Full Judgment Text
Text read from the judgment PDF published on the High Court's eCourts portal, through the
Indian High Court Judgments open data set (Dattam Labs,
CC BY 4.0).
The court's own copy is the authoritative text.
APHC010261422026
IN THE HIGH COURT OF ANDHRA PRADESH
AT AMARAVATI
(Special Original Jurisdiction)
MONDAY, THE 3rd DAY OF JULY 2026
PRESENT
THE HONOURABLE SRI JUSTICE VENKATESWARLU NIMMAGADDA
WRIT PETITION NOS: 13625, 13628, 13630 OF 2026, 12474 OF 2016
AND
W.P.NO.1108 OF 2017
WRIT PETITION NO: 13625 OF 2026
Between:
1. PIONEER ALUMINIUM INDUSTRIES LIMITED, (Formerly M/s. Anrak
Aluminium Ltd.), A Company incorporated under the provisions of the Indian
Companies Act, 1956, Having its Registered Office at API 1C Industrial Park,
G. Koduru village, Makavarapelm Mandal, Vishakhapatnam District, Andhra
Pradesh - 531113. Rep by its Authorised Representative, D. Rama Krishna.
...Petitioner
AND
1. THE STATE OF ANDHRA PRADESH, Rep. by its Principal Secretary,
Department of Industries, Infrastructure, Investment
And Commerce,
Secretariat, Velagapudi, Amaravati-522020.
2. The Director of Mines and Geology, Andhra Pradesh
Ibrahimpatnam,
Vijayawada-521456
3. The Andhra Pradesh Mineral Development Corporation Limited APMDC,
Having its registered office at
D.N0.294/1D, 100 Feet Rd, Kanuru,
Vijayawada, Andhra Pradesh-521137.
4. The Secretary, Ministry of Mines, Union of India Shastri Bhavan, New Delhi
- 110001.
...Respondents
Counsel for the Petitioner: N ASHWANI KUMAR
Counsel for the Respondents: THE ADVOCATE GENERAL
WRIT PETITION NO: 13628 OF 2026
Between:
1. PIONEER ALUMINIUM INDUSTRIES LIMITED, (Formerly M/s. Anrak
Aluminium Ltd.), A Company incorporated under the provisions of the Indian
Companies Act, 1956, Having its Registered Office at API 1C Industrial Park,
G. Koduru village, Makavarapelm Mandal, Vishakhapatnam District, Andhra
Pradesh - 531113. Rep by its Authorised Representative, D. Rama Krishna.
...Petitioner
AND
1. THE STATE OF ANDHRA PRADESH, Rep. by its Principal Secretary,
Department of Industries, Infrastructure, Investment
And Commerce,
Secretariat, Velagapudi, Amaravati-522020.
2. The Director of Mines AND Geology, Andhra Pradesh
Ibrahimpatnam,
Vijayawada-521456
3. The Andhra Pradesh Mineral Development Corporation, Limited (APMDC),
Having its registered office at
D.N0.294/1D, 100 Feet Rd, Kanuru,
Vijayawada, Andhra Pradesh-521137.
4. The Secretary Ministry of Mines, Union of India Shastri Bhavan, New Delhi
- 110001.
...Respondents
Counsel for the Petitioner: N ASHWANI KUMAR
Counsel for the Respondents: THE ADVOCATE GENERAL
WRIT PETITION NO: 13630 OF 2026
Between:
1. M/s. Pioneer Aluminium Industries Limited,, (Formerly M/s. Anrak
Aluminium Ltd.), A Company incorporated under the provisions of the Indian
Companies Act, 1956, Having its Registered Office at API 1C Industrial Park,
G. Koduru village, Makavarapelm Mandal, Vishakhapatnam District, Andhra
Pradesh - 531113. Rep by its Authorised Representative, D. Rama Krishna.
...Petitioner
AND
1. THE STATE OF ANDHRA PRADESH, Rep. by its Principal Secretary,
Department of Industries, Infrastructure, Investment
And Commerce,
Secretariat, Velagapudi, Amaravati-522020.
2. The Director of Mines and Geology, Andhra Pradesh,
Ibrahimpatnam,
Vijayawada-521456
3. The Andhra Pradesh Mineral Development Corporation Limited APMDC, ,
Having its registered office at
D.No.294/ID, 100 Feet Rd, Kanuru,
Vijayawada, Andhra Pradesh-521137.
4. The Secretary, Ministry of Mines, Union of India, Shastri Bhavan, New
Delhi - 110001.
...Respondents
Counsel for the Petitioner: N ASHWANI KUMAR
Counsel for the Respondents: THE ADVOCATE GENERAL
WRIT PETITION NO: 12474 OF 2016
Between:
1. Anrak Aluminnium Ltd., a Public Limited Company,, incorporated under the
provisions of the Indian Companies Act, 1956, its Registered Office at APIIC
Industrial Park, G. Koduru village, Makavarapelm Mandal, Vishakhapatnam
district, Andhra Pradesh - 531 113 and having office at Premises No.8-2-
268/A/1/S 8s Si, Plot No.705, Road No.3, Banjara Hills, Hyderabad-34,
represented by Rep. by Sri Sanka Gan
...Petitioner
AND
1. The State of Andhra Pradesh, represented by its Chief Secretary,
Secretariat, Hyderabad.
2. The State of Andhra Pradesh, represented by its Principal Secretary,
Industries And Commerce, Secretariat, Hyderabad.
3. The Andhra Pradesh Mineral Development, Corporation Limited (APMDC),
a company incorporated under the provisions of the Indian Companies Act,
1956, having its registered office at 6-2-915, HMWSSB Premises, Rear Block,
3rd Floor, Khairatabad, Hyderabad-04 and represented by its Vice Chairman
86 Managing Director.
4. The Secretary Ministry of Mines Union of India, Shastri Bhavan, New Delhi 110 001.
5. State Bank of India being a Lead Bank of 23, Banks' Consortium,
represented by its General Manger 86 Regional head, Corporate Accounts
Group Branch, Ozone 2nd Floor, Punjagutta, Hyderabad- 500 082.
...Respondents
Counsel for the Petitioner: JUVVADI SATYANARAYANA RAO
Counsel for the Respondents: GP FOR INDUSTRIES COMMERCE (TG)
Counsel for the Respondents: DEPUTY SOLICITOR GENERAL OF INDIA
Counsel for the Respondents: Y SUDHAKAR
WRIT PETITION NO: 1108 OF 2017
Between:
1. M/s Anrak Aluminium Ltd.,, Public Limited Company incorporated under the
provisions of the Indian Companies Act, 1956, Having its Registered Office at
APIIC
Industrial
Park,
G.
Koduru
village,
Makavarapelm
Mandal,
Vishakhapatnam district, Andhra Pradesh - 531 113 and Corporate office at
Premises No.8-2-268/A/1/S &
Si, Plot No.705, Road No.3, Banjara Hills,
Hyderabad-34, Rep. by its authorized signatory Sri Sanka Ganapathi
...Petitioner
AND
1. The Andhra Pradesh Mineral Development Corporation Limited, (APMDC),
Company incorporated under the provisions of the Indian Companies Act,
1956, having its registered office at 6-2-915, HMWSSB Premises, Rear Block,
3rd Floor, Khairatabad, Hyderabad-04.
...Respondent
Counsel for the Petitioner: AVINASH DESAI
Counsel for the Respondent Y SUDHAKAR
Counsel for the Respondent15508/THE ADVOCATE GENERAL (AP)
THE HONOURABLE SRI JUSTICE VENKATESWARLU NIMMAGADDA
W.P NOS: 13625, 13628, 13630 OF 2026, 12474 of 2016
AND W.P NO.1108 OF 2017
The Court made the following ORAL COMMON ORDER:
Heard learned counsel for the Writ Petitioners and learned Advocate
General.
2.
All these writ petitions are filed challenging the legality and validity of
G.O.Ms.Nos.83, 84 and 85 Industries, Infrastructure, Investment and
Commerce (M-II) Department dated 26.09.2019, wherein mining lease
granted for Bauxite over to the extents of 85.000, 617.00 and 460.00 Hectors
respectively in Jareela Block-I, II, III & VIII of Chintapalli Reserved Forest,
Visakhapatnam district in favour of M/s APMDC limited for a period of 30
years was revoked. Challenging the said revocation, the present batch of writ
petitions is instituted. For the sake of convenience, the facts mentioned in
W.P.No.12474 of 2016 are referred to in this order.
3.
The case of the petitioner in W.P.No.12474 of 2016 is that the Chief
Secretary, State of Andhra Pradesh, Hyderabad (Respondent No.1) had
entered into Memorandum of Understanding dated 14.02.2007 with the
Government of Ras-Al-Khaimah for establishment of an „Alumina Refinery‟
and Smelter Project in Andhra Pradesh. Pursuant thereto, the Petitioner
Company, i.e., 'M/s.ANRAK Aluminium Limited', was incorporated as a Joint
Venture between RAKIA and Penna Group. It is further submitted that for
supplying bauxite to the refinery, the Respondent No.1 had granted three
mining leases in Jarrela Block-I, II, III and VIII to APMDC vide G.O.Ms.No.358,
359 and 360 dated 28.12.2007 exclusively for supply of bauxite mineral to the
Petitioner‟s Company. For which, the Petitioner invested approximately
Rs.4,500 crores and established its Alumina Refinery and Power Plant based
on assurances by the Respondent No.1 and pursuant to the Bauxite Supply
Agreement dated 30.10.2008. All the required statutory clearances including
Mining Plan, Stage-I and II Forest Clearances, Environmental Clearance, NPV
and Compensatory aforestation payments were complied. It is submitted that
originally, the Respondent No.1 is home to the 2nd largest Bauxite Mineral
Deposits, estimated explored reserves of 658 million tones and yet to be
explored reserves are of about more than 300 Million Tonnes of Metallurgical
grade Bauxite. It is submitted that various Aluminium Companies were set up
in this Country based on MOU's/Agreements signed between the various
State Governments & Project Developers.
4.
He further submits that, the Respondent No.1 had initially reserved the
East Coast Bauxite Deposit bearing areas in Visakhapatnam and East
Godavari Districts through G.O.Ms.No.999, Industries & Commerce (Mines)
Department, Dt.25.10.1978. It is submitted that, after various exploration
studies and pre-feasibility studies, the Respondent No.3 herein had made
applications to the Government of India for grant of Mining Leases over the
areas identified. The Respondent No.1, upon obtaining the confirmation of the
Union Government, more particularly the Finance Ministry vide Letter
Dt.31.1.2007 and the Cabinet Approval Dt.09.02.2007 had entered into an
MOU with the Government of Ras Al Khaimah, UAE on 14.02.2007 for
establishment of 1 Million Tons Alumina Plant with 2.5 Lakh tons of Aluminium
Smelter per annum, Co-Gen Power Plant, with a provision to double its
capacity by using the Bauxite resources available in the State with a Capacity
Outlay of 2 Billion USD and pursuant to the same, the Petitioner company
herein was incorporated as a Special Purpose Vehicle and the project was
declared as a Sector Specific Special Economic Zone by the Union of India
and the Respondent No.1 undertook to direct the Respondent No.3 to supply
Bauxite from out of the areas available in the Jerrala Group of Deposits,
Chintapalli Mandal spread over 1649 Hectares with Probable Reserves of 224
Million Tons of Bauxite Ore for the use of the Aluminum Company at the Price
as fixed by the Committee formed by the Respondent No.1 and further a
clause that no sale or export was to be made by the Respondent No.1 or
Respondent No.3 from the Jerrala Deposit to any other party during the
subsistence of the Agreement with petitioner.
5. It is submitted that the Respondent No.1 had addressed Letters to the
Respondent on 02.03.2007 regarding grant of Mining Lease to APMDC in
respect of Blocks I,II,III and VIII Block of Jerrala Mines subject to forest
clearances. Thereafter upon receiving the necessary clearances from the
various departments of the Union government, Respondent No.1 for supplying
bauxite to the refinery, the Government granted three mining leases in Jarrela
Block-I, II, III and VIII to APMDC vide G.O.Ms.No.358, 359 and 360 dated
28.12.2007, exclusively for supply to the Petitioner Company herein. It is
submitted that, the Respondent No.1, vide G.O.Ms. No. 222, Industries and
Commerce (M-III) Department Dt. 13.08.2008, directing the Respondent No.3
herein to enter into Bauxite, Supply Agreement (BSA) with the Petitioner
Company in terms of the Price Mechanism, specified therein. Thereafter, the
Petitioner herein had invested huge amounts of money and having obtained
Loans and credit services from a Consortium of Banks led by the State Bank
of India and the Plant was constructed and was brought into operational entity.
It is submitted that at this Stage, much to the Surprise and Chagrin of the
Petitioner
herein,
the
Government
of
Andhra
Pradesh
had
issued
G.O.Ms.No.44, Dt.06.04.2016, cancelling the earlier G.O.Ms.No. 222, dated
13.08.2008, which became the subject matter of W.P.No.12474 of 2016,
before this Hon'ble High Court and the same is pending consideration, which
is tagged with this batch of writ petitions.
6.
It is argued that this Hon'ble Court, on 27.04.2016, had passed an
interim order staying the operation of G.O.Ms.No.44, Dt.06.04.2016, with
respect to the Bauxite Supply Agreement and directing the Respondent No.1
and its agencies to adhere to the terms of the Agreement. The interim order of
this Court recognized the binding nature of the Agreement and underscored
that the cancellation of underlying policy orders did not annul or terminate the
contractual rights and obligations between the Respondent No.3 and the
Petitioner herein. Despite the Court's interim protection, the respondent had
issued a show cause notice dated 20.06.2016 proposing termination of the
Bauxite Supply Agreement on similar grounds as in G.O.Ms.No.44 dated
06.04.2016, alleging breach of the government-to-government character and
reduction in RAKIA's equity, lack of competitive bidding, and other purported
deviations prejudicial to public interest. Then the petitioner served its detailed
reply on 09.07.2016 clarifying the legality of the agreement and disputing the
grounds for termination.
7.
While so, the Respondent No.3 had issued termination notice purporting
to cancel the Bauxite Supply Agreement with petitioner unilaterally. It is
submitted that the termination can only occur by mutual consent as per
Clause 21 of the Agreement, that the Respondent No.3 is estopped from
repudiating the contract and that the termination notice threatens the viability
of a strategically important project with massive investment and public interest
implications. It is submitted that, aggrieved by the same, the Petitioner herein
was constrained to approach this Hon'ble Court vide W.P.No.1108 of 2017
and is pending adjudication before this Hon'ble Court.
8.
While this being the case and the Petitioners in W.P.No.13625 of 2026
and W.P.No.1108 of 2017 having been pursuing this Hon'ble Court for
adjudication of the above Writ Petitions but the said Writ Petitions could not be
taken up for hearing due to the bifurcation of the High Court and due to
various other reasons.
9.
It is also stated that due to certain changes in the shareholding of the
Petitioner Company, the new investor undertook detailed due diligence with
regard to the company. While undertaking such exercise, it has come to the
knowledge
of
the
Petitioner
herein
that
the
Respondents
issued
G.O.Ms.No.83, 84 and 85 dated 26.09.2019 arbitrarily revoking all mining
leases granted to the Respondent No.3 herein which are meant for supply of
Bauxite exclusively for petitioner herein, which is subject matter of other two
Writ Petitions lodged by the Petitioner Company, without issuing any notice at
the cost of Principles of Natural Justice. These GOs were not even available
in the public domain much less to the Petitioner to have knowledge, it is
known fact that during the period of 2019-2021 regime, the Government
Orders were not uploaded on the website of the Govt. of A.P.
The
Respondents had failed to consider the object of Bauxite Supply Agreements.
Whereas, the respondent Nos.1 to 3 in W.P.No.12474 of 2016 and 1108 of
2017 and also failed to consider the interim orders already passed in
W.P.No.12474 of 2016.
10.
Whereas, the Respondents cannot give security reasons and tribal
issues for cancellation of the G.O.Ms.84 dated 26.09.2019, as such matters
fall exclusively within the sovereign domain of the State. It is further submitted
that, in G.O.Ms.83, Dt: 26.09.2019, Respondents have completely erred in
invoking the Section 10 A (2) (C) of Mines & Minerals (Development &
Regulation) Amendment Act, 2015 (herein as Amendment Act, 2015) as it
comes under third category of the saved applications under section 10
Amendment Act, 2015 and further it applies to the applicants in seeking Letter
of Intent, Central government had already communicated pervious approval
under Section 5(1) of the Amendment Act, 2015 for the grant of Quarry lease
or Letter of Intent which should be granted by the state government before
commencing of the Amendment Act, 2015. But here in the present case of the
petitioner is completely on different footing as the Mining Lease is already
granted with the approval of Central Government on 2007 for 30 years to the
APMDC.
11.
He further asserts that the Petitioner and the Respondent No.3 herein
has entered into Bauxite Supply Agreement-in 2008 after grant of the Mining
lease. The Respondents has miserly failed to consider these aspects and
invocation of the Section 10 A (2)(C) Amendment Act, 2015 is a patent
jurisdictional error and G.O.Ms.83, Dt: 26.09.2019 is liable to be quashed. In
G.O.Ms.83, Dt: 26.09.2019, the Respondents has mentioned that the
Respondent No.3 and the Petitioner has obtained the Mining Plan Approval,
Environmental clearance, stage-1 forest clearance and the Il stage forest
clearance was issued by central government during 2015 on payment of
Rs.125.15 crores to Forest Department towards Net Present Value by the
Petitioner herein through the Respondent No.3, the Petitioner herein also paid
Rs.31.66 Crores by the Petitioner herein through Respondent No.3 towards
cost for raising the Department dated 05.11.2015 diverting the Forest Land of
1212 Hectors for mining. The Petitioner has established an Alumina Refinery
and a power plant at Rachapally (V) Makavaripelam (M), Visakhapatnam
District with an estimated investment of Rs.4,500/- crores, approximately. The
respondents are bound under the Doctrine of Legitimate expectation. The
mechanical invocation of Section 10 A (2) (C) of the MMDR Amendment Act,
2015 and Rule 7 (11) of 2016 Rules wholly misconceived and inapplicable and
prays this Court to set aside the G.Os dated 26.09.2019 and all actions taken
pursuant thereto as illegal, arbitrary and contrary to law.
12.
Per contra, learned Advocate General submits that vide G.O.Ms.
Nos.358, 359 and 360 Industries and Commerce dated 28.12.2007, the
Government had granted Mining Lease for Bauxite over an extent of 85.000,
617.00 and 460.00 Hectors respectively in Jareela Block-I, II, III & VIII of
Chintapalli Reserved Forest, Visakhapatnam district in favour of M/s. APMDC
Ltd. Thereafter, the Respondent No.1 had entered into a Memorandum of
Understanding (MoU) dated 14.12.2007 with the respective writ petitioners‟
companies. Subsequently, the Ministry of Mines, Government of India, had
issued the Mines & Minerals (Development & Regulation) Amendment Act,
2015 and the Mineral (Other than Atomic and Hydro Carbon Energy Minerals)
Concession Rules 2016. As per Section 10A(2) (C) of the Mines & Minerals
(Development & Regulation) Act 2015, where the Central Government has
communicated previous approval as required under sub-section (1) of section
5 for grant of mining lease, or if a letter of intent (by whatever name called)
has been before the issued by the State Government to grant a mining lease,
commencement of the Mines and Minerals (Development and Regulation)
Amendment Act, 2015 the mining lease shall be granted subject to fulfillment
of the conditions of the previous approval or of the letter of intent within in a
period two (2) years from the date of Commencement of the said Act. As per
Sub- Rule (11) of Rule 7 of the Mineral (Other than Atomic and Hydro Carbon
Energy Minerals) Concession Rules, 2016, the Respondent No.1 shall
execute a mining lease deed with the applicant in the format specified in
Schedule VII within ninety days of fulfillment of the conditions specified in subrule (10) and if no such deed is executed within the said period due to any
default on the part of the applicant, the state government may revoke the
order granting the lease and in that event the fee paid under sub-rule (3) shall
be forfeited to the state government. The Director of Mines & Geology, Andhra
Pradesh has, therefore, recommended for revocation of the subject mining
lease, granted in favour of APMDC Ltd., vide reference first read above, in
accordance with sub-rule (11) of Rule 7 of the Mineral (Other than Atomic and
Hydro Carbon Energy Minerals) Concession Rules, 2016.
13.
He further submits that In terms of the grant of lease made in favour of
M/s APMDC over the subject area vide G.O. No.358, 359 and 360 dated
28.12.2007, M/s APMDC could not obtain CFO for the mines and erect
boundary pillars and fencing as per the conditions in the forest clearance due
to violent opposition to the prospect of mining operations in the tribal areas.
The said conditional grant made vide above G.O, could only be treated as an
in- principle consent for grant of lease or Letter of intent which did not fructify
in to a clear grant of lease in favour of M/s APMDC Ltd., within the allowed
period of two (2) years by virtue of section 10A(2) (c) of the Mines & Minerals
(Development & Regulation) Amendment Act, 2015 which was over by
11.01.2017. The failure of M/s APMDC in proceeding further in securing of
compliances as indicated in the initial conditional grant order arose on account
of impossibility of performance due to recurring acts of violence in the area
because opposition to the prospect of Mining operations in Tribal areas. There
were abductions and violent killings which continue unabated to the extent of
the murder of one sitting MLA and one former MLA who were supported for
mining. The local bodies and the tribal advisory council opposed and continue
to oppose the prospect of Mining operations as of today rendering the
operations unsafe and unviable in the above context. By operation of the law
as well as on account of the supervening impossibility of performance of the
mining operations in the wake of continued violent agitations against Bauxite
Mining, the lease operations cannot be conducted in the area and therefore
the earlier conditional grant order issued vide G.O.Ms.No.83 dated 28.12.2007
have now become non operative due to the cumulative effect of all the
circumstances stated above. In view of the above said circumstances, the
government had revoked the mining leases granted vide G.O.Ms.Nos.358,
359 and 360 dated 28.12.2007.
14.
Heard learned counsel for the Writ Petitioner and learned Advocate
General and perused the material available on record.
15.
In fact, as per clause 2.2 of Bauxite Supply Agreement dated
30.10.2008, the supply agreement shall remain in force for a period of life time
of the plant or till the exhaustion of the mining reserves of the Bauxite in the
mines area whichever is earlier. Therefore, as per the terms of the agreement
it is clearly indicating that the Respondent Nos. 1 and 3 at any stage and in
any circumstances are not be permitted to cancel the lease agreement without
the consent of opposite party to the agreement that the petitioner herein. But
it appears that the agreement dated 30.10.2008 was cancelled unilaterally
without the consent of the petitioner, which is contrary to the terms of the
agreement.
This issue was fallen for consideration before this Court in
W.P.No.12474 of 2016 wherein, this Hon‟ble Court was pleased to pass
interim order as under:
“ORDER:
This Writ Petition is filed challenging the G.O Ms. No. 44,
dated: 06.04.2016.
The Petitioner is basically aggrieved with the para 12 and 13
of the G.O Ms. 44, dated: 06.04.2016, which reads as under,
"12. After careful examination of matter in
detail, the Government hereby cancel the orders
issued in G.O.Ms. 222, Industries and
Commerce (M.III) Department, Dt:13.08.2008
and G.O.Ms.289, Industries and Commerce
(MIII) Department Dt.30.10.2008, in which the
approval to the draft Bauxite Supply agreement
to M/s. ANRAK Aluminum Limited, was given.
13. The Vice Chairman & Managing Director,
M/s APMDC Ltd., and the Director of the Mines
and Geology, AP, Hyderabad shall take
necessary action accordingly in the matter,
immediately, under intimation to the Government.
It is the submission of the petitioner which is also not in
dispute that pursuant to the G.O Ms. 222 and 289 the steps
which are required to be taken have already been taken.
However, now by directing the 3rd respondent-APMDC to
take necessary action, taking into consideration of the
cancellation of the G.O Ms. No. 222 and 289, prejudice is
being caused to the petitioner.
Learned Additional Advocate General appearing for the 1st
respondent as well as 3rd respondent submits that so far as
the petitioner is concerned petitioner has independent rights
on account of agreement entered into with the 3 rd
respondent, the 3rd respondent shall not be interdicted to
take any action from exercising the rights under the
agreement.
Having concerned the submissions, prima facie this is a case
where necessary approvals as required for entering into a
contract were given by the Government at relevant point of
time by passing necessary GOs i.e. G.O Ms. No. 222 and
289. As a matter of fact, pursuant to the said GOs the steps
which are required to be taken by the petitioner as well as
the 3rd respondent have already been taken and there is
nothing in this G.O Ms. No. 44 further to be done. In those
circumstances, prima facie the cancellation of the said Gos
cannot have any bearing on the contracts entered into by the
3rd respondent and the petitioner. Now, it is the relationship
between the petitioner and the and 3rd respondent governed
by the agreement and except in relation to the policy matters
and in relation to the exercise of the statutory powers, if any,
the role of the 1st respondent is minimal at this stage, Prima
facie the clarification in relation to the cancellation of the GOs
made by this Court and G.O Ms. Nos. 222 and 289 having
worked out, the cancellation of the said Gos so far as the
relationship between the third respondent is concerned is
irrelevant at this point of time. However, this shall not be
construed as preventing the 3rd respondent to exercise
contractual rights if any which is governed by the binding
contract between both the parties.”
16.
On perusal of the orders of this Court as extracted above, any
cancellation of lease agreement is contrary to the contractual terms which are
governed between both the parties. It is further observed that the interim
orders as mentioned above are still in force, till date, enforceable since the
writ petition is still pending on the file of this Court. As contended by the
learned counsel for the petitioner pursuant to the G.O.Ms.No.222, Industries
and Commerce (M-III) Department dated 13.08.2008, the Respondent No.3
herein had entered into a Bauxite Supply Agreement with the petitioner as per
the terms mentioned therein. Pursuant to which, the petitioner had invested
huge amounts of Rs.4,500/- crores for establishment of Alumina Refinery and
Power plant and paid an amount of Rs.125.15 crores in favour of the
Department of Environment and Forests, Union of India and also paid an
amount of Rs.31.66 Crores to the Respondent No.3 for development of
additional lease area. Whereas, pursuant to the compliances were submitted
by the petitioner as required as per Letter of Intent (LOI) regarding
environment clearance and various other clearances were granted by the
Union of India and 1st respondent herein have granted mining plan approval.
Therefore, it is contended that the mechanical invocation of Section 10 A (2)
(C) of the MMDR Amendment Act, 2015 and Rule 7 (11) of 2016 Rules is only
misconceived and contrary to the principles of “Legitimate Expectations” is a
merit and sustainable submissions.
Therefore, revoking of mining lease
already granted in all respects in favour of the 3rd respondent under
G.O.Ms.Nos.83, 84 and 85 Industries, Infrastructure, Investment and
Commerce (M-II) Department dated 26.09.2019, conversely, the mining
leases which are already granted are meant for supply of Bauxite exclusively
for the petitioner is bad in law, arbitrary and colourable exercise of power.
Moreover, contrary to the terms of Mines Lease Agreement dated 30.10.2008
and its cancellation by G.O.Ms.Nos.44 dated 06.04.2016, is illegal, arbitrary
and liable to be set aside. As contended by the Learned Counsel for the
Petitioner that the Respondents not adhered to the terms of the Bauxite
Supply Agreement dated 30.10.2008 and also the terms of G.O.Ms. No. 222,
Industries and Commerce (M-III) Department Dt. 13.08.2008 is also evident
from the record. The other contention of the petitioner is that any unilateral
termination cannot be proceeded unless with mutual consent as contemplated
under clause 21 of the agreement.
Therefore, the said cancellation of
agreement dated 30.10.2008 is contrary to Law and same is also under
challenge in W.P.No.1108 of 2017, which is also pending for adjudication till
date. Therefore, it is prayed that, the unilateral cancellations as mentioned
above are liable to be set-aside.
17.
As contended by the learned Advocate General appearing for the
respondents that as per Section 10 (A) (2) (C) of the Mines & Minerals
(Development and Regulation) Act, 2015 when the Central Government as
communicated and as required under sub section for grant of mining lease or
a letter of intent has already been issued by the State Government to grant
mining lease, the subject mining lease shall be granted subject to fulfillment of
conditions of previous approval or letter of intent within a period of two years
from the date of commencement of the said act. As per Sub-Rule 11 (1) of
the Mineral (other than Atomic and Hydro Carbon Energy Minerals)
Concession Rules, 2016 the Respondent No.1 shall execute the mining lease
deed with the applicant in the format specified in Schedule VII within ninety
days of fulfillment of conditions prescribed under Sub-Rule (10) and if such no
deed executed within the said period, in case of any default on the part of the
applicant, the Respondent No.1 may revoke the lease and forfeit the fee paid
to the respondents. In the instant case, the petitioner is unable to comply with
the conditions as envisaged supra within a period of two years and not
entered into any agreement, as such, the respondent Nos. 1 and 3 are entitled
either to revoke or to cancel the lease granted in favour of the petitioner is not
valid, unreasonable and illegal for the reasons that the entire exercise
revocation or cancellation should be done as per the terms of the agreement
entered between the parties.
18.
The contention of the learned Advocate General that as contemplated
under Section 10 (A) (2) (C) of the Mines & Minerals (Development and
Regulation) Act, 2015 and as per Sub-Rule 11 (1) of the Mineral (other than
Atomic and Hydro Carbon Energy Minerals) Concession Rules, 2016 the
respondents shall execute mining lease in favour of the applicant within a
period of 90 days after fulfillment of conditions and in case of any default on
the part of the applicant, the respondent may revoke or forfeit the fee paid to
the respondent is not a valid and reasonable submission for the reasons that
the respondents are kept on proceeded further positively even though the
petitioner herein not complied the times lines as prescribed under Section 10
(A) (2) (C) of the Mines & Minerals (Development and Regulation) Act, 2015
and as per Sub-Rule 11 (1) of the Mineral (other than Atomic and Hydro
Carbon Energy Minerals) Concession Rules, 2016. But granted mining lease
vide G.O.Ms.No.222 dated 13.08.2008 as well as entered into an agreement
with the respondent on 30.10.2008.
19.
The other contention of the learned Advocate General is that the
petitioner is unable to comply with the conditions as envisaged supra within a
period of two years and not entered into an agreement is also not valid ground
for the reason by the date of exercising the power of cancellation everything
was completed after such completion, the cancellation of revocation of lease
granted in favour of the writ petitioner is contrary to settled principles of law
that no cancellation or
revocation
of any benefit
already granted
retrospectively on the ground that the time lines were not observed by the
beneficiary as required under law. Once the respondents are acted upon on
execution of timelines under compliances even after completion of statutory
period as canvassed and issued mining leases and entered into agreement,
the same cannot be cancelled or revoked on the grounds, which were already
considered and ignored by the respondents.
20.
On perusal of the record, it is evident that the 1st respondent issued
G.O.Ms.No.44 dated 06.04.2016 and G.O.Ms.Nos.83, 84 and 85 under which
the mining leases were cancelled which were already granted earlier in favour
of the petitioner vide G.O.Ms.No.222 and 3rd respondent herein under
G.O.Ms.No.358, 359 and 360 are in violation of terms of the grant of lease
and at the cost of “Principles of Natural Justice” apart from the Principle of
“Fair
and
Reasonableness”.
Therefore,
such
cancellation
of
under
G.O.Ms.No.44 dated 06.04.2016 and G.O.Ms.Nos.83, 84 and 85 Industries,
Infrastructure, Investment and Commerce (M-II) Department dated 26.09.2019
is illegal, arbitrary and bad in law. Hence, set aside. It is, therefore, all the
statutory permissions and leases already granted in favour of the 3rd
respondent herein are liable to be continued.
21. However, learned Advocate General for the respondents does not refuted
the other contentions of the learned counsel for the petitioner and at the
request of the petitioner he agreed to re-visit/re-consider the G.O.Ms.Nos.83,
84 and 85 Industries, Infrastructure, Investment and Commerce (M-II)
Department dated 26.09.2019 and also G.O.Ms.No.44 dated 06.04.2016
which was also interdicted by this Court vide Order dated 24.07.2016.
22.
Pursuant to achieve the common object to generate Revenue to the
public exchequer and for creation of large amount of employment for public
good, the respondents consented for reconsideration of the entire issue fell for
consideration before this Court, it is therefore, this Court is of the opinion that
the present batch of the writ petitions can be disposed of by granting liberty to
the Respondent No.1 for reconsideration/revisit the mining leases already
granted for Bauxite to the extents of 85.000, 617.00 and 460.00 Hectors in
Jareela Block-I, II, III & VIII of Chintapali R.F., Visakhapatnam District in
favour of M/s. APMDC.
23.
Accordingly, Writ Petitions are disposed of. No order as to costs.
24. Consequently, miscellaneous petitions pending, if any, shall also stand
closed.
______________________________________
JUSTICE VENKATESWARLU NIMMAGADDA
Date: 03.07.2026
MNR
HONOURABLE SRI JUSTICE VENKATESWARLU NIMMAGADDA
W.P NOS: 13625, 13628, 13630 OF 2026, 12474 of 2016
AND W.P NO.1108 OF 2017
Dt: 03.07.2026
Mnr
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review