Judgments
LegalFirms.in Judgments · legalfirms.in/judgments/argou-technologies-private-limited-vs-divisional-railway-manager-20260224/ · Printed 19 Nov 2026
Constitutional

Argou Technologies Private Limited vs Divisional Railway Manager

Add to a compilation

Keep judgments in folders, mark the paragraphs you rely on, and print a compilation with an index. It comes with the Research and Advocate Pro judgment plans and with a campus licence. Sign in · See the plans

Court
Telangana High Court
Date
24 February 2026
Case No.
WP 32541/2025
Result
Dismissed
Bench
Nagesh Bheemapaka
Cite this judgment
Citation
Link for your website or blog
Cite the court's own record or the law report in court filings.

The court's order

The closing paragraphs of the judgment, in the court's own words. The reasons are in the full text below.

8. Accordingly, the Writ petition stands dismissed. No COS tS.

9. Consequently, the miscellaneous Applications, if any shall stand closed. S //TRUE COPY// o/ . L. VIJAYA LAX R To, Advocate OP cl One CC to tril/s VLADIMEER KHATOON' N.BHUJANGA RAO, DEPUTY S 2 One CC to SR I at HYd era ad [oPUC] lNDlA, High Cou rt for the State of Telangana

Filed under

Code of Civil Procedure, 1908 Section 151, Code of Civil Procedure, 1908

The sections, explained

The law this judgment cites

Opens the section on Law Maker (lawmaker.in), our sister site for law students.

Full Judgment Text

Text read from the judgment PDF published on the High Court's eCourts portal, through the Indian High Court Judgments open data set (Dattam Labs, CC BY 4.0). The court's own copy is the authoritative text.

[ 3300 ] IN THE HIGH COURT FOR THE STATE OF TELANGANA AT HYDERABAD (SPecial Original Jurisdiction) TUESDAY, THE TWENTY FOURTH DAY OF FEBRUARY TWO THOUSAND AND TWENTY SIX PRESENT THE HONOURABLE SRI JUSTICE NAGESH BHEEMAPAKA WRIT PETIT ION NO: 32541 OF 2025 Between: ARGOU TECHNOLOGIES PRIVATE LllvllTED, Represented by its Director, '1 Manne Swathi, W/o.f\/alikarjun, Age.32 years' Occ.Director, O/o 1-1 4-359/1 , Siri Nagar Colony, Beside Redbucked LB Nagar, Hyderabad, RangaReddy500074. ...PETITIONER AND 1. Divisional Railway [/lanager, office sanchalan Bhavan, Secunderabad Division, South Central Railway, Secunderabad, Telangana-500025' 2. Principal/chief commercial fi/anager, office First floor of Rail Nilayam, Secunderabad-500025. 3. Senior Divisional commercial Manager, Office 3rd floor of sanchalan Bhavan, Sarojini Devi Road, Secunderabad-500071 . 4. Divisional Commercial lr'lanager, Sanchalan Bhavan, l st floor, Commercial Branch,secunderabadDivision,southCentralRailwaySecunderabada500003. ...RESPONDENTS Petition under Article 226 of the constitution of lndia praying that in the pleased circumstances stated in the affidavit filed therewith, the High Court may be toissueawrit,orderordirectionmoreparticularlyoneinthenatureofwritof mandamus declaring the action of the 3rd Respondent issued Termination order dated.16/10/2025 is illegal, highly unwarranted, highly arbitrary, unfair' unjust, irrational, unlaMul and violative of Article 14 and 21 of the Constitution of lndia and consequently set aside the same. l.A. NO: 1OF 2025 Petition under Section 151 CPC praying that in the circurr jtances stated in the affidavit filed in support of the writ petition, the High Court ma1 be pleased to grant interim suspension of Termination Order dated.16l10l2o2l issued by the 3rd Respondent pending disposal of the above writ petition. l.A. NO: 2OF 2025 Petition under Section 151 CPC praying that in the circurr ;tances stated in the affidavit filed in support of the writ petition, the High court ma7 be pleased to direct the Respondents permit the petitioner to operate the BOC C z rs at Secunderabad Railway Station pending disposal of the above writ petition. Counsel for the Petitioner: M/s. VLADIMEER KHATOON Counsel for the Respondents: SMT N.V.R.RAJYA LAKSHM , SC FOR CENTRAL GOVT. repr :senting SRI N.BHUJANGA RAO, DEPUTY SOLICITOR GENERA . OF INDIA The Court made the following: ORDER IN THE HIGH COURT OF JUDICATURE FOR THE STATE OF TELANGANA HON'BLE SRI JUSTICE NAGESH BHEEMAPAKA WRIT PETITION No. 3254L OF 2025 24.O2.2026 Between: ARGOU TECH NOLOGItrS PRIVATE LIMITtrD, Rep. by its Director Manne Swathi Pctitioner And Divisional Railway Manager, Secunderabad Division & others Respondents ORDER: The case of petitioner, as pleaded, is that pursuant to the e-Auction dated 26.07.2025 issued by the 3''t respondent for provision, operation and management of three batteryoperated cars at Secunderabad Raihvay Station. petitioner participated and was declared successful. Consequent thereto, on line Contract Agreement was entered into on 31.O7 .2025 for a period of Iive years commencing from 25.08.2025 and ending on 24.O8.2O3O with an annual licence fee of Rs.33,OO, i 1 1/- and a total contract value of Rs. 1 ,94,70,654.90. It is lurther pleaded that the Earnest Money Deposit rvas paid on 26.07.2025 uide Bank Transactron ID LM918647 57 with IRtrPS Relerence ID- 3109751 and that after commencement of the contract, petitioner appointcd two supervisors and scvet drivers for opcration of the battcry opcrated cars. 1- 1 . It is statccl, pctitioncr admitted that ,r I 19.O9.2O25 an incident ocr:urred at I'latform No.1O whcn the operator Mr. Anand, aftcr dropping passcngers, haltcd tl e vchicle lor collecting cash and thc battery-operated car rollerl back ancl fell onto the track. PeIitioner plcaded that apprehelrl ng danger in the event of arrival of a train, the operator, u'i , the help of persons present or-r the platform, repositioned tlr: vehicle and drove it along the track to the end of thc rlatform ar-rd thereafter, through a ramp to Platforms 6 and l. An enquiry was conducted on 19.09.2025 by the 4tl) Respc,r denl, during which the operator explained the circutnstances. rdmitted that railway officials tvere not informed, assured th: I the incidet-rt would not recur, arnd agreed to be permanently cmoved frorn servicc. Pelitioner's supervisor requestcd that t.l: incident be treatcd as a last u,arning stating that it was a ltr-'1 instance and that thc petitioncr was ncw to thc contra.ct. |-2. Petitioner statcs that thereafter, thc 'l' Respondent issued a temporary suspension order datcd 19.t 9.2025 citit'tg thc safetl, incidcnt ancl anticipatcd heavS, passeng r r rush duritlg Dussehra, Deepavali and Chhath festivals, suspt: Lding all BOC operations frorn 20.O9.2025 to 28.1O.2025. Ft presentations dated 23.O9.2O25 and 06.10.2025 were submitted seeking revocation oI suspension, expressing unconditional apologr, stating that thc incider-rt was accidental, and arssuring implcmentation of corrective measures including clriver training ancl strict monitoring, but the same were not considcrcd. Howcver, without considcring the representations, tl-re 3.1 Rcspondent issued Termination Order dated 16. 10.2025 alleging violation of Clause 18. 1 of the Standard Conditions of Contract, forfeiting the full security deposit of Rs.3,30,O11/ and directing immediate removal of all BOCs and ecluipment. 1.3. Petitioner states that no passenger sustained any inj ury in the incident and that the operator acted only to prevent any untoward occurrence. The contract had commenced only 23 days prior to the incident and was valid for a periocl of live years titt 2O3O, and that a request was made durrng enquiry to trcat the incident as a last warning. According to petitioner, termination caused severe financial hardship as loans u'cre taken to start the busincss, vehicles rvere insured, salaries errc bcing paid to drivers and supervisors despite stoppage of rvork, zrnd the petitioner's family is entirely dependent on the said busincss. 2. In the counter filed on behalf of Respondents, it is stated, the contract for operation and maintenance of three .1 battcry-opcratr:d cars at Sccunderabad Railwav ar,,,ardcd to l)ctltioner [or a pcriod of hve itation u'as years fro;t 25 08.2025 to 24.O8.20'',O .rt zlll ett'ltluzrl licensc fce of R" 33'(" .111/-, vidc Agrcemcnt No MSS SC-SC-BCA-26 23- 1 31.o7.2025. Pursuaut to tllc arvartl o[ thc contract' the dated licensei: raid the first quartcrlv liccusc fce of Rs 8'25'O2S/- and operatiotls rvitl'r thrcc battcry-operatcd cars cornmetrccd from ! 5 08 2025 It is stated that on \9 (\g 2025 at about 16:45 hourI ' intbrmation wasreccivedbytlrcRailrvayautlroritiesthatab:Ltery-operated car was drivt'tl on the railway tracks at Secundr t ebad Railway Statiott 2.1. It is stated that a preliminary repr'; t was soLlght from the Chtcl Comrnercial lnspector' Secunderr rad (CCI/SC)' and as pel 1[ie said report' it rvas conhrmed operated ('zl rt was rlriven on the railway operator Mr. Anand . Cor-rside ring thc tt I t the battery- tracl: by the BOC gravity of tir incident ' oral instructions rvcrc issucd to the Chief Commc t :ial [nspector' Sccundcraba<l (CCI/SC), to immcdiately operatcd car opcratiot'rs at Secunderabad ccas: all battcry- Railu I 1' Station' and accordingll' all BOC services werc stopped' O I 18 09'2025' a Cautionlraclerlrca<lybecnissuedtothesulervisorolthc a i the incidcnt licensce rcgarciing safc opcration of BOCs occurred otr the very next day' i'e'' 19 O9'2021i an<I in rriew of ) the heary passenger rush anticipated during the ensuing festival season, it was considered necessary as a preventive measure to suspend such unsafe operations and enforce strict compliance with safety norms. 2.2. It is further stated that an interim joint inspection was conducted by the Station Manager (SMR)/ Gaz/ SC, Chief Commercial Inspector (CCI)/SC and Assistant Sub-Inspector (ASI)/RPF/SC. As per the inspection report, on 19.O9.2025 at 16:45 hours, the BOC stationed on Platform No.10 near the main portico fell onto the track while the driver was reversing the vehicle after de boarding passengers. Upon being informed by onlookers, the on-duty CCI, Sri B.K. Sinha reported the matter to the Station Manager, Gaz/SC, who immediately contacted the RRI cabin'and instructed that train operations on the affected track be halted to ensure safety of passengers and Railway assets. It is stated that although the toppled BOC was stabilizecl with tire help of catering vendors, OBHS stalf and parcel handling staff, the operator, without seeking authorization or guidance from Railway ofTicials, drove the BOC on the railway track towards the pathway, an eLct witnessed by passengcrs. lt is also stated that riding an unauthc -ized vehrcle on raihvay tracks, thercby endangering pass lngcrs and 2-3. intcrfcring with train operations, is illegal and protL. rited. Be fore taking action, the liccnsee was provided a fair c portunity to explain the inciclent and its repe rcussions' Durin I the enquiry, the licensee admitted that the incident occurre( due to the mistake of the operator Mr' Anand and acknowlecl ed that such lapses could have serious consequences affect g passenger t safety and train oPerations' The operator ac I independentll' without informing litted acting any Railwa I admitted seeking assistance from other contractl authoritY, i I staff on the platform, ancl admittecl driving the BOC on the rack without permission. It was admitted that had authorities : :en informed' proper guidance could have been provided' el d that conduct could have led to derailment if a train hz 1 such approached the track. 2.4 . It is stalecl furthcr that the licenset admitted that submitted the recluired insurancc was still awaited lt is ful :rer that Exhibit P9 at page 5O is mislcading, as C't use 22 of the Special Conditior-rs of Corltract mandates insurar ce coverage of at least Rs.23O lakhs for four passengers, whe- as Exhibit P9 reflects only Rs-25 lakhs under Public Liabilitl' z nd not for the strpulated purpose, resulting in non-complianc t with Clauses O and 22 ol tt,e Special Conditions of Contract. Ciause 10 of the Special Conditions of Contract mandates adequate safety training to drivers and places sole responsibility for provision, operation and maintenance of BOCs on the licensee. 2.5. It is statecl that the letter dated 18.09.2025 was issued by the office of the Senior Divisional Commercial Manager to the licensee regarding safe operation of BOCs, and counselling was conducted by CCI/SC for all operators on the Joint Procedure Order. Despite such counselling a day prior, the operator acted negligently, showing disregard for safety. The licensee admitted failure to fulfil contractual obligations including issuance of ID cards to operators and providing insurance coverage for unnamed passengers. It is stated that in vierv of the enquiry report, personal hearing and paramount consideration of passenger salety and Railway assets, the Railway Administration was constrained to terminate the contract undcr Clause 18.1 of thc Special Conditions of Contract, '"vhich empowers termination without notice for violation of contract terms or serious misconduct, including violation of the Railways Act, 1989, with forfeiture of full trMD/ Security Deposit. 2.6. After following due proccdure .r d affording opportunity of hearing, the contract was terminat rd u,ith effect from 16.1O.2025 and a termination letter was issr.r :d. Accordrng to re spondcnts, termination was necessitated c r c to serious lapses by the licensee and operator and to enst re passenger safety at Secunderabad Railway Statron, which hz.r dles lakhs of passengers daily- It is stated that driving a vehic c on railway tracks without authorization constitutes an l Ience under Section 161 of the Railways Act, 1989, and driviri; dangerously endangering public safety is punishable under li :ctior-r 184 of the Motor Vehicles Act, 1988 as atnended it 2019. The L terminatton was a punitive measure strictly in acr ordance with Clause 18. 1 of the Standard Conditions of Contra : and Lhat the full EMD/Security Deposit was rightly forfeited. r s per Clause 22 of t!;,e Indian Railway Standard General lonclitions of I Contract, the petitioner ought to have invoke: thc dispute resolution and arbitrzrtion mechanism, which was rot zrvailed. 3. Hcard Sri Vladimeer Khatoon, learn: 1 counsel for petitioner and Smt. N.V. R. Rajya Lakshmi, 1ea r red Standing Counsel for Rcspondent No. 1 4. . The contcntion of the petitioncr that no passenger was injured does not dilute the gravity of thc mis<:r nduct. Safety jurisprudence mandates that preventive action i:, justified even in absence of actual injury. The respondents have demonstrated that train operations had to be halted and that the incident occurred during peak hours with heavy passenger movement. The plea that the contract had commenced only 23 days prior cannot override contractual obligations expressly undertaken by the petitioner, particularly Clauses 10, 18.1 and 22 of the Special Conditions of Contract. 5. The record further establishes that petitioner failed to comply with mandatory insurance requirements and failed to ensure proper training and supervision of operators. The enquiry conducted on 19.O9 .2025 provided an opportunity to the petitioner, during which admissions were made regarding lapses. The temporary suspension order dated 19 .O9 .2025 clearly recorded reasons relating to safety and anticipated healy passenger rush during Dussehra, Deepavali and Chhath festivals. The termination order dated 16. 1O.2O25 was issued after considering the enquiry, admissions and contractual violations, hence invocation of Articles 14 and 27 is misconceived. The termination was based on objective material, contractual provisions and safety considerations and cannot be termed arbitrary or irrational. Courts exercising jurisdiction under Article 226 d,o not sit as appellate authorities over contractual decisions taken by expert bodies unless perversity IO or mala fides are established No such grounds ar(r made out in the present case. 6. Interference by thc High Court irL contractual matters is limited only to cases where the action o the State or its instrumentalities is shown to be patenl F arbitrary' provisions discriminatory, mala hde, or in violation of statut: y or constitutional manclates Mere breach of contr I lt' erroneous t interpretation of contractual clauses' or harsh onsequences flowing from contractual enforcement do not' t' themselves' warrant invocation of writ jurisdiction' The plea of financial hardship' tl ough noted' cannot override pubiic safety and contrac[rr Ll disciptine' 7. Railway Administration handles lakhs of passen[:rs daily and cannot adoPt a lenient approach in matters ill'olving safety violations. Petitioner also failed to exhaust .l e alternative dispute resolution mechanism providcd under Cir rrst: 22 of the Indian Railu'ay Standard General Conditions o Contract' In view of the admitted facts, contractual prov: ions enquiry Act' 1989 findings and statutory obligations under the Railvays andtheMotorVehiclesAct,lg88,thisCourtfir:<snoillegality' arbitrariness or constitutional inhrmity in the ter nination order dated 16.10.2025. The writ petition is devoid of r: :rit' 1l 8. Accordingly, the Writ petition stands dismissed. No COS tS. 9. Consequently, the miscellaneous Applications, if any shall stand closed. S //TRUE COPY// o/ . L. VIJAYA LAX R ST ANT REG ECTION OFFICER To, Advocate OP cl One CC to tril/s VLADIMEER KHATOON' ITOR GENERAL OF N.BHUJANGA RAO, DEPUTY S 2 One CC to SR I at HYd era ad [oPUC] lNDlA, High Cou rt for the State of Telangana 3. Two CD CoPies BSq YV CC TODAY HIGH COURT DATED: 2410212026 ^::::.-;-1", .,i .,:. ...1'ri' ORDER I WP.No.32541 ot 2025 DISMISSING THE WRIT PETITION, WITHOUT COSTS ^ee,\ () (9Y, k"' _, ,,_-o.,t i: /.. _ t: Hl,'i '- ei l" \1. .. . 2[2fi i ,\." ,..'

This page is for informational and research purposes only and does not constitute legal advice. Consult a qualified advocate for advice specific to your situation.

Is your name in this judgment and should it be masked, or is something on this page wrong? Request a review

All Telangana HC judgments →
LegalFirms.in Directory
Find an advocate for this matter
Dealing with a similar case? Find an advocate who handles this kind of matter on LegalFirms.in.
Find an advocate →