme Court. Therefore, according to the
said respondent there is neither any illegality nor any impropriety in the
decision of the respondent authority in rejecting the petitioner’s prayer, as
he did not produce a vehicle in terms of the policy decision of the
respondent authority. In such circumstances, the respondent has sought for
an order dismissing the instant writ petition.
(21) The controversy has its genesis in the reciprocal transport arrangements
governing inter-State routes between West Bengal, Bihar and Jharkhand.
Following the publication of the fresh Reciprocal Transport Agreement on
February 22, 2016, new inter-State routes were created, including the
Kolkata–Khesar route and the Kolkata–Marhar route, with ten vacancies
earmarked for West Bengal operators on each route. Availing himself of
the vacancies so created, the petitioner applied on February 21, 2017, for
permanent stage carriage permits in respect of two vehicles on each of the
said routes. The State Transport Authority considered the applications in its
meeting held on March 17, 2017, and approved them, whereupon offer
letters were issued to the petitioner and the period for compliance was
subsequently extended. According to the petitioner, while he deposited the
requisite permit fees within the stipulated period, he encountered difficulty
in producing the necessary vehicle documents because the registering
authority failed to incorporate the “sleeper” classification in the registration
certificates of his vehicles, notwithstanding a policy decision permitting
registration of sleeper coaches. The petitioner contends that such
administrative inaction prevented him from completing the formalities for
obtaining the permits and ultimately resulted in the non-issuance of permits
despite his repeated representations.
(22) The dispute intensified when, according to the petitioner, the authorities
neither acted upon his representation dated September 21, 2020, nor
granted the permits for which offer letters had already been issued. He
further questioned the notification dated February 24, 2020, declaring fresh
vacancies on the very routes for which he had earlier been selected and
alleged that the subsequent resolution of the State Transport Authority
dated January 29, 2021, arbitrarily defeated his legitimate expectation
arising from the earlier approval. The petitioner maintained that once his
applications had been approved and offer letters issued, the authorities
could not subsequently deny the permits on grounds extraneous to the
original selection process, particularly when the delay in production of
documents was attributable to the conduct of the registering authority itself.
He also relied upon a later relaxation of restrictions relating to BS-III
vehicles and alleged discriminatory treatment in the grant of permits to
other operators.
(23) The respondent authorities, on the other hand, asserted that although the
petitioner’s applications had initially been approved and offer letters
issued, he failed to comply with the conditions thereof within the
prescribed time. It was pointed out that the petitioner subsequently sought
replacement of vehicles and requested permits in respect of different
vehicles from those originally approved. In the meantime, policy decisions
were taken restricting the grant of inter-State permits to BS-III vehicles in
view of environmental directives flowing from orders of the National
Green Tribunal and the Supreme Court. Consequently, in its meeting dated
29 January 2021, the State Transport Authority resolved to reject both the
petitioner’s request for replacement of vehicles and the earlier approval
itself, citing the BS-III restriction as well as the petitioner’s prolonged
failure to obtain permits despite the grant of sufficient opportunity.
According to the respondents, the subsequent relaxation of the policy was
confined to a limited class of cases and did not entitle the petitioner to any
special consideration. The authorities therefore maintained that the
rejection of the petitioner’s claim was lawful, consistent with prevailing
policy, and justified by his failure to satisfy the requirements of the offer
letters.
(24) Ordinarily, once an applicant is selected, the Authority issues an offer letter
requiring compliance with certain conditions within a stipulated period,
such as, deposit of prescribed motor vehicle tax/fees, production of vehicle
particulars and registration documents, submission of route papers and
other statutory documents and production of a vehicle conforming to the
category for which the permit was applied. The conditions contained in the
offer letter are generally not mere formalities. They are intended to enable
the Authority to ascertain whether the applicant possesses a vehicle
answering the description of the permit advertised and whether the
applicant is ready to operate the service. Therefore, mere deposit of fees
within time cannot automatically confer a vested right to a permit, if other
essential conditions remain unfulfilled.
(25) The distinction between a procedural defect and a substantive defect
becomes crucial. If the applicant deposited the requisite fees within the
stipulated time but failed to produce the vehicle papers, the Authority
would have to examine whether the papers were subsequently produced
within a reasonable period; the failure was attributable to circumstances
beyond the applicant's control; and whether the omission prejudiced the
verification process. However, where the offer letter expressly stipulates
that non-submission of vehicle documents within the prescribed period
would entail cancellation of the offer, the Authority may legitimately treat
the offer as having lapsed. The rationale is that a permit cannot ordinarily
be granted in abstract without verification of the vehicle proposed to be
operated under the permit.
(26) The petitioner's explanation that the delay in production of the requisite
vehicle documents was occasioned by the registering authority's failure to
incorporate the endorsement relating to sleeper coaches in the registration
certificates cannot, by itself, furnish a complete answer to the deficiencies
noticed by the respondent Authority. Even assuming that the petitioner
encountered administrative difficulties in securing such endorsement, the
record discloses that the petitioner did not merely seek extension of time to
produce the originally approved vehicles but proceeded to seek issuance of
permits in respect of different vehicles and, in effect, a different vehicle
configuration from that contemplated at the time of approval. The inability
to obtain a particular endorsement may explain a delay in compliance, but
it does not justify a fundamental departure from the terms of the original
application. Moreover, the petitioner remained under an obligation to keep
the Authority informed, seek appropriate extensions within a reasonable
time and demonstrate readiness with vehicles conforming to the category
for which approval had been granted. The lapse continued over a
considerable period, and the explanation offered does not satisfactorily
account for the entirety of such delay. In these circumstances, the
respondent Authority was entitled to conclude that the petitioner's failure
was not confined to a mere procedural impediment attributable to the
administration but involved non-fulfilment of substantive conditions
essential for grant of the permit.
(27) In these circumstances the aspect of the petitioner requesting for permit in
respect of a different class of vehicle [sleeper class], assumes more
significance. Sections 72 and 74 of the Motor Vehicles Act contemplate
grant of permits with reference to a particular vehicle description and
operational characteristics. Where applications were invited for a specified
class of vehicle, all applicants compete on that basis.
(28) If an applicant originally sought a permit for one class of vehicle but, after
selection, requested issuance of a permit for another class, several
consequences follow. Like, the Authority would effectively be considering
a new proposal. The competing applicants would never be afforded an
opportunity to apply for that altered category or that the change may affect
passenger capacity, route economics, traffic management and regulatory
considerations. Consequently, such a request cannot ordinarily be treated as
a mere correction or curable defect.
(29) The general principle is that an administrative authority cannot
substantially alter the terms of the selection process after its conclusion. If
the notification and application contemplated one category of vehicle, grant
of permit for an altogether different category would amount to changing
the rules of the game after the game has begun. Where public rights and
competitive selection are involved, the authority must adhere to the notified
conditions and cannot confer an advantage upon one applicant by relaxing
essential eligibility requirements. Therefore, unless the governing
notification or permit scheme expressly authorises substitution of vehicle
category, the Authority would be justified in rejecting such a request.
(30) When both circumstances coexist, namely, failure to submit the required
vehicle papers within the stipulated period and a request to obtain a permit
for a different class of vehicle than the one applied for, the applicant's case
becomes considerably weaker. The deposit of fees demonstrates
willingness to comply, but it does not cure non-production of mandatory
documents; or the fundamental alteration of the subject matter of the
application. The latter goes to the root of the selection process.
(31) The deposit of motor vehicle fees within the period stipulated in the offer
letter does not by itself create an indefeasible right to grant of permit.
Compliance with all essential conditions of the offer letter is required. The
failure to produce vehicle documents within the prescribed period
prevented the Authority from verifying the vehicle proposed to be
operated. More importantly, the subsequent request for grant of permit in
respect of a different class of vehicle amounted to a material departure
from the original application and could not be treated as a mere procedural
irregularity. Acceptance of such a request would have the effect of altering
the terms of the selection process and conferring an undue advantage upon
the applicant vis-à-vis other competitors. In such circumstances, the
Authority would be justified in treating the offer as lapsed and in declining
issuance of the permit.
(32) Accordingly, unless the applicant establishes a specific statutory power of
relaxation or demonstrates that the change of vehicle class was expressly
permissible under the governing notification and rules, the application
would ordinarily be liable to be rejected and the selection cancelled.
(33) The law is well-settled that where a statute, notification or offer letter
prescribes conditions precedent for obtaining a benefit, substantial
compliance with all essential conditions is mandatory. Mere compliance
with one of the requirements cannot entitle an applicant to insist upon
conferment of the ultimate benefit when other mandatory requirements
remain unfulfilled. The deposit of the prescribed permit fees within the
stipulated period may demonstrate the petitioner's willingness to avail the
permit, but such deposit by itself cannot eclipse the failure to furnish the
requisite vehicle documents which alone would enable the Authority to
verify the existence, eligibility and conformity of the vehicle proposed to
be operated on the notified route.
(34) Grant of permits under the Motor Vehicles Act is governed by statutory
requirements and regulatory considerations and that the Transport
Authorities are required to act strictly within the framework of the Act and
the applicable scheme. The decision underscores that permit rights do not
arise merely from an expectation of grant but only upon fulfilment of the
prescribed statutory conditions. The petitioner cannot contend that a vested
right to obtain a permit accrued merely upon deposit of the prescribed fees.
Under the scheme of the Motor Vehicles Act, grant of a permit remains
subject to fulfilment of all statutory and procedural requirements and
satisfaction of the Transport Authority regarding the eligibility of the
vehicle and the applicant. The mere payment of fees cannot substitute
compliance with other mandatory conditions requiring production and
verification of vehicle particulars. Reference may be made to the
observations of the Supreme Court in Mithilesh Garg v. Union of India,
(1992) 1 SCC 168, where the Court recognised that the grant of permits
remains regulated by the statutory framework and subject to compliance
with the prescribed requirements.
(35) Equally important is the petitioner's request seeking grant of permit for a
class of vehicle different from the one for which the original application
was submitted. Such a request cannot be viewed as a mere curable
irregularity. The Supreme Court has consistently held that the terms of a
selection process cannot be altered after the process has commenced and
that eligibility conditions applicable to all participants must be uniformly
enforced. In Bedanga Talukdar v. Saifudaullah Khan (2011) 12 SCC 85,
the Court held that where the procedure and conditions are prescribed in
the advertisement or notification, the authorities are bound by them and
relaxation in favour of one candidate would be impermissible unless
specifically authorised. The underlying principle is that public authorities
must adhere to the declared rules of the game and cannot modify them to
suit an individual applicant. Similar principles were reiterated in
Maharashtra State Road Transport Corporation v. Rajendra Bhimrao
Mandve (2001) 10 SCC 51 and K. Manjusree v. State of Andhra Pradesh
(2008) 3 SCC 512, wherein it was held that the norms governing selection
cannot be changed after commencement of the process. Although those
decisions arose in service jurisprudence, the doctrine is of general
application to all public selection processes involving comparative rights of
competing applicants. An applicant who sought consideration for one
category of vehicle cannot, after being selected, seek substitution by
another category if such change was never contemplated by the original
notification.
(36) The doctrine of level playing field also assumes significance. In a landmark
decision in Ramana Dayaram Shetty v. International Airport Authority of
India (1979) 3 SCC 489, the Supreme Court held that where public
authorities prescribe eligibility conditions, they are bound to apply them
uniformly and cannot depart therefrom arbitrarily. Granting a permit for a
vehicle class different from the one notified would amount to extending a
benefit not available to other applicants who participated on the basis of the
original terms.
(37) Therefore, the petitioner's timely deposit of fees may at best evidence
partial compliance with the offer letter. However, the combined effect of
failure to submit the requisite vehicle papers and the request for
substitution of the vehicle category strikes at the root of the selection
process itself. The Authority would thus be justified in refusing issuance of
the permit and in treating the offer as having lapsed. No enforceable right
could accrue in favour of the petitioner merely because the prescribed fees
had been deposited within the stipulated period.
(38) The petitioner's contention that the continued existence of vacancies under
the Reciprocal Transport Agreement left the respondent Authority with
little or no discretion to refuse the permit cannot be accepted. The existence
of a vacancy merely signifies the maximum number of permits that may be
granted on a particular inter-State route under the reciprocal arrangement
contemplated by Section 88 of the Motor Vehicles Act, 1988; it does not
operate as a statutory mandate requiring the Authority to grant permits
irrespective of compliance with the conditions prescribed by law. Section
80 undoubtedly embodies the liberalised permit regime introduced by the
1988 Act and discourages arbitrary refusal of permit applications.
However, the provision does not dispense with the requirement that an
applicant must satisfy the statutory conditions governing grant of permits,
nor does it curtail the Authority's power to ensure that the vehicle proposed
conforms to prevailing regulatory, environmental and policy requirements.
(39) Equally, Section 88 of the Act of 1988 governs the recognition and
operation of inter-State permits within the framework of reciprocal
agreements but does not create an enforceable right in favour of every
applicant merely because vacancies remain unfilled. The vacancies created
under the Reciprocal Transport Agreement indicate availability of permit
slots; they do not dilute the Authority's obligation to scrutinise the
eligibility of the applicant and the vehicle. To hold otherwise would reduce
the statutory approval process to a mechanical exercise and compel grant of
permits even where the applicant has failed to comply with essential
conditions or where the proposed vehicle has become ineligible under
subsequently applicable regulatory norms. Therefore, the subsistence of
vacancies under the Reciprocal Transport Agreement could not, by itself,
compel the respondent Authority to issue permits to the petitioner in
disregard of his non-compliance and the prevailing restrictions governing
the vehicles in question.
(40) The restriction imposed upon grant of inter-State stage carriage permits in
respect of BS-III compliant vehicles constitutes an additional and
independent ground justifying rejection of the petitioner's claim. It is not in
dispute that the State Transport Authority, acting upon environmental
concerns reflected in the directions of the National Green Tribunal and the
policy imperative of gradual transition to cleaner emission standards,
resolved on November 27, 2020, to restrict issuance of permits in respect of
BS-III vehicles. Such a policy decision, taken in furtherance of public
interest and environmental protection, falls squarely within the regulatory
domain of the transport authorities and cannot be lightly interfered with in
judicial review. Significantly, on the date when the petitioner's claim came
up for consideration, no permit had actually been issued in his favour and,
therefore, no vested or accrued right had crystallised merely by reason of
an earlier approval or issuance of an offer letter. The Authority was entitled
to apply the policy prevailing on the date of final consideration of the
matter. Once the vehicles proposed by the petitioner fell within the
category of BS-III compliant vehicles against which restrictions had
already been imposed, the Authority could not have been compelled to
grant permits contrary to its own subsisting policy. The subsequent
relaxation granted by the Authority was limited in scope and conditional in
nature and did not create any automatic entitlement in favour of every
applicant whose proposal had earlier been approved. Consequently, the
respondent Authority cannot be faulted for declining to issue permits in
respect of the petitioner's BS-III vehicles, particularly when such refusal
was founded upon a uniformly applicable policy measure, intended to
advance environmental objectives and statutory regulatory concerns.
(41) The mere approval of an application for grant of permit and issuance of an
offer letter do not exhaust the statutory jurisdiction of the Transport
Authority nor do they create an irrevocable right in favour of the applicant.
Such approval remains inherently conditional upon fulfilment of the
requirements stipulated in the offer letter and continued conformity with
the prevailing statutory and regulatory framework. Where an applicant fails
to comply with the prescribed conditions within the stipulated period, and
even after extension of time does not place himself in a position to obtain
the permit, the approval remains inchoate and incapable of maturing into an
enforceable entitlement. The considerable lapse of time between the initial
approval and the final consideration of the matter is also a relevant
circumstance, for transport regulation is a continuing administrative
function required to respond to changing policy considerations,
environmental norms and public interest requirements. In the present case,
the petitioner's prolonged non-compliance, coupled with the subsequent
request for a materially different vehicle configuration and the intervening
policy restrictions relating to BS-III vehicles, furnished sufficient grounds
for the Authority to revisit the earlier approval. Since no permit had been
actually issued and no vested right had accrued, the Authority was legally
competent to withdraw the earlier approval and treat the offer as having
lapsed, rather than remaining perpetually bound by a provisional decision
taken years earlier in an entirely different factual and regulatory setting.
(42) For all the reasons as discussed above, the instant writ petitions are bound
to fail. Hence, WPA No. 19833 of 2022 and WPA No. 19835 of 2022 are
dismissed.
(43) Urgent certified copy of this judgment, if applied for, be supplied to the
parties upon compliance with all requisite formalities.
(Rai Chattopadhyay, J.)
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review