WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
RESERVED ON 10TH JUNE 2026
IN THE HIGH COURT OF KARNATAKA AT BENGALURU
DATED THIS THE 28TH DAY OF AUGUST, 2026
PRESENT
THE HON'BLE MR. VIBHU BAKHRU, CHIEF JUSTICE
AND
THE HON'BLE MRS. JUSTICE K.S. HEMALEKHA
WRIT APPEAL NO.1961 OF 2025 (GM-RES)
C/W
WRIT APPEAL NO.1703 OF 2025 (GM-RES)
WRIT APPEAL NO.1708 OF 2025 (GM-RES)
WRIT APPEAL NO.1963 OF 2025 (GM-RES)
WRIT APPEAL NO.1965 OF 2025 (GM-RES)
WRIT APPEAL NO.1992 OF 2025 (GM-RES)
WRIT APPEAL NO.569 OF 2026 (GM-RES)
WRIT APPEAL NO.570 OF 2026 (GM-RES)
C K LATHA
Location: High
Court of Karnataka
IN W.A. NO.1961/2025
BETWEEN:
CENTRAL TRANSMISSION UTILITY OF INDIA
A SUBSIDIARY OF POWER GRID
CORPORATION OF INDIA PRIVATE LIMITED
HAVING ITS REGISTERED OFFICE AT
PLOT NO.2, SECTOR-29
NEAR IFFCO CHOWK METRO STATION
GURGAON-122001
REPRESENTED BY ITS
SENIOR GENERAL MANAGER.
…APPELLANT
-2-
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
(BY SRI. S.S. NAGANAND, SENIOR ADVOCATE A/W
SMT. SUMANA NAGANAND, ADVOCATE,
MR. SHUBHAM ARYA, ADVOCATE,
MS. PALLAVI SAIGAL, ADVOCATE)
AND:
1.
RAYS POWER INFRA LIMITED
A COMPANY INCORPORATED UNDER THE
PROVISION OF THE COMPANIES ACT, 2013
HAVING ITS REGISTERED OFFICE AT
1ST - 21 EVERSHINE MALL
NORTH METER CABIN 1,
MALAD WEST MUMBAI-400064
REPRESENTED BY ITS AUTHORISED SIGNATORY.
2.
STATE OF KARNATAKA
DEPARTMENT OF ENERGY,
VIKASA SOUDHA
DR. B.R. AMBEDKAR VEEDHI,
BANGALORE-560001.
REPRESENTED BY ITS
ADDITIONAL CHIEF SECRETARY.
3.
KARNATAKA RENEWABLE ENERGY
DEVELOPMENT LTD.,
GOVERNMENT OF KARNATAKA UNDERTAKING
#6/13/1, 10TH BLOCK,
2ND STAGE, NAGARBHAVI,
BANGALORE-560072.
REPRESENTED BY ITS
MANAGING DIRECTOR.
4.
UNION OF INDIA
MINISTRY OF NEW AND RENEWABLE ENERGY
BLOCK 14 CGO COMPLEX
LODHI ROAD, NEW DELHI-110003
REPRESENTED BY SECRETARY.
5.
CENTRAL ELECTRICITY REGULATORY COMMISSION
6TH 7TH AND 8TH FLOORS, TOWER B,
WORLD TRADE CENTRE NAUROJI NAGAR,
NEW DELHI-110029.
REPRESENTED BY ITS SECRETARY.
-3-
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
6.
ACME SOLAR HOLDING LTD.,
NO.152, SECTOR 44, GURGAON,
HARYANA - 122002.
7.
AMPIN ENERGY UTILITY PRIVATE LIMITED
308, 3RD FLOOR, RECTANGLE ONE,
BEHIND SHERATON HOTEL,
SAKET, NEW DELHI - 110017.
8.
AMPIN ENERGY C & I FOURTEEN PVT. LTD.,
308, 3RD FLOOR, RECTANGLE ONE,
BEHIND SHERATON HOTEL,
SAKET, NEW DELHI - 110017.
9.
AMPIN ENERGY C & I TWENTYEIGHT PVT. LTD.,
308, 3RD FLOOR, RECTANGLE ONE,
BEHIND SHERATON HOTEL,
SAKET, NEW DELHI - 110017.
10. AMPIN ENERGY C & I TWENTYNINE PVT. LTD.
308, 3RD FLOOR, RECTANGLE ONE,
BEHIND SHERATON HOTEL,
SAKET, NEW DELHI - 110017.
11. ESSAR RENEWABLES LIMITED
ESSAR HOUSE, 11 K.K. MARG,
MAHALAKSHMI, HAJI ALI,
MUMBAI - 400034.
…RESPONDENTS
(BY SRI. G.S. KANNUR, SENIOR ADVOCATE A/W
SRI. ABHINAY S., ADVOCATE FOR C/R-1;
SRI. RUBEN JACOB, AAG A/W
SRI. K.S. HARISH, GOVERNMENT ADVOCATE FOR R-2;
SRI. RUBEN JACOB, SENIOR ADVOCATE A/W
SRI. PIYUSH JAIN D. KUMAR, ADVOCATE FOR R-3;
SMT. SADHANA S. DESAI, CGC FOR R-4 & R-5;
R-6, R-8 & R-10 ARE SERVED & UNREPRESENTED;
SRI. ROHAN SACHDEV, ADVOCATE FOR R-7;
MS. MANASA SUNDARRAMAN, ADVOCATE &
SRI. DEEP RAO PALEPU, ADVOCATE FOR R-11)
-4-
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
THIS WRIT APPEAL IS FILED UNDER SECTION 4 OF THE
KARNATAKA HIGH COURT ACT PRAYING TO SET ASIDE THE
ORDER DATED 09/09/2025 PASSED BY THE LEARNED SINGLE
JUDGE IN W.P.NO.21533/2024 (GM-RES) AND CONSEQUENTLY
DISMISS THE WRIT PETITION.
IN W.A. NO.1703/2025
BETWEEN:
ESSAR RENEWABLES LIMITED
A COMPANY INCORPORATED UNDER THE
PROVISION OF THE COMPANIES ACT, 2013
HAVING ITS REGISTERED OFFICE AT:
ESSAR HOUSE, 11 K K MARG,
MAHALAXMI, HAJI ALI, MUMBAI,
MAHARASHTRA - 400034.
AUTHORIZED SIGNATORY
MR. TN SANTOSH KUMAR.
...APPELLANT
(BY SRI. MOHAMMED SHAMEER, ADVOCATE &
SRI DEEP RAO PALEPU, ADVOCATE)
AND:
1.
M/S. RAYS POWER INFRA LIMITED
A COMPANY INCORPORATED UNDER THE
PROVISION OF THE COMPANIES ACT, 2013
HAVING ITS REGISTERED OFFICE AT:
1ST, 21 EVERSHINE MALL,
NORTH METER CABIN 1, MALAD,
WEST MUMBAI, MUMBAI,
MAHARASHTRA - 400 064,
THROUGH ITS AUTHORISED SIGNATORY
MR. SANNA THIPPESWAMY,
LEGAL MANAGER.
2.
THE STATE OF KARNATAKA
DEPARTMENT OF ENERGY,
VIKASA SOUDHA,
DR. B.R. AMBEDKAR VEEDHI,
BENGALURU - 560001.
THROUGH THE ADDITIONAL
-5-
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
CHIEF SECRETARY TO THE
GOVERNMENT OF KARNATAKA.
3.
KARNATAKA RENEWABLE ENERGY
DEVELOPMENT LIMITED,
GOVERNMENT OF KARNATAKA UNDERTAKING,
NO.6/13/1, 10TH BLOCK, 2ND STAGE,
NAGARABHAVI, BANGALORE,
KARNATAKA - 560072.
REPRESENTED BY ITS
MANAGING DIRECTOR.
4.
CENTRAL TRANSMISSION UTILITY OF INDIA LIMITED
HAVING ITS OFFICE AT:
PLOT NO.2, SECTOR 29,
NEAR IFFCO CHOWK METRO STATION,
GURUGRAM, HARYANA - 122001.
REPRESENTED BY ITS MANAGING DIRECTOR.
5.
UNION OF INDIA
REPRESENTED BY ITS SECRETARY,
MINISTRY OF NEW AND RENEWABLE
ENERGY, GOVERNMENT OF INDIA
HAVING ITS OFFICE AT:
BLOCK 14, CGO COMPLEX,
LODHI ROAD, NEW DELHI - 110003.
6.
CENTRAL ELECTRICITY REGULATORY COMMISSION
THROUGH ITS SECRETARY,
HAVING ITS REGISTERED OFFICE
AT: 6TH, 7TH AND 8TH FLOORS,
TOWER B, WORLD TRADE CENTRE,
NAUROJI NAGAR,
NEW DELHI-110029.
7.
ACME SOLAR HOLDINGS LIMITED
THROUGH ITS AUTHORISED SIGNATORY
HAVING ITS REGISTERED OFFICE AT:
PLOT NO.152, SECTOR 44,
GURUGRAM, HARYANA - 122002.
8.
AMPIN ENERGY UTILITY PRIVATE LIMITED
ADDRESS: 308, 3RD FLOOR,
RECTANGLE ONE,
-6-
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
BEHIND SHERATON HOTEL,
SAKET, NEW DELHI - 110017
REPRESENTED BY ITS
AUTHORIZED BISWAJIT JANA.
9.
AMPIN ENERGY C & I FOURTEEN PRIVATE LIMITED
(FORMERLY KNOWN AS AMP ENERGY
C & I FOURTEEN PRIVATE LIMITED)
ADDRESS - 308, 3RD FLOOR,
RECTANGLE ONE, BEHIND SHERATON HOTEL,
SAKET, NEW DELHI - 110017
REPRESENTED BY ITS
AUTHORIZED BISWAJIT JANA.
10.
AMPIN ENERGY C & I TWENTY-EIGHT PRIVATE LIMITED
(FORMERLY KNOWN AS AMP ENERGY
AND C & I TWENTY-EIGHT PRIVATE LIMITED)
ADDRESS - 308, 3RD FLOOR,
RECTANGLE ONE, BEHIND SHERATON HOTEL,
SAKET, NEW DELHI - 110017
REPRESENTED BY ITS
AUTHORIZED BISWAJIT JANA.
11.
AMPIN ENERGY C & I TWENTY-NINE PRIVATE LIMITED
(FORMERLY KNOWN AS AMP ENERGY
C & I TWENTY-NINE PRIVATE LIMITED)
ADDRESS - 308, 3RD FLOOR,
RECTANGLE ONE,
BEHIND SHERATON HOTEL,
SAKET, NEW DELHI - 110017.
...RESPONDENTS
(BY SRI. G.S. KANNUR, SENIOR ADVOCATE A/W
SRI. ABHINAY S., ADVOCATE FOR C/R-1;
SRI. RUBEN JACOB, AAG A/W
SRI. K.S. HARISH, GOVERNMENT ADVOCATE FOR R-2;
SRI. RUBEN JACOB, SENIOR ADVOCATE A/W
SRI. PIYUSH KUMAR JAIN, ADVOCATE FOR R-3)
THIS WRIT APPEAL IS FILED UNDER SECTION 4 OF THE
KARNATAKA HIGH COURT ACT PRAYING TO SET ASIDE THE
IMPUGNED JUDGMENT DATED 09.09.2025 PASSED BY THE
LEARNED SINGLE JUDGE OF THIS HON'BLE COURT IN
W.P.NO.21533 OF 2024 (GM-RES) AND DISMISS THE SAID WRIT
PETITION.
-7-
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
IN W.A. NO.1708/2025
BETWEEN:
ESSAR RENEWABLES LIMITED
A COMPANY INCORPORATED UNDER THE
PROVISION OF THE COMPANIES ACT, 2013,
HAVING ITS REGISTERED OFFICE AT:
ESSAR HOUSE, 11 K K MARG,
MAHALAXMI, HAJI ALI, MUMBAI,
MAHARASHTRA-400 034.
AUTHORISED SIGNATORY
MR. TN SANTOSH KUMAR.
...APPELLANT
(BY SRI. MOHAMMED SHAMEER, ADVOCATE &
SRI DEEP RAO PALEPU, ADVOCATE)
AND:
1.
M/S. RAYS POWER INFRA LIMITED
A COMPANY INCORPORATED UNDER THE
PROVISION OF THE COMPANIES ACT, 2013
HAVING ITS REGISTERED OFFICE
AT: 1ST, 21 EVERSHINE MALL,
NORTH METER CABIN 1,
MALAD, WEST MUMBAI,
MUMBAI, MAHARASHTRA-400 064.
THROUGH ITS AUTHORISED SIGNATORY,
MR. SANNA THIPPESWAMY
LEGAL MANAGER.
2.
RAYSALFA POWER PRIVATE LIMITED
A COMPANY INCORPORATED UNDER THE
PROVISION OF THE COMPANIES ACT, 2013
HAVING ITS REGISTERED OFFICE
AT: 605, 6TH FLOOR, MANJUSHA BUILDING,
57 NEHRU PLACE, NEW DELHI
SOUTH DELHI-110 019.
THROUGH ITS AUTHORISED SIGNATORY,
MR. SANNA THIPPESWAMY
-8-
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
3.
DADUR SOLAR POWER PRIVATE LIMITED
A COMPANY INCORPORATED UNDER THE
PROVISION OF THE COMPANIES ACT, 2013
HAVING ITS REGISTERED OFFICE
AT: D-43, JANPATH, SHYAM NAGAR,
JAIPUR, RAJASTHAN-302 019.
THROUGH ITS AUTHORISED SIGNATORY,
MR. SANNA THIPPESWAMY
4.
NILAJ SOLAR POWER PRIVATE LIMITED
A COMPANY INCORPORATED UNDER THE
PROVISION OF THE COMPANIES ACT, 2013
HAVING ITS REGISTERED OFFICE
AT: P. NO.65, SARDAR PATEL MARG,
C-SCHEME, ASHOK NAGAR,
JAIPUR, RAJASTHAN-302 001.
THROUGH ITS AUTHORISED SIGNATORY,
MR. SANNA THIPPESWAMY.
5.
ANNIGERI SOLAR POWER PRIVATE LIMITED
A COMPANY INCORPORATED UNDER THE
PROVISION OF THE COMPANIES ACT, 2013
HAVING ITS REGISTERED OFFICE AT:
SARDAR PATEL MARG, C-SCHEME,
ASHOK NAGAR, JAIPUR,
RAJASTHAN-302 001.
THROUGH ITS AUTHORISED SIGNATORY,
MR. SANNA THIPPESWAMY.
6.
SIRA SOLAR POWER PRIVATE LIMITED
A COMPANY INCORPORATED UNDER THE
PROVISION OF THE COMPANIES ACT, 2013
HAVING ITS REGISTERED OFFICE AT:
65, SARDAR PATEL MARG, C-SCHEME,
ASHOK NAGAR, JAIPUR,
RAJASTHAN-302 001.
THROUGH ITS AUTHORISED SIGNATORY,
MR. SANNA THIPPESWAMY.
7.
THE STATE OF KARNATAKA
DEPARTMENT OF ENERGY,
VIKASA SOUDHA,
DR. B.R. AMBEDKAR VEEDHI,
BENGALURU-560 001.
-9-
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
REPRESENTED BY THE
ADDITIONAL CHIEF SECRETARY
TO THE GOVERNMENT.
8.
KARNATAKA RENEWABLE ENERGY
DEVELOPMENT LIMITED
GOVERNMENT OF KARNATAKA UNDERTAKING,
NO.6/13/1, 10TH BLOCK,
2ND STAGE, NAGARABHAVI,
BANGALORE-560072
REPRESENTED BY ITS
MANAGING DIRECTOR.
9.
CENTRAL TRANSMISSION UTILITY OF INDIA LIMITED
HAVING ITS OFFICE AT:
PLOT NO.2 SECTOR 29,
NEAR IFFCO CHOWK METRO STATION,
GURAGON, HARYANA - 122 001.
REPRESENTED BY ITS
MANAGING DIRECTOR.
10.
UNION OF INDIA
REPRESENTED BY ITS SECRETARY,
MINISTRY OF NEW AND RENEWABLE ENERGY,
BLOCK 14, CGO COMPLEX,
LODHI ROAD, NEW DELHI-110 003.
11.
ACME SOLAR HOLDINGS LIMITED
THROUGH ITS AUTHORISED SIGNATORY,
HAVING ITS REGISTERED OFFICE AT:
PLOT NO.152, SECTOR 44,
GURUGRAM, HARYANA-122 002.
12.
AMPIN ENERGY UTILITY PRIVATE LIMITED
ADDRESS: 308, 3RD FLOOR,
RECTANGLE ONE, BEHIND SHERATON HOTEL,
SAKET, NEW DELHI - 110017
REPRESENTED BY ITS
AUTHORIZED BISWAJIT JANA.
13.
AMPIN ENERGY C & I FOURTEEN PRIVATE LIMITED
(FORMERLY KNOWN AS AMP ENERGY
C & I FOURTEEN PRIVATE LIMITED)
ADDRESS: 308, 3RD FLOOR,
- 10 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
RECTANGLE ONE, BEHIND SHERATON HOTEL,
SAKET, NEW DELHI - 110017
REPRESENTED BY ITS
AUTHORIZED BISWAJIT JANA.
14.
AMPIN ENERGY C & I TWENTY-EIGHT PRIVATE LIMITED
(FORMERLY KNOWN AS AMP ENERGY
C & I TWENTY-EIGHT PRIVATE LIMITED)
ADDRESS: 308, 3RD FLOOR,
RECTANGLE ONE, BEHIND SHERATON HOTEL,
SAKET, NEW DELHI - 110017
REPRESENTED BY ITS
AUTHORIZED BISWAJIT JANA.
15.
AMPIN ENERGY C & I TWENTY-NINE PRIVATE LIMITED
(FORMERLY KNOWN AS AMP ENERGY
AND C & I TWENTY-NINE PRIVATE LIMITED)
ADDRESS: 308, 3RD FLOOR,
RECTANGLE ONE, BEHIND SHERATON HOTEL,
SAKET, NEW DELHI - 110017.
...RESPONDENTS
(BY SRI. RUBEN JACOB, AAG A/W
SRI. K.S. HARISH, GOVERNMENT ADVOCATE FOR R-7;
SRI. RUBEN JACOB, SENIOR ADVOCATE A/W
SRI. PIYUSH KUMAR JAIN, ADVOCATE FOR R-8)
THIS WRIT APPEAL IS FILED UNDER SECTION 4 OF THE
KARNATAKA HIGH COURT ACT PRAYING TO SET ASIDE THE
ORDER DATED 09.09.2025 PASSED BY THE LEARNED SINGLE
JUDGE OF THIS HON'BLE COURT IN W.P.NO.35002/2024 FILED BY
THE RESPONDENT NOS.1 - 6 BEFORE THE HON'BLE HIGH COURT
OF KARNATAKA.
IN W.A. NO.1963/2025
BETWEEN:
1.
AMPIN ENERGY UTILITY PRIVATE LIMITED
THROUGH ITS AUTHORISED SIGNATORY
HAVING ITS REGISTERED OFFICE AT:
309, 3RD FLOOR, RECTANGLE ONE,
BEHIND SHERATON HOTEL,
SAKET, NEW DELHI-110017.
- 11 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
2.
AMPIN ENERGY C & I FOURTEEN PRIVATE LIMITED
(FORMERLY KNOWN AS AMP ENERGY
C & I FOURTEEN PRIVATE LIMITED)
THROUGH ITS AUTHORISED SIGNATORY
HAVING ITS REGISTERED OFFICE AT:
309, 3RD FLOOR, RECTANGLE ONE,
BEHIND SHERATON HOTEL,
SAKET, NEW DELHI-110017.
3.
AMPIN ENERGY C & I TWENTY-EIGHT PRIVATE LIMITED
(FORMERLY KNOWN AS AMP ENERGY
C & I TWENTY-EIGHT PRIVATE LIMITED)
THROUGH ITS AUTHORISED SIGNATORY
HAVING ITS REGISTERED OFFICE AT:
309, 3RD FLOOR, RECTANGLE ONE,
BEHIND SHERATON HOTEL,
SAKET, NEW DELHI-110017.
4.
AMPIN ENERGY C & I TWENTY-NINE PRIVATE LIMITED
(FORMERLY KNOWN AS AMP ENERGY
C & I TWENTY-NINE PRIVATE LIMITED)
THROUGH ITS AUTHORISED SIGNATORY
HAVING ITS REGISTERED OFFICE AT:
309, 3RD FLOOR, RECTANGLE ONE,
BEHIND SHERATON HOTEL,
SAKET, NEW DELHI-110017.
...APPELLANTS
(BY SRI. ROHAN SACHDEV, ADVOCATE &
SRI. MOHAMMED SHAMEER, ADVOCATE)
AND:
1.
M/S. RAYS POWER INFRA LIMITED
THROUGH ITS AUTHORISED SIGNATORY,
HAVING ITS REGISTERED OFFICE AT:
1ST, 21 EVERSHINE MALL,
NORTH METER CABIN 1, MALAD,
WEST MUMBAI, MUMBAI,
MAHARASHTRA - 400064.
2.
THE STATE OF KARNATAKA
THROUGH THE ADDITIONAL CHIEF SECRETARY
TO THE GOVERNMENT OF KARNATAKA,
- 12 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
HAVING ITS OFFICE AT:
DEPARTMENT OF ENERGY,
VIKASA SOUDHA,
DR. B.R. AMBEDKAR VEEDHI,
BENGALURU, KARNATAKA - 560001.
3.
KARNATAKA RENEWABLE ENERGY
DEVELOPMENT LIMITED
THROUGH ITS MANAGING DIRECTOR,
HAVING ITS REGISTERED OFFICE AT:
GOVERNMENT OF KARNATAKA UNDERTAKING,
UNDERTAKING NO.6/13/1, 10TH BLOCK,
2ND STAGE, NAGARABHAVI,
BANGALORE, KARNATAKA - 560072.
4.
CENTRAL TRANSMISSION
UTILITY OF INDIA LIMITED
THROUGH ITS MANAGING DIRECTOR,
HAVING ITS OFFICE AT:
PLOT NO.2, SECTOR 29,
NEAR IFFCO CHOWK METRO STATION,
GURUGRAM, HARYANA-122001.
5.
UNION OF INDIA
THROUGH THE SECRETARY,
MINISTRY OF NEW AND RENEWABLE ENERGY,
GOVERNMENT OF INDIA
HAVING ITS OFFICE AT:
BLOCK 14, CGO COMPLEX,
LODHI ROAD, NEW DELHI -110003.
6.
CENTRAL ELECTRICITY
REGULATORY COMMISSION
THROUGH ITS SECRETARY
HAVING ITS REGISTERED OFFICE AT:
6TH, 7TH, 8TH FLOORS, TOWER B,
WORLD TRADE CENTRE,
NAUROJI NAGAR, NEW DELHI - 110029.
7.
ACME SOLAR HOLDINGS LIMITED
THROUGH ITS AUTHORISED SIGNATORY
HAVING ITS REGISTERED OFFICE AT
PLOT NO.152, SECTOR 44,
GURUGRAM, HARYANA - 122002.
- 13 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
8.
ESSAR RENEWABLES LIMITED
THROUGH ITS AUTHORISED SIGNATORY
HAVING ITS REGISTERED OFFICE AT
ESSAR HOUSE, 11 K K MARG,
MAHALAXMI, HAJI ALI, MUMBAI,
MAHARASHTRA - 400034.
...RESPONDENTS
(BY SRI. RUBEN JACOB, AAG A/W
SRI. K.S. HARISH, GOVERNMENT ADVOCATE FOR R-2;
SMT. SADHANA S. DESAI, CGC FOR R-5;
SRI RUBEN JACOB, SENIOR COUNSEL A/W
SRI PIYUSH KUMAR JAIN D., ADVOCATE FOR R-8)
THIS WRIT APPEAL FILED U/S 4 OF THE KARNATAKA HIGH
COURT ACT PRAYING TO SET ASIDE THE ORDER DATED
09.09.2025 PASSED BY THE LEARNED SINGLE JUDGE OF THIS
HON'BLE COURT IN W.P.NO.21533 OF 2024.
IN W.A. NO.1965/2025
BETWEEN:
1.
AMPIN ENERGY UTILITY PRIVATE LIMITED
THROUGH ITS AUTHORISED SIGNATORY
HAVING ITS REGISTERED OFFICE AT:
309, 3RD FLOOR, RECTANGLE ONE,
BEHIND SHERATON HOTEL,
SAKET, NEW DELHI-110017.
2.
AMPIN ENERGY C & I FOURTEEN PRIVATE LIMITED
(FORMERLY KNOWN AS AMP ENERGY
C & I FOURTEEN PRIVATE LIMITED)
THROUGH ITS AUTHORISED SIGNATORY
HAVING ITS REGISTERED OFFICE AT:
309, 3RD FLOOR, RECTANGLE ONE,
BEHIND SHERATON HOTEL,
SAKET, NEW DELHI-110017.
3.
AMPIN ENERGY C & I TWENTY-EIGHT PRIVATE LIMITED
(FORMERLY KNOWN AS AMP ENERGY
C & I TWENTY-EIGHT PRIVATE LIMITED)
THROUGH ITS AUTHORISED SIGNATORY
- 14 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
HAVING ITS REGISTERED OFFICE AT:
309, 3RD FLOOR, RECTANGLE ONE,
BEHIND SHERATON HOTEL,
SAKET, NEW DELHI-110017.
4.
AMPIN ENERGY C & I TWENTY-NINE PRIVATE LIMITED
(FORMERLY KNOWN AS AMP ENERGY
C & I TWENTY-NINE PRIVATE LIMITED)
THROUGH ITS AUTHORISED SIGNATORY
HAVING ITS REGISTERED OFFICE AT:
309, 3RD FLOOR, RECTANGLE ONE,
BEHIND SHERATON HOTEL,
SAKET, NEW DELHI-110017.
...APPELLANTS
(BY SRI. ROHAN SACHDEV, ADVOCATE AND
SRI. MOHAMMED SHAMEER, ADVOCATE)
AND:
1.
M/S. RAYS POWER INFRA LIMITED
THROUGH ITS AUTHORIZED SIGNATORY
HAVING ITS REGISTERED OFFICE AT:
1ST, 21 EVERSHINE MALL,
NORTH METER CABIN 1, MALAD,
WEST MUMBAI, MUMBAI,
MAHARASHTRA-400064.
2.
RAYSALFA POWER PRIVATE LIMITED
THROUGH ITS AUTHORIZED SIGNATORY
HAVING ITS REGISTERED OFFICE AT:
605, SIXTH FLOOR, MANJUSHA BUILDING,
57 NEHRU PLACE, NEW DELHI-110019.
3.
DADUR SOLAR POWER PRIVATE LIMITED
THROUGH ITS AUTHORIZED SIGNATORY
HAVING ITS REGISTERED OFFICE AT:
D-43, JANPATH, SHYAM NAGAR,
JAIPUR-302019.
4.
NILAJ SOLAR POWER PRIVATE LIMITED
THROUGH ITS AUTHORIZED SIGNATORY
HAVING ITS REGISTERED OFFICE AT:
P.NO.65, SARDAR PATEL MARG,
- 15 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
C-SCHEME, ASHOK NAGAR,
JAIPUR-302001.
5.
ANNIGERI SOLAR POWER PRIVATE LIMITED
THROUGH ITS AUTHORIZED SIGNATORY
HAVING ITS REGISTERED OFFICE AT:
65, SARDAR PATEL MARG, C-SCHEME,
ASHOK NAGAR, JAIPUR-302001.
6.
SIRA SOLAR POWER PRIVATE LIMITED
THROUGH ITS AUTHORIZED SIGNATORY
HAVING ITS REGISTERED OFFICE AT:
65, SARDAR PATEL MARG, C-SCHEME,
ASHOK NAGAR, JAIPUR-302001.
7.
THE STATE OF KARNATAKA
THROUGH THE ADDITIONAL CHIEF SECRETARY
TO THE GOVERNMENT OF KARNATAKA
HAVING ITS OFFICE AT:
DEPARTMENT OF ENERGY,
VIKASA SOUDHA, DR. B.R. AMBEDKAR VEEDHI,
BENGALURU, KARNATAKA-560001.
8.
KARNATAKA RENEWABLE ENERGY
DEVELOPMENT LTD.,
THROUGH ITS MANAGING DIRECTOR
HAVING ITS REGISTERED OFFICE AT:
GOVERNMENT OF KARNATAKA UNDERTAKING,
UNDERTAKING NO.6/13/1,
10TH BLOCK, 2ND STAGE,
NAGARABHAVI, BANGALORE,
KARNATAKA-560072.
9.
CENTRAL TRANSMISSION UTILITY OF INDIA LIMITED
THROUGH ITS MANAGING DIRECTOR
HAVING ITS OFFICE AT:
PLOT NO.2, SECTOR 29,
NEAR IFFCO CHOWK METRO STATION
GURUGRAM, HARYANA-122001.
10.
UNION OF INDIA
THROUGH THE SECRETARY,
MINISTRY OF NEW AND RENEWABLE ENERGY,
GOVERNMENT OF INDIA
- 16 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
HAVING ITS OFFICE AT: BLOCK 14,
C.G.O. COMPLEX, LODHI ROAD,
NEW DELHI-110003.
11.
ACME SOLAR HOLDINGS LIMITED
THROUGH ITS AUTHORISED SIGNATORY
HAVING ITS REGISTERED OFFICE AT:
PLOT NO.152, SECTOR 44,
GURUGRAM, HARYANA-122002.
12.
ESSAR RENEWABLES LIMITED,
THROUGH ITS AUTHORISED SIGNATORY
HAVING ITS REGISTERED OFFICE AT:
ESSAR HOUSE, 11 K K MARG,
MAHALAXMI, HAJI ALI, MUMBAI,
MAHARASHTRA-400034.
...RESPONDENTS
(BY SRI. RUBEN JACOB, AAG A/W
SRI. K.S. HARISH, GOVERNMENT ADVOCATE FOR R-7;
SRI RUBEN JACOB, SENIOR COUNSEL A/W
SRI PIYUSH KUMAR JAIN D., ADVOCATE FOR R-8;
SMT. SADHANA S. DESAI, CGC FOR R-10)
THIS WRIT APPEAL IS FILED UNDER SECTION 4 OF THE
KARNATAKA HIGH COURT ACT PRAYING TO SET ASIDE THE
ORDER DATED 09.09.2025 PASSED BY THE LEARNED SINGLE
JUDGE OF THIS HON'BLE COURT IN W.P.NO.35002 OF 2024 AND
ETC.,
IN W.A. NO.1992/2025
BETWEEN:
CENTRAL TRANSMISSION UTILITY OF INDIA LIMITED
A SUBSIDIARY OF POWER GRID
CORPORATION OF INDIA PRIVATE LIMITED
HAVING ITS REGISTERED OFFICE AT
PLOT NO.2, SECTOR-29
NEAR IFFCO CHOWK METRO STATION
GURGAON-122001
REP. BY ITS SENIOR GENERAL MANAGER.
...APPELLANT
- 17 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
(BY SRI. TUSHAR MEHTA, SOLICITOR GENERAL OF INDIA,
SRI. S.S. NAGANAND, SENIOR COUNSEL,
SMT. SUMANA NAGANAND, ADVOCATE,
MR. SHUBHAM ARYA, ADVOCATE,
MS. PALLAVI SAIGAL, ADVOCATE)
AND:
1.
M/S RAYS POWER INFRA LIMITED
A COMPANY INCORPORATED UNDER
THE PROVISION OF THE COMPANIES ACT, 2013
HAVING ITS REGISTERED OFFICE AT
1ST, 21 EVERSHINE MALL,
NORTH METER CABIN
1 MALAD, WEST MUMBAI-400064
REP. BY ITS AUTHORIZED SIGNATORY.
2.
RAYSALFA POWER PRIVATE LIMITED
A COMPANY INCORPORATED UNDER
THE PROVISION OF THE COMPANIES ACT 2013
HAVING ITS REGISTERED OFFICE AT
605, 6TH FLOOR, MANJUSHA BUILDING,
57 NEHRU PLACE DELHI,
SOUTH DELHI-110019
REP. BY ITS AUTHORIZED SIGNATORY.
3.
DADUR SOLAR POWER PRIVATE LIMITED
A COMPANY INCORPORATED UNDER THE
PROVISION OF THE COMPANIES ACT, 2013
HAVING ITS REGISTERED OFFICE AT
D-43, JANPATH, SHYAM NAGAR,
JAIPUR-302019
REP. BY ITS AUTHORIZED SIGNATORY.
4.
NILAJ SOLAR POWER PRIVATE LIMITED
A COMPANY INCORPORATED UNDER THE
PROVISION OF THE COMPANIES ACT, 2013
HAVING ITS REGISTERED OFFICE AT
P.NO.65, SARDAR PATEL MARG,
C-SCHEME ASHOK NAGAR,
JAIPUR-302001
REP. BY ITS AUTHORIZED SIGNATORY.
- 18 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
5.
ANNIGERI SOLAR POWER PRIVATE LIMITED
A COMPANY INCORPORATED UNDER THE
PROVISION OF THE COMPANIES ACT, 2013
HAVING ITS REGISTERED OFFICE AT
SARDAR PATEL MARG,
C-SCHEME ASHOK NAGAR,
JAIPUR-302001
REP. BY ITS AUTHORIZED SIGNATORY.
6.
SIRA SOLAR POWER PRIVATE LIMITED
A COMPANY INCORPORATED UNDER THE
PROVISION OF THE COMPANIES ACT, 2013
HAVING ITS REGISTERED OFFICE AT
65, SARDAR PATEL MARG,
C-SCHEME ASHOK NAGAR,
JAIPUR-302001.
REP. BY ITS AUTHORIZED SIGNATORY.
7.
STATE OF KARNATAKA
DEPARTMENT OF ENERGY,
VIKASA SOUDHA,
DR. B.R. AMBEDKAR VEEDHI,
BANGALORE-560001.
REPRESENTED BY ITS
ADDITIONAL CHIEF SECRETARY.
8.
KARNATAKA RENEWABLE ENERGY
DEVELOPMENT LTD.,
GOVERNMENT OF KARNATAKA UNDERTAKING,
#6/13/1, 10TH BLOCK, 2ND STAGE,
NAGARBHAVI,
BANGALORE-560072
REPRESENTED BY ITS
MANAGING DIRECTOR.
9.
UNION OF INDIA
MINISTRY OF NEW AND RENEWABLE ENERGY
BLOCK 14 CGO COMPLEX
LODHI ROAD, NEW DELHI-110003
REPRESENTED BY SECRETARY.
10.
ACME SOLAR HOLDING LTD.,
NO.152, SECTOR 44,
GURGAON, HARYANA-122002.
- 19 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
11.
AMPIN ENERGY UTILITY PRIVATE LIMITED
308, 3RD FLOOR, RECTANGLE ONE,
BEHIND SHERATON HOTEL,
SAKET, NEW DELHI-110017.
12.
AMPIN ENERGY C & I FOURTEEN PVT. LTD.
308, 3RD FLOOR, RECTANGLE ONE,
BEHIND SHERATON HOTEL,
SAKET, NEW DELHI-110017.
13.
AMPIN ENERGY C & I TWENTY EIGHT PVT. LTD.,
308, 3RD FLOOR, RECTANGLE ONE,
BEHIND SHERATON HOTEL,
SAKET, NEW DELHI-110017.
14.
AMPIN ENERGY C & I TWENTY NINE PVT. LTD.,
308, 3RD FLOOR, RECTANGLE ONE,
BEHIND SHERATON HOTEL,
SAKET, NEW DELHI-110017.
15.
ESSAR RENEWABLES LIMITED
ESSAR HOUSE, 11 K.K. MARG,
MAHALAKSHMI, HAJI ALI,
MUMBAI - 400034.
...RESPONDENTS
(BY SRI. K.G. RAGHAVAN, SENIOR COUNSEL,
SRI. G.S. KANNUR, SENIOR COUNSEL,
SRI. ABHINAY S. ADVOCATE FOR R-1 TO R-6;
SRI. RUBEN JACOB, AAG A/W
SRI. K.S. HARISH, GOVERNMENT ADVOCATE FOR R-7;
SRI. RUBEN JACOB, SENIOR COUNSEL A/W
SRI. PIYUSH KUMAR JAIN D., ADVOCATE FOR R-8;
SMT. SADHANA DESAI, CGC FOR R-9 ;
MS. MANASA SUNDARRAMAN, ADVOCATE FOR R-15)
THIS WRIT APPEAL IS FILED UNDER SECTION 4 OF THE
KARNATAKA HIGH COURT ACT PRAYING TO SET ASIDE THE
ORDER DATED 09.09.2025 PASSED BY THE LEARNED SINGLE
JUDGE IN W.P.NO.35002/2024 (GM-RES) AND CONSEQUENTLY
DISMISS THE WRIT PETITION.
- 20 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
IN W.A. NO.569/2026
BETWEEN:
M/S. RAYS POWER INFRA LIMITED
A COMPANY INCORPORATED UNDER THE
PROVISIONS OF THE COMPANIES ACT, 2013
HAVING ITS REGISTERED OFFICE AT
1ST-21 EVERSHINE MALL NORTH METER
CABIN 1, MALAD WEST, MUMBAI-400064
REPRESENTED BY ITS
AUTHORISED SIGNATORY
MR. SANNA THIPPESWAMY.
...APPELLANT
(BY SRI. K.G. RAGHAVAN, SENIOR COUNSEL A/W
SRI. ABHINAY S., ADVOCATE)
AND:
1.
THE STATE OF KARNATAKA
DEPARTMENT OF ENERGY,
VIKASA SOUDHA,
DR. B.R. AMBEDKAR VEEDHI,
BANGALORE-560 001
REPRESENTED BY THE ADDITIONAL
CHIEF SECRETARY TO THE GOVERNMENT.
2.
KARNATAKA RENEWABLE ENERGY
DEVELOPMENT LTD.,
GOVERNMENT OF KARNATAKA UNDERTAKING
#6/13/1, 10TH BLOCK, 2ND STAGE,
NAGARABHAVI, BANGALORE-560072.
REPRESENTED BY ITS
MANAGING DIRECTOR.
3.
CENTRAL TRANSMISSION UTILITY OF INDIA LIMITED
HAVING ITS REGISTERED OFFICE AT
PLOT NO.2, SECTOR-29
NEAR IFFCO CHOWK METRO STATION
GURAGON-122001
REPRESENTED BY ITS
MANAGING DIRECTOR.
- 21 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
4.
UNION OF INDIA
REPRESENTED BY SECRETARY
MINISTRY OF NEW AND RENEWABLE ENERGY,
BLOCK 14 C.G.O. COMPLEX
LODHI ROAD, NEW DELHI-110003.
5.
CENTRAL ELECTRICITY REGULATORY COMMISSION
6TH, 7TH AND 8TH FLOORS, TOWER B,
WORLD TRADE CENTRE,
NAUROJI NAGAR, NEW DELHI-110029.
6.
ACME SOLAR HOLDINGS LTD.,
NO.152, SECTOR 44, GURGAON,
HARYANA-122002
REP. BY ITS AUTHORISED SIGNATORY.
7.
AMPIN ENERGY UTILITY PRIVATE LTD.,
8.
AMPIN ENERGY C & I FOURTEEN PVT. LTD.,
9.
AMPIN ENERGY C & I TWENTY EIGHT PVT. LTD.,
10.
AMPIN ENERGY C & I TWENTY NINE PVT. LTD.,
ALL HAVING OFFICE AT 'ORBIS',
2ND CROSS RESIDENCY ROAD,
BENGALURU-560025.
REPRESENTED BY ITS
AUTHORISED SIGNATORY.
11.
ESSAR RENEWABLES LIMITED
ESSAR HOUSE, 11 K.K.MARG,
MAHALAKSHMI, HAJI ALI,
MUMBAI-400034.
REPRESENTED BY ITS
AUTHORISED SIGNATORY.
...RESPONDENTS
(BY SRI. RUBEN JACOB, AAG A/W
SRI. K.S. HARISH, GOVERNMENT ADVOCATE FOR R-1;
SRI. RUBEN JACOB, SENIOR COUNSEL A/W
SRI. PIYUSH KUMAR JAIN D., ADVOCATE FOR R-2;
SRI. TUSHAR MEHTA, SENIOR ADVOCATE,
SRI. S.S. NAGANAND, SENIOR ADVOCATE A/W
- 22 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
SMT. SUMANA NAGANAND, ADVOCATE,
MR. SHUBHAM ARYA, ADVOCATE,
MS. PALLAVI, MS. VISMAYA SIMHA, ADVOCATES FOR R-3;
SMT. SADHANA S. DESAI, CGC FOR R-4 & R-5;
SRI. ROHAN SACHDEV, ADVOCATE FOR R-7;
R-6, 8 TO 11 ARE SERVED & UNREPRESENTED)
THIS WRIT APPEAL IS FILED UNDER SECTION 4 OF THE
KARNATAKA HIGH COURT ACT PRAYING TO SET ASIDE THE
IMPUGNED FINAL ORDER/JUDGMENT DATED 09.09.2025 PASSED
BY THE HON'BLE SINGLE JUDGE IN W.P.NO.21533/2024 TO THE
EXTENT IT FAILS TO READ DOWN OR QUASH THE REGULATION
5.8(vii)(a) OF THE GNA REGULATIONS, 2022.
IN W.A. NO.570/2026
BETWEEN:
1.
M/S RAYS POWER INFRA LIMITED
A COMPANY INCORPORATED UNDER THE
PROVISIONS OF THE COMPANIES ACT, 2013
HAVING ITS REGISTERED OFFICE AT
1ST-21 EVERSHINE MALL NORTH METER
CABIN 1, MALAD WEST, MUMBAI-400064
REPRESENTED BY ITS
AUTHORIZED SIGNATORY
MR. SANNA THIPPESWAMY.
2.
RAYSALFA POWER PRIVATE LIMITED
A COMPANY INCORPORATED UNDER THE
PROVISIONS OF THE COMPANIES ACT, 2013
HAVING ITS REGISTERED OFFICE AT
605, SIXTH FLOOR, MANJUSHA BUILDING,
57 NEHRU PLACE DELHI,
SOUTH DELHI-110019
REPRESENTED BY ITS
AUTHORIZED SIGNATORY
MR. SANNA THIPPESWAMY.
3.
DADUR SOLAR POWER PRIVATE LIMITED
A COMPANY INCORPORATED UNDER THE
PROVISIONS OF THE COMPANIES ACT, 2013
HAVING ITS REGISTERED OFFICE AT
D-43, JANPATH, SHYAM NAGAR,
- 23 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
JAIPUR- 302019
REPRESENTED BY ITS
AUTHORIZED SIGNATORY
MR. SANNA THIPPESWAMY.
4.
NILAJ SOLAR POWER PRIVATE LIMITED
A COMPANY INCORPORATED UNDER THE
PROVISIONS OF THE COMPANIES ACT, 2013
HAVING ITS REGISTERED OFFICE AT
P.NO.65, SARDAR PATEL MARG,
C-SCHEME, ASHOK NAGAR,
JAIPUR- 302001
REPRESENTED BY ITS
AUTHORIZED SIGNATORY
MR. SANNA THIPPESWAMY.
5.
ANNIGERI SOLAR POWER PRIVATE LIMITED
A COMPANY INCORPORATED UNDER THE
PROVISIONS OF THE COMPANIES ACT, 2013
HAVING ITS REGISTERED OFFICE AT
65, SARDAR PATEL MARG, C SCHEME,
ASHOK NAGAR, JAIPUR-302001
REPRESENTED BY ITS
AUTHORIZED SIGNATORY
MR. SANNA THIPPESWAMY.
6.
SIRA SOLAR POWER PRIVATE LIMITED
A COMPANY INCORPORATED UNDER THE
PROVISIONS OF THE COMPANIES ACT, 2013
HAVING ITS REGISTERED OFFICE AT
65, SARDAR PATEL MARG, C SCHEME,
ASHOK NAGAR, JAIPUR - 302001
REPRESENTED BY ITS
AUTHORIZED SIGNATORY
MR. SANNA THIPPESWAMY.
...APPELLANTS
(BY SRI. G.S. KANNUR, SENIOR ADVOCATE A/W
SRI. ABHINAY S., ADVOCATE)
AND:
1.
THE STATE OF KARNATAKA,
DEPARTMENT OF ENERGY,
- 24 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
VIKASA SOUDHA, DR. B.R. AMBEDKAR VEEDHI,
BANGALORE-560001
REP. BY THE ADDITIONAL CHIEF SECRETARY
TO THE GOVERNMENT.
2.
KARNATAKA RENEWABLE ENERGY
DEVELOPMENT LTD.,
GOVERNMENT OF KARNATAKA UNDERTAKING
#6/13/1, 10TH BLOCK,
2ND STAGE, NAGARABHAVI,
BANGALORE-560072.
REPRESENTED BY ITS
MANAGING DIRECTOR.
3.
CENTRAL TRANSMISSION UTILITY OF INDIA LIMITED
HAVING ITS REGISTERED OFFICE AT
PLOT NO.2, SECTOR-29
NEAR IFFCO CHOWK METRO STATION
GURAGON-122001
REPRESENTED BY ITS
MANAGING DIRECTOR.
4.
UNION OF INDIA
REPRESENTED BY SECRETARY
MINISTRY OF NEW AND RENEWABLE ENERGY,
BLOCK 14 C.G.O. COMPLEX
LODHI ROAD,
NEW DELHI-110003.
5.
ACME SOLAR HOLDINGS LTD.,
NO.152, SECTOR 44, GURGAON,
HARYANA-122002
REPRESENTED BY ITS
AUTHORISED SIGNATORY.
6.
AMPIN ENERGY UTILITY PRIVATE LTD.,
7.
AMPIN ENERGY C & I FOURTEEN PVT. LTD.,
8.
AMPIN ENERGY C & I TWENTYEIGHT PVT. LTD.,
9.
AMPIN ENERGY C & I TWENTYNINE PVT. LTD.,
- 25 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
ALL HAVING OFFICE AT 'ORBIS',
2ND CROSS, RESIDENCY ROAD,
BENGALURU-560025.
REPRESENTED BY ITS
AUTHORISED SIGNATORY.
10.
ESSAR RENEWABLES LIMITED
ESSAR HOUSE, 11 K.K.MARG,
MAHALAKSHMI, HAJI ALI,
MUMBAI-400034.
REPRESENTED BY ITS
AUTHORISED SIGNATORY.
...RESPONDENTS
(BY SRI. RUBEN JACOB, AAG A/W
SRI. K.S. HARISH, GOVERNMENT ADVOCATE FOR R-1;
SRI. RUBEN JACOB, SENIOR COUNSEL A/W
SRI. PIYUSH KUMAR JAIN D., ADVOCATE FOR R-2;
SRI. TUSHAR MEHTA, SENIOR ADVOCATE,
SRI. S.S. NAGANAND, SENIOR ADVOCATE A/W
SMT. SUMANA NAGANAND, ADVOCATE,
MR. SHUBHAM ARYA, ADVOCATE,
MS. PALLAVI, MS. VISMAYA SIMHA, ADVOCATES FOR R-3;
SMT. SADHANA S. DESAI, CGC FOR R-4;
SRI. ROHAN SACHDEV, ADVOCATE FOR R-6;
R-5, 7 TO 10 ARE SERVED & UNREPRESENTED)
THIS WRIT APPEAL IS FILED UNDER SECTION 4 OF THE
KARNATAKA HIGH COURT ACT PRAYING TO SET ASIDE THE
IMPUGNED FINAL ORDER/JUDGMENT DATED 09.09.2025 PASSED
BY THE HON'BLE SINGLE JUDGE IN W.P.NO.35002/2024 TO THE
EXTENT IT FAILS TO READ DOWN OR QUASH THE REGULATION
5.8(vii)(a) OF THE GNA REGULATIONS, 2022.
THESE WRIT APPEALS HAVING BEEN HEARD AND
RESERVED FOR JUDGMENT, COMING ON FOR PRONOUNCEMENT
THIS DAY, JUDGMENT WAS PRONOUNCED AS UNDER:
CORAM:
HON'BLE MR. VIBHU BAKHRU ,CHIEF JUSTICE
and
HON'BLE MRS. JUSTICE K.S. HEMALEKHA
- 26 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
C.A.V. JUDGMENT
(PER: HON'BLE MRS. JUSTICE K.S. HEMALEKHA)
1.
These appeals arise out of the common order dated
09.09.2025 passed by the learned Single Judge in Writ Petition
No. 35002/2024 c/w Writ Petition No. 21533/2024 (GM-RES). By
the impugned order, the learned Single Judge partly allowed the
writ petitions, set aside the orders dated 30.08.2024, 02.09.2024
and 09.09.2024 issued by the Central Transmission Utility of India
Limited (CTUIL). Since all the appeals arise from the common
order, they have been heard together and disposed of by this
common judgment.
2.
The Central Electricity Regulatory Commission (CERC) in
exercise of its powers under Sections 79 and 178 of the Electricity
Act, 2003 [Electricity Act], notified the Central Electricity
Regulatory Commission (Grant of Connectivity, Long-term Access
and Medium-term Open Access in inter-State Transmission and
related matters) Regulations, 2009 [Connectivity Regulations,
2009]
governing
grant
of
connectivity
to
the
Inter-State
Transmission System (ISTS). The concept of a power park
developer was introduced for the first time by the Fifth Amendment
- 27 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
to the Connectivity Regulations, 2009, notified on 15.05.2015,
pursuant to the policy initiatives of the Ministry of New and
Renewable Energy (MNRE), where under a company authorised
by the Central Government as a Solar Power Park Developer was
recognised as an eligible applicant for connectivity, and its
application could be considered by the Central Transmission Utility
only if it was so authorized. By the Seventh Amendment, notified
on 09.01.2019, the expression was widened to 'Renewable Power
Park Developer' (RPPD) and the power to authorize such a
developer was extended to the State Governments as well.
3.
The regulatory framework was thereafter replaced by the
Central Electricity Regulatory Commission (Connectivity and
General Network Access to the Inter-State Transmission System)
Regulations, 2022 [GNA Regulations] which came into force on
07.06.2022 and repealed the Connectivity Regulations, 2009 while
retaining the requirement of governmental authorisation for an
RPPD. Regulation 5.8(vii) of the GNA Regulations, as originally
framed, required an RPPD to furnish, with its application for
connectivity, an authorisation issued by the Central Government or
the State Government, as applicable, to undertake infrastructural
activities including arrangement for connectivity on behalf of solar
- 28 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
or wind power generators. By the First Amendment Regulations
notified on 01.04.2023 and again by Second Amendment notified
on 19.06.2024, Clause (vii) of Regulation 5.8 was substituted in its
present form, where under the authorisation [sub-clause (a)] is
required to be furnished in combination with the prescribed land
documents [sub-clause (b)] or a bank guarantee [sub-clause (c)].
By the Second Amendment Regulations notified on 19.06.2024,
which came into effect from 15.07.2024, sub-clauses (b) and (c)
were substituted and, significantly, Regulation 3.5 was substituted
to provide that an application containing deficiencies other than the
notified minor deficiencies shall be treated as incomplete and
rejected.
4.
The brief facts relating to the Writ Petitions are :
W.P. No. 21533/2024
M/s Rays Power Infra Limited [the writ petitioner], claiming
to be an RPPD, proposed to establish renewable energy parks in
the State of Karnataka with connectivity to ISTS at the Tumkur II
and Bellary pooling sub-stations. By e-mail dated 13.06.2024
(supplemented on 13.09.2024), it requested the State Government
and the Karnataka Renewable Energy Development Limited
[KREDL] to issue the authorisation contemplated under Regulation
- 29 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
5.8(vii)(a) without insisting upon a Government Order. As no
decision was forthcoming, it instituted W.P No. 21533/2024 (GMRES) on 07.08.2024 seeking, inter alia, a declaration that the State
Government and/or KREDL have the power to issue such
authorisation and a direction to consider its application. By an
interim order dated 08.08.2024, CTUIL was directed to consider the
petitioner's application for grant of connectivity on the basis of
seniority,
without
insisting
on
the
authorisation.
Between
13.08.2024 and 29.08.2024, the petitioner, through its special
purpose vehicles [SPVs], submitted applications before CTUIL
seeking connectivity at the Tumkur-II and Bellary sub-stations
(aggregating 890 MW and 600 MW respectively). In terms of the
amended Regulation 3.5, CTUIL had, on 15.07.2024, published a
list of deficiencies categorising the absence of the authorisation
under Regulation 5.8 (vii)(a) as a major deficiency; accordingly, by
orders dated 30.08.2024, 02.09.2024 and 09.09.2024, CTUIL
closed the applications on the ground that the mandatory
authorisation had not been furnished.
5.
The petitioner thereafter amended the writ petition and
specifically challenged the constitutional validity of Regulation
5.8(vii)(a) on the ground that it violates Articles 14 and 19(1)(g) of
- 30 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
the Constitution of India by imposing an additional requirement only
upon RPPDs, while similarly situated renewable energy developers
are not subjected to such a condition. It was further contended that
neither the GNA Regulations nor the Karnataka Renewable Energy
Policy 2022-2027 [the RE Policy] prescribes any procedure,
competent authority or timeline for grant of such authorisation,
rendering the requirement arbitrary and impossible to comply with.
W.P. No. 35002/2024.
6.
During the pendency of the aforesaid writ petition, the writ
petitioners and its five SPVs [hereafter collectively referred to as
‘the
writ
petitioners’]
instituted
W.P.
No.35002/2024
on
19.12.2024 seeking a direction to the State Government to grant
the authorisation contemplated under Regulation 5.8(vii)(a), without
insisting upon issuance of a separate Government Order, within a
fixed time. By an interim order dated 19.12.2024, the State
Government was directed to consider the petitioners' application for
grant of authorisation without insisting on the submission of a
Government Order specifically approving the petitioners' projects at
- 31 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
Tumkur and Bellary.1 By further interim order dated 16.01.2025,
CTUIL was directed to reserve 890 MW at the Tumkur-II substation and 600 MW at Bellary
sub-station for allotment to the
petitioners, while remaining free to grant connectivity to other
applicants beyond the reserved portion, until further orders.
7.
During the pendency of the writ petitions, the petitioners
sought leave to approach CERC for relaxation of the requirement
of authorisation in exercise of its power under Regulation 41 of the
GNA Regulations. By order dated 17.03.2025, the learned Single
Judge permitted the petitioners to make a representation and
directed
CERC
to
consider
the
same.
The
petitioners'
representation dated 10.03.2025 was, however, rejected by CERC
by its order dated 11.04.2025, holding, inter alia, that the
requirement
of
authorisation
is
neither
prohibitive
nor
discriminatory, and that it was open to the petitioners to seek the
authorisation of the Central Government (MNRE) under Mode-6 of
the Solar Park Scheme.
8.
By the common order under appeal, the learned Single
Judge partly allowed the writ petitions. Relying upon the decision of
The State's appeal against the said order, being W.A. No.1938/2024, was
subsequently closed as infructuous on 08.10.2025 upon disposal of the writ
petitions.
- 32 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
the Supreme Court in Reliance Energy Limited v. Maharashtra
State Road Development Corporation Ltd.,2 the learned Single
Judge held that the petitioners had been denied a level playing
field, inasmuch as the GNA Regulations prescribe no guidelines or
timeframe
for
the
competent
Government
to
grant
the
authorisation; that the State Government had compounded the
difficulty by insisting upon a Government Order, although no such
requirement is found in the GNA Regulations; that CERC, though
empowered to remove difficulties, had failed in its duty to do so;
and that in a single queue operated on a first-come-first-served
basis, the connectivity would stand exhausted by the time an
RPPD secured the authorisation. Accordingly, the learned Single
Judge;
(i) extended the interim reservation of 890 MW at the
Tumkur-II sub-station and 600 MW at the Bellary sub-station
until the authorisation is granted by the State Government;
(ii) reserved liberty to CERC and CTUIL to reconsider the
petitioners'
applications
and
grant
in-principle
approval/connectivity, subject to the petitioners obtaining the
authorisation;
(2007) 8 SCC 1
- 33 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
(iii) rejected I.A. No.1/2024 filed by CTUIL and consequently
set aside the orders dated 30.08.2024 and 02.09.2024,
restoring the applications for reconsideration; and
(iv) formally allowed the impleading applications.
The learned Single Judge, however, consciously did not strike
down or read down Regulation 5.8(vii)(a). Subsequently, by order
dated 24.10.2025 passed on I.A. No.6/2025 filed by the writ
petitioners, the learned Single Judge modified the order dated
09.09.2025 by;
(i)
correcting the reference to 'August 2024' in paragraph
2 to 'June–July 2024';
(ii)
including CTUIL's order dated 09.09.2024 within
direction (iv), so that the orders set aside read as those
dated 30.08.2024, 02.09.2024 and 09.09.2024; and
(iii)
recasting direction (iii) to provide that CERC and
CTUIL shall reconsider the petitioners' applications and grant
in-principle approval/connectivity within a period of four
weeks, such approval remaining subject to the petitioners
obtaining the authorisation from the State Government.
- 34 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
9.
Aggrieved by the common order,
(i) M/s Rays Power Infra Limited has preferred W.A. No.
569/2026, and along with its five SPVs, W.A. No. 570/2026,
contending that the learned Single Judge failed to adjudicate
the constitutional challenge to Regulation 5.8(vii)(a) and
granted only conditional relief.
(ii) CTUIL has preferred W.A. Nos.1961/2025 and 1992/2025
contending that the learned Single Judge could not have
directed CTUIL contrary to the mandatory provisions of the
GNA Regulations without declaring Regulation 5.8 (vii)(a)
invalid.
(iii)
Essar Renewables Limited has preferred W.A. Nos.
1703/2025 and 1708/2025, contending that the reservation of
transmission capacity in favour of the petitioner disturbed
the statutory queue-based mechanism
and adversely
affected the rights of the other eligible applicants.
(iv)
AMPIN Energy Utility Private Limited and its group
entities, who were impleaded as respondents in the writ
proceedings, preferred W.A. Nos. 1963/2025 and 1965/2025,
contending that the relief granted to the petitioner confers an
- 35 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
undue advantage contrary to the statutory framework and
prejudices the rights of the competing applicants.
10.
During the pendency of these appeals, the Government of
Karnataka issued the requisite authorisation in favour of M/s Rays
Power Infra Limited on 31.01.2026. By an interim order dated
10.02.2026 in W.A. Nos.1961/2025 and 1992/2025, this Court
stayed the operation of the impugned order, observing, prima facie,
that although the constitutional validity of Regulation 5.8(vii)(a) has
been questioned, the Regulations had neither been struck down
nor read down, and the directions issued by the learned Single
Judge therefore appeared to be contrary to the GNA Regulations.
Subsequently, by order dated 18.03.2026, this Court clarified that
the interim order would not prevent CTUIL from processing the
applications of M/s Rays Power Infra Limited from the date of grant
of the government authorisation, namely 31.01.2026.
Rival contentions of the parties.
Submissions on behalf of M/s Rays Power Infra Limited and its
SPVs (appellants in W.A. Nos. 569/2026 and 570/2026 and the
writ petitioners)
11.
Sri K. G. Raghavan and Sri G. S. Kannur,- learned Senior
Counsel appearing for the appellants submit that the appellant is
- 36 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
an established RPPD proposing to establish renewable energy
parks in the State of Karnataka. It is submitted that Regulation 4.1
(d) of the GNA Regulations specifically recognizes an RPPD as an
eligible entity entitled to seek connectivity to the ISTS.
12.
It is contended that Regulation 5.8(vii)(a) however, imposes
an additional condition requiring RPPD alone to obtain prior
authorisation
from
the
Central
Government
or
the
State
Government before applying for connectivity, whereas no such
requirement is imposed upon any other renewable energy
generator or generating company seeking the very same
connectivity. The learned Senior Counsel submits that the
classification is arbitrary, discriminatory and violative of Article 14 of
the Constitution of India, since there exists no intelligible differentia,
having any rational nexus with the object sought to be achieved. It
is further submitted that the GNA Regulations themselves do not
prescribe the competent authority,
procedure or timeline for
issuance of such authorisation. Likewise, the RE Policy
is
completely silent. It is argued that the writ petitioner approached
the Government of Karnataka as early as June 2024, but no
decision was taken for several months. Consequently, by the time
authorisation is issued, the available transmission margins at
- 37 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
important sub-stations, such as Tumkur II and Bellary, stand
exhausted because connectivity is processed on a first-come-firstserved basis.
13.
Learned Senior Counsel submits that the result is that
although Regulation 4 recognizes an RPPD as an eligible
applicant, Regulation 5.8(vii)(a) renders such right wholly illusory. It
is submitted that the learned Single Judge failed to grant complete
relief by declining to decide the constitutional validity of Regulation
5.8(vii)(a). According to the learned Senior Counsel, the relief
granted by the learned Single Judge is illusory since it continues to
make restoration of connectivity subject to obtaining the very
authorisation which constitutes the source of the grievance. On
these
grounds,
they
seek
that
Regulation
5.8(vii)(a)
is
unconstitutional or, in the alternative, that it be read down.
Submissions on behalf of CTUIL-appellants in Writ Appeal
Nos. 1961/2025 and 1992/2025
14.
Sri Tushar Mehta, the learned Solicitor General of India and
Sri S.S. Naganand, the learned Senior Counsel submit that the
CTUIL is the entity notified by the Central Government as the
Central Transmission Utility under Section 38 of the Electricity Act,
and is bound to discharge its functions strictly in accordance with
- 38 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
the GNA Regulations. It is submitted that CTUIL is merely the
statutory implementing authority under the Electricity Act. It is
submitted that the GNA Regulations constitute subordinate
legislation framed by the CERC under Sections 79 and 178 of the
Electricity Act and have statutory force. It is submitted that
Regulation
5.8(vii)(a)
expressly
mandates
government
authorisation before an RPPD can seek connectivity to ISTS. It is
submitted that CTUIL has no jurisdiction to waive, relax or ignore
the statutory requirement. It is submitted that the learned Single
Judge, while consciously declining to strike down Regulation
5.8(vii)(a), nevertheless issued directions compelling CTUIL to act
contrary to the Regulations. Such directions virtually rewrite the
statutory Regulations. It is argued that what cannot be done directly
cannot be permitted to be done indirectly. They further submit that
if the petitioner was genuinely aggrieved by the implementation
difficulties, the appropriate remedy was to invoke the powers of
CERC under the GNA Regulations – the power of relaxation under
Regulation 41 and the power to remove difficulties under
Regulation 42. It is contended that the distinction between RPPD
and an ordinary generating company is a reasonable classification
that is founded on the principle of intelligible differentia. Further that
- 39 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
the Regulations serves a legitimate regulatory purpose of ensuring
that only government recognized RPPD can seek connectivity to
the ISTS on behalf of multiple generating stations. It is therefore,
submitted that there is no violation of Article 14 of the Constitution
of India.
Submission on behalf of Essar Renewables Limited
15.
The learned counsel appearing for Essar Renewables
Limited submits that the appellant is a competing renewable energy
developer. The reservation of 890 MW at Tumkur II and 600 MW at
Bellary in favour of the writ petitioner, directly prejudices other
eligible applicants. The statutory queue mechanism under GNA
Regulations is disturbed by judicial orders. It is submitted that the
impugned directions confer an undue preference upon an applicant
who admittedly did not satisfy the mandatory requirement.
Submission on behalf of AMPIN Energy Utility Private Limited.
16.
The learned counsel appearing for AMPIN Energy Utility
submits that the appellants were impleaded before the learned
Single Judge as affected parties. The reservation of transmission
capacity in favour of the petitioners have adversely affected the
rights of all competing applicants and that the learned Single Judge
- 40 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
could not have granted equitable relief to the petitioner, contrary to
the statutory Regulations.
Submission on behalf of the State
17.
Sri Ruben Jacob, the learned Additional Advocate General,
submits that the State Government has no dispute regarding
issuance of authorisation. However, the State is required to satisfy
itself regarding eligibility before issuing authorisation. He submits
that
subsequent
authorisation has
to
the
institution
of
these
appeals,
the
been granted to the writ petitioner
on
31.01.2026.
Points for consideration:
18.
In light of the rival submissions, the following points arise for
consideration:
(i) Whether Regulation 5.8(vii)(a) is liable to be declared
unconstitutional on the ground that it is manifestly arbitrary
and violative of Article 14 of the Constitution of India?
(ii) Whether the learned Single Judge was justified in issuing
directions which virtually dispense with the mandatory
requirement contained in Regulation 5.8(vii)(a) without
striking down or reading down the Regulation?
- 41 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
19.
The controversy essentially centres on the validity and
implementation of Regulation 5.8(vii)(a) of the GNA Regulations.
The Regulation 5.8(vii)(a) is set out below :
"5. Application for Grant of Connectivity
5.8 The application for grant of Connectivity
shall contain, inter alia, the following details, as
applicable, duly supported with relevant affidavit, as
stipulated in the Detailed Procedure for Connectivity
and GNA issued in accordance with Regulation 39.1 :
(vii) In case of Renewable Power Park
Developer, the documents shall be submitted in
combination of clauses (a) and (b) or combination of
clauses (a) and (c) as specified hereunder:
(a) Authorisation by the Central Government or
the State Government, as applicable, to undertake
infrastructural activities including arrangement for
Connectivity on behalf of solar power generators or
wind power generators;"
20.
The challenge is mounted on the ground that the Regulation
requires an RPPD alone to obtain a prior authorisation from the
Central Government or the State Government before seeking
connectivity to the ISTS, whereas no such requirement is imposed
upon other
renewable energy developers. The expression
‘Renewable Power Park Developer’ is defined in Regulations 2.1
(ai) of the GNA Regulations, which reads thus :
"(ai) "Renewable Power Park Developer" means an
entity authorised by the Central Government or a State
- 42 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
Government as Power Park developer for Renewable
Energy Generating Station(s).”
21.
To examine the validity of the constitutional challenge to the
Regulation 5.8(vii)(a), it is necessary to refer to the statutory and
regulatory framework under which the impugned Regulation has
been framed.
22.
The Electricity Act was enacted with the object of
consolidating the laws relating to generation, transmission,
distribution, trading and use of electricity and to promote
competition, efficiency and development of electricity industry.
Under Sections 79 and 178 of the Electricity Act, CERC has been
vested with the power to regulate ISTS of electricity and to frame
regulations having statutory force for carrying out the provisions of
the Act. Sections 79 and 178 of the Electricity Act reads as under :
"79. Functions of Central Commission.–(1)The
Central Commission shall discharge the following functions,
namely:–
(a)
to regulate the tariff of generating companies owned
or controlled by the Central Government;
(b)
to regulate the tariff of generating companies other
than those owned or controlled by the Central Government
specified in clause (a), if such generating companies enter
into or otherwise have a composite scheme for generation
and sale of electricity in more than one State;
(c)
to regulate the inter-State transmission of electricity;
- 43 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
(d)
to determine tariff for inter-State transmission of
electricity;
(e)
to issue licences to persons to function as
transmission licensee and electricity trader with respect to
their inter-State operations;
(f)
to adjudicate upon disputes involving generating
companies or transmission licensee in regard to matters
connected with clauses (a) to (d) above and to refer any
dispute for arbitration;
(g)
to levy fees for the purposes of this Act;
(h)
to specify Grid Code having regard to Grid
Standards;
(i)
to specify and enforce the standards with respect to
quality, continuity and reliability of service by licensees;
(j)
to fix the trading margin in the inter-State trading of
electricity, if considered, necessary;
(k)
to discharge such other functions as may be
assigned under this Act.
(2)
The Central Commission shall advise the
Central Government on all or any of the following matters,
namely:–
(i)
formulation of National Electricity Policy and
tariff policy;
(ii)
promotion of competition, efficiency and
economy in activities of the electricity industry;
(iii)
promotion of investment in electricity industry;
(iv)
any other matter referred to the Central
Commission by that Government.
- 44 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
(3)
The Central Commission shall ensure
transparency while exercising its powers and discharging its
functions.
(4)
In discharge of its functions, the Central
Commission shall be guided by the National Electricity
Policy, National Electricity Plan and tariff policy published
under section 3.
x
x
x
"178. Powers of Central Commission to make
regulations.— (1) The Central Commission may, by
notification make regulations consistent with this Act and
the rules generally to carry out the provisions of this Act.
(2) In particular and without prejudice to the generality of the
power contained in sub-section (1), such regulations may
provide for all or any of following matters, namely:—
(a)
period to be specified under the first proviso to
section 14;
(b)
the form and the manner of the application under
sub-section (1) of section 15;
(c)
the manner and particulars of notice under subsection (2) of section 15;
(d)
the conditions of licence under section 16;
(e)
the manner and particulars of notice under clause (a)
of sub-section (2) of section 18;
(f)
publication of alterations or amendments to be made
in the licence under clause (c) of sub-section (2) of section
18;
(g)
Grid Code under sub-section (2) of section 28;
(h)
levy and collection of fees and charge from
generating companies or transmission utilities or licensees
under sub-section (4) of section 28;
- 45 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
(i)
rates, charges and terms and conditions in respect of
intervening transmission facilities under proviso to section
36;
(j)
payment of the transmission charges and a
surcharge under sub-clause (ii) of clause (d) of sub-section
(2) of section 38;
(k)
reduction of surcharge and cross subsidies under
second proviso to sub-clause (ii) of clause (d) of sub-section
(2) of section 38;
(l)
payment of transmission charges and a surcharge
under sub-clause (ii) of clause (c) of section 40;
(m) reduction of surcharge and cross-subsidies under the
second proviso to sub-clause (ii) of clause (c) of section 40;
(n)
proportion of revenues from other business to be
utilised for reducing the transmission and wheeling charges
under proviso to section 41;
(o)
duties of electricity trader under sub-section (2) of
section 52;
(p)
standards of performance of a licensee or class of
licensees under sub-section (1) of section 57;
(q)
the period within which information to be furnished by
the licensee under sub-section (1) of section 59;
(r)
the manner of reduction of cross-subsidies under
clause (g) of section 61;
(s)
the terms and conditions for the determination of tariff
under section 61;
(t)
details to be furnished by licensee or generating
company under sub-section (2) of section 62;
(u)
the procedures for calculating the expected revenue
from tariff and charges under sub-section (5) of section 62;
- 46 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
(v)
the manner of making an application before the
Central Commission and the fee payable therefor under
sub-section (1) of section 64;
(w)
the manner of publication of application under subsection (2) of section 64;
(x)
issue of tariff order with modifications or conditions
under sub-section (3) of section 64;
(y)
the manner by which development of market in
power including trading specified under section 66;
(z)
the powers and duties of the Secretary of the Central
Commission under sub-section (1) of section 91;
(za) the terms and conditions of service of the Secretary,
officers and other employees of Central Commission under
sub-section (3) of section 91;
(zb) the rules of procedure for transaction of business
under sub-section (1) of section 92;
(zc) minimum information to be maintained by a licensee
or the generating company and the manner of such
information to be maintained under sub-section (8) of
section 128;
(zd) the manner of service and publication of notice under
section 130;
(ze) any other matter which is to be, or may be, specified
by regulations.
(3)
All regulations made by the Central Commission
under this Act shall be subject to the conditions of previous
publication.."
23.
The CTUIL is the implementing agency responsible for
processing applications for connectivity and general network
access strictly in accordance with the Regulations framed by
- 47 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
CERC. It exercises no independent legislative or policy making
power and is bound to implement the Regulations as they stand.
24.
The regulatory framework relating to connectivity has
undergone gradual evolution. As noticed above, the Connectivity
Regulations, 2009 initially governed grant of connectivity to the
ISTS; the Fifth Amendment, notified on 15.05.2015 introduced the
Solar
Power
Park
Developer,
authorized
by
the
Central
Government, as an eligible applicant; The Seventh Amendment
notified
on
09.01.2019,
substituted
the
wider
expression
'Renewable Power Park Developer' and extended the authorising
power to the State Governments. The GNA Regulations which
replaced
the
earlier
Connectivity
Regulations,
2009,
have
substantially retained the same requirement vis-a-vis Regulation
5.8(vii)(a).
25.
The
above
legislative
history
assumes
considerable
significance. The requirement of government authorisation is not a
condition introduced for the first time under the GNA Regulations,
2022. It has existed in one form or another since 2015 and has
consciously been retained through successive regulations by and
amendments framed by the expert regulatory body. Such continuity
demonstrates that the requirement forms a part of the legislative
- 48 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
policy governing RPPD and that it cannot be viewed as accidental
or arbitrary stipulation.
26.
The principal submission of the petitioners is that Regulation
5.8 (vii)(a) violates Article 14 of the Constitution as it discriminates
between RPPD and other renewable energy developers. The
further grievance is that while the Regulation insist upon
government authorisation, neither the GNA Regulations nor the RE
Policy prescribes any procedure or timeline for grant of such
authorisation, resulting in practical impossibility. Consequently, by
the time the authorisation is obtained, the available connectivity
margin in the relevant sub-stations stands exhausted.
27.
The learned Single Judge accepted this submission to the
extent of holding that the absence of any mechanism for grant of
authorisation, created hardship for RPPD. Nevertheless, the
learned Single Judge consciously refrained from declaring
Regulation 5.8(vii)(a) as unconstitutional or reading down the
provision. Despite upholding the continued existence of the
Regulation, the learned Single Judge directed CTUIL to restore and
process writ petitioners’ applications and reserved transmission
capacity in their favour, subject to eventual production of the
government authorisation. We note that the correctness of the
- 49 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
order has to be examined in the light of the settled principles
governing judicial review of subordinate legislation.
28.
The law relating to judicial review of subordinate legislation is
well settled, the constitutional validity of a legislative enactment
can be challenged only on limited grounds, when it is ultra vires
the parent statute, violates any constitutional provision, exceeds
the limits of the delegated power or is manifestly arbitrary. The
legislation cannot be struck down merely because the Court does
not concur with the wisdom of enacting it or doubts its efficacy. It is
wholly impermissible for the Court to test the validity of the
legislation on the ground that there may be some other measures
which could perceivably better serve the object of the legislation.
29.
In Indian Express Newspapers (Bombay) Private Limited
and Others vs Union of India and Others3, the Supreme Court
held that a piece of subordinate legislation does not enjoy the same
degree of immunity which is enjoyed by a statute passed by a
competent legislature. Subordinate legislation may be questioned
on any of the grounds on which the plenary legislation may be
questioned; in addition, on the ground that it does not conform to
the statute under which it is made; that it is contrary to some other
(1985) 1 SCC 641
- 50 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
statute; or that it is manifestly arbitrary and therefore offends Article
14 of the Constitution. The Court further observed that subordinate
legislation cannot be questioned on the ground of the violation of
the principles of natural justice, which is a ground available against
administrative action. The relevant paragraphs, at para Nos. 75, 77
and 78, read as under :
"75. A piece of subordinate legislation does not
carry the same degree of immunity which is enjoyed by a
statute passed by a competent Legislature. Subordinate
legislation may be questioned on any of the grounds on
which plenary legislation is questioned. In addition it may
also be questioned on the ground that it does not conform
to the statute under which it is made. It may further be
questioned on the ground that it is contrary to some other
statute. That is because subordinate legislation must yield
to plenary legislation. It may also be questioned on the
ground that it is unreasonable, unreasonable not in the
sense of not being reasonable, but in the sense that it is
manifestly arbitrary. In England, the Judges would say
“Parliament never intended authority to make such rules.
They are unreasonable and ultra vires”. The present
position of law bearing on the above point is stated by
Diplock, L.J. in Mixnam's Properties Ltd. v. Chertsey Urban
District Council [(1964) 1 QB 214] thus:
"The various special grounds on which
subordinate legislation has sometimes been said to
be void … can, I think, today be properly regarded
as being particular applications of the general rule
that subordinate legislation, to be valid, must be
shown to be within the powers conferred by the
statute. Thus, the kind of unreasonableness which
invalidates a bye-law is not the antonym of
"reasonableness" in the sense in which that
expression is used in the common law, but such
manifest arbitrariness, injustice or partiality that a
court would say: "Parliament never intended to give
- 51 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
authority to make such rules; they are unreasonable
and ultra vires"...if the courts can declare
subordinate legislation to be invalid for "uncertainty"
as distinct from unenforceable...this must be
because Parliament is to be presumed not to have
intended to authorise the subordinate legislative
authority to make changes in the existing law which
are uncertain."
x
x
x
77. In India arbitrariness is not a separate ground
since it will come within the embargo of Article 14 of the
Constitution. In India any enquiry into the vires of delegated
legislation must be confined to the grounds on which
plenary legislation may be questioned, to the ground that it
is contrary to the statute under which it is made, to the
ground that it is contrary to other statutory provisions or
that it is so arbitrary that it could not be said to be in
conformity with the statute or that it offends Article 14 of the
Constitution.
78. That subordinate legislation cannot be
questioned on the ground of violation of principles of
natural justice on which administrative action may be
questioned has been held by this Court in The Tulsipur
Sugar Co. Ltd. v. Notified Area Committee, Tulsipur [(1980)
2 SCC 295], Rameshchandra Kachardas Porwal v. State of
Maharashtra [(1981) 2 SCC 722] and in Bates v. Lord
Hailsham of St. Marylebone [(1972) 1 WLR 1373]. A
distinction must be made between delegation of a
legislative function in the case of which the question of
reasonableness cannot be enquired into and the
investment by statute to exercise particular discretionary
powers. In the latter case the question may be considered
on all grounds on which administrative action may be
questioned, such as, non-application of mind, taking
irrelevant matters into consideration, failure to take relevant
matters into consideration, etc, etc. On the facts and
circumstances of a case, a subordinate legislation may be
struck down as arbitrary or contrary to statute if it fails to
take into account very vital facts which either expressly or
by necessary implication are required to be taken into
consideration by the statute or, say, the Constitution. This
can only be done on the ground that it does not conform to
- 52 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
the statutory or constitutional requirements or that it offends
Article 14 or Article 19(1)(a) of the Constitution. It cannot,
no doubt, be done merely on the ground that it is not
reasonable or that it has not taken into account relevant
circumstances which the Court considers relevant."
30.
In State of A.P. and Others vs McDowell and Company
and Others4, the Supreme Court held that no enactment can be
struck down by just saying that it is arbitrary as under :
"43. ………… No enactment can be struck down by
just saying that it is arbitrary or unreasonable. Some or
other constitutional infirmity has to be found before
invalidating an Act. An enactment cannot be struck down
on the ground that court thinks it unjustified. Parliament and
the legislatures, composed as they are of the
representatives of the people, are supposed to know and
be aware of the needs of the people and what is good and
bad for them. The court cannot sit in judgment over their
wisdom. In this connection, it should be remembered that
even in the case of administrative action, the scope of
judicial review is limited to three grounds, viz., (i)
unreasonableness, which can more appropriately be called
irrationality, (ii) illegality and (iii) procedural impropriety (see
Council of Civil Service Unions v. Minister for Civil Service
[1985 AC 374] which decision has been accepted by this
Court as well). .............................. It is one thing to say that
a restriction imposed upon a fundamental right can be
struck down if it is disproportionate, excessive or
unreasonable and quite another thing to say that the court
can strike down enactment if it thinks it unreasonable,
unnecessary or unwarranted."
31.
The Supreme Court considered the Indian Express
judgment in Shayara Bano and Others vs Union of India and
(1996) 3 SCC 709
- 53 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
Others5 and held at para Nos. 260, 279 and 283, which are set
out below :
"260. Article 14 of the Constitution of India is a facet
of equality of status and opportunity spoken of in the
Preamble to the Constitution. The Article naturally divides
itself into two parts—(1) equality before the law, and (2) the
equal protection of the law. Judgments of this Court have
referred to the fact that the equality before law concept has
been derived from the law in the U.K., and the equal
protection of the laws has been borrowed from the 14th
Amendment to the Constitution of the United States of
America. In a revealing judgment, Subba Rao, J.,
dissenting, in State of U.P. v. Deoman Upadhyaya (1961) 1
SCR 14 at 34 : (AIR 1960 SC 1125 at p. 1134) further went
on to state that whereas equality before law is a negative
concept, the equal protection of the law has positive
content. The early judgments of this Court referred to the
“discrimination” aspect of Article 14, and evolved a rule by
which subjects could be classified. If the classification was
“intelligible” having regard to the object sought to be
achieved, it would pass muster under Article 14's antidiscrimination aspect. Again, Subba Rao, J., dissenting, in
Lachhman Das v. State of Punjab (1963) 2 SCR 353 at 395
: (AIR 1963 SC 222 at p. 240), warned that overemphasis
on the doctrine of classification or an anxious and
sustained attempt to discover some basis for classification
may gradually and imperceptibly deprive the Article of its
glorious content. He referred to the doctrine of
classification as a “subsidiary rule” evolved by courts to
give practical content to the said Article.
x
x
x
279. In a recent Constitution Bench decision in
Natural Resources Allocation, In re, Special Reference
No.1 of 2012, (2012) 10 SCC 1 : (2012 AIR SCW 6194),
this Court went into the arbitrariness doctrine in some
detail. It referred to Royappa [AIR 1974 SC 555) (supra),
Maneka Gandhi [AIR 1978 SC 597) (supra) and Ajay Hasia
(AIR 1981 SC 487) (supra) (and quoted from paragraph 16
AIR 2017 SC 4609
- 54 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
which says that "… the impugned legislative or executive
action would plainly be arbitrary and the guarantee of
equality under Article 14 would be breached...”). It then
went
on
to
state
that
“arbitrariness”
and
“unreasonableness” have been used interchangeably as
follows:
“103. As is evident from the above, the expressions
“arbitrariness” and “unreasonableness” have been used
interchangeably and in fact, one has been defined in terms
of the other. More recently, in Sharma Transport v. Govt. of
A.P. [(2002) 2 SCC 188], this Court has observed thus:
(SCC pp. 203-04, para 25) : (AIR 2002 SC 322 at pp. 330331, para 23)
‘25. … In order to be described as arbitrary, it must
be shown that it was not reasonable and manifestly
arbitrary. The expression 'arbitrarily' means: in an
unreasonable manner, as fixed or done capriciously or at
pleasure, without adequate determining principle, not
founded in the nature of things, non-rational, not done or
acting according to reason or judgment, depending on the
will alone.”
(at page 81) : (at p.6235 of AIR SCW)
After stating all this, it then went on to comment,
referring to McDowell [AIR 1996 SC 1627) (supra) that no
arbitrary use should be made of the arbitrariness doctrine.
It then concluded (at page 83) (at p.6237, para 105 of
SCW):
“107. From a scrutiny of the trend of decisions it is
clearly perceivable that the action of the State, whether it
relates to distribution of largesse, grant of contracts or
allotment of land, is to be tested on the touchstone of
Article 14 of the Constitution. A law may not be struck down
for being arbitrary without the pointing out of a
constitutional infirmity as McDowell case [(1996) 3 SCC
709] : (AIR 1996 SC 1627)] has said. Therefore, a State
action has to be tested for constitutional infirmities qua
Article 14 of the Constitution. The action has to be fair,
reasonable,
non-discriminatory,
transparent,
noncapricious, unbiased, without favouritism or nepotism, in
pursuit of promotion of healthy competition and equitable
- 55 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
treatment. It should conform to the norms which are
rational, informed with reasons and guided by public
interest, etc. All these principles are inherent in the
fundamental conception of Article 14. This is the mandate
of Article 14 of the Constitution of India.”
(Emphasis Supplied)
On a reading of this judgment, it is clear that this
Court did not read McDowell (supra) as being an authority
for the proposition that legislation can never be struck down
as being arbitrary. Indeed the Court, after referring to all the
earlier judgments, and Ajay Hasia [AIR 1981 SC 487)
(supra) in particular, which stated that legislation can be
struck down on the ground that it is “arbitrary” under Article
14, went on to conclude that “arbitrariness” when applied to
legislation cannot be used loosely. Instead, it broad based
the test, stating that if a constitutional infirmity is found,
Article 14 will interdict such infirmity. And a constitutional
infirmity is found in Article 14 itself whenever legislation is
“manifestly arbitrary” i.e. when it is not fair, not reasonable,
discriminatory, not transparent, capricious, biased, with
favouritism or nepotism and not in pursuit of promotion of
healthy competition and equitable treatment. Positively
speaking, it should conform to norms which are rational,
informed with reason and guided by public interest, etc.
x
x
x
283. It will be noticed that a Constitution Bench of
this Court in Indian Express Newspapers v. Union of India
(1985) 1 SCC 641 : (AIR 1986 SC 515), stated that it was
settled law that subordinate legislation can be challenged
on any of the grounds available for challenge against
plenary legislation. This being the case, there is no rational
distinction between the two types of legislation when it
comes to this ground of challenge under Article 14. The
test of manifest arbitrariness, therefore, as laid down in the
aforesaid judgments would apply to invalidate legislation as
well as subordinate legislation under Article 14. Manifest
arbitrariness, therefore, must be something done by the
legislature capriciously, irrationally and/or without adequate
determining principle. Also, when something is done which
is excessive and disproportionate, such legislation would
- 56 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
be manifestly arbitrary. We are, therefore, of the view that
arbitrariness in the sense of manifest arbitrariness as
pointed out by us above would apply to negate legislation
as well under Article 14.
32.
The Supreme Court in Shayara Bano (supra) explained that
legislation may be invalidated when it is capricious, irrational,
without any adequate determining principle or where it is excessive
and disproportionate.
33.
It is not the case of the petitioners that the impugned
Regulation was introduced mala fide or by any ulterior motive.
Bearing the principle in mind, we are unable to accept that the
impugned Regulation is to be set aside on the ground that it is
manifestly arbitrary or falls foul of Article 14 of the Constitution of
India. The distinction between RPPD and an ordinary renewable
power developer is neither artificial nor illusory. An RPPD develops
common
infrastructure,
acquires
land,
provides
pooling
arrangement and facilitates establishment of several generating
stations within an integrated renewable energy park. Such
developers occupy a distinct position in the regulatory framework.
34.
The requirement of government authorisation ensures that
only projects recognized by the appropriate government are treated
as renewable power parks for the purpose of seeking connectivity
- 57 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
to the ISTS on behalf of the generating stations to be established
within such parks. The object sought to be achieved is orderly
development of the national transmission network, proper planning
of transmission infrastructure, and avoidance of speculative
blocking of valuable transmission capacity.
35.
The classification therefore rests upon an intelligible
differentia. The differentia has a direct and rational nexus with the
object sought to be achieved under the Electricity Act and the GNA
Regulations.
36.
It is therefore not possible to accept the contention that
Regulation 5.8(vii)(a) creates hostile discrimination or violates
Article 14 of the Constitution of India. We are unable to hold that
the Regulation is manifestly arbitrary merely because the State
Government has not evolved an expeditious
procedure for
issuance of authorisation.
37.
The difficulty pointed out by the petitioners undoubtedly
discloses an administrative deficiency. The absence of a
prescribed timeline for grant of authorisation may cause delay.
However, an administrative vacuum cannot by itself invalidate an
otherwise valid statutory regulations. The Courts are concerned
with the constitutional validity and not the legislative wisdom. Once
- 58 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
Regulation 5.8(vii)(a) is held to be constitutionally valid, its
implementation necessarily follows. It is equally well settled that
where a law prescribes that a thing has to be done in a particular
manner, it has to be done in that manner alone. Regulation 5.8
(vii)(a) expressly requires government authorisation before an
RPPD becomes eligible to seek connectivity. Neither the CTUIL nor
this Court can dispense with such a statutory requirement.
Regulation 5.8 (vii)(a) continues to remain valid. Though the
learned Single Judge consciously declined to strike down or read
down the Regulations, once the validity of the Regulations was
preserved, the consequential direction compelling CTUIL to
process the application without fulfilment of the mandatory statutory
requirement could not have been issued. Such directions though
equitable in appearance, have the effect of rendering statutory
requirements otiose. We note that the Courts exercising judicial
review cannot indirectly suspend the operation of a statutory
Regulation
while
simultaneously
declining
to
declare
it
unconstitutional. The contention of the petitioners that CERC ought
to have exercised its enabling powers of relaxation or removal of
difficulties (under Regulation 41 and 42 of the GNA Regulations)
- 59 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
cannot advance the writ petitioners’ case. Regulations 41 and 42
of the GNA Regulations reads as under :
"41.
Power to Relax
The Central Commission, for reasons to be recorded
in writing, may relax any of the provisions of these
regulations on its own motion or on an application made
before it by an affected party to remove the hardship arising
out of the operation of these regulations.
"Regulation 41 enforced w.e.f. 15-10-2022 vide
Noti. No. F.No. L-1/261/2021/CERC, dated 9-10-2022."
42.
Power to Remove Difficulty
If any difficulty arises in giving effect to the provisions
of these regulations, the Central Commission may, on its
own motion or on an application made before it by affected
party by order, make such provision not inconsistent with
the provisions of the Act or provisions of other regulations
specified by the Central Commission, as may appear to be
necessary for removing the difficulty in giving effect to the
objectives of these regulations.
"Regulation 42 enforced w.e.f. 15-10-2022 vide
Noti. No. F.No. L-1/261/2021/CERC, dated 9-10-2022.""
38.
With the leave of the learned Single Judge (order dated
17.03.2025), the writ petitioners made a representation to CERC
seeking relaxation of the requirement in exercise of its power under
Regulation 41 of the GNA Regulations. CERC, by an order dated
11.04.2025, declined the request. Such enabling powers are
vested in the expert regulatory authority; and the Court, in exercise
- 60 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
of judicial review, cannot exercise these powers in substitution of
the regulator.
39.
There is, however, a necessity to recognize that the
grievance projected by the petitioners is not wholly without
substance. The material placed before the Court demonstrates that
the State of Karnataka did not have a clearly defined, transparent
and a time-bound mechanism for grant of authorisation under
Regulation 5.8(vii)(a). Such uncertainty has the potential of
adversely affecting genuine RPPDs, particularly in a regime where
transmission capacity is allocated on the first-come-first-served
basis.
40.
During
the
pendency
of
these
appeals,
the
State
Government has issued the requisite authorisation in favour of the
writ petitioner on 31.01.2026. Pursuant to the clarificatory orders
dated 18.03.2026 and 09.04.2026 issued by this Court, CTUIL has
proceeded to consider the writ petitioners’ applications keeping the
date of priority as 31.01.2026, in accordance with the GNA
Regulations. Consequently, the immediate grievance regarding
non-consideration
Nevertheless,
the
of
the
larger
applications
issue
no
longer
concerning
survives.
administrative
implementation requires attention. While this Court cannot rewrite
- 61 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
Regulation 5.8 (vii)(a) or dispense with its mandatory requirements,
nothing prevents the Court from observing that the State
Government
should
consider
an
appropriate
regulatory
or
administrative mechanism prescribing a transparent procedure, the
competent authority and a reasonable timeline for the grant of
authorisation. Such measures would advance the object of the
Regulations and avoid recurrence of similar disputes without
disturbing the statutory framework.
41.
For the foregoing reasons, answering the points for
consideration, we hold that Regulation 5.8(vii)(a) of the Central
Electricity Regulatory Commission (Connectivity and General
Network
Access
to
the
Inter-State
Transmission
System)
Regulations, 2022 is not liable to be struck down or read down on
the ground that it is manifestly arbitrary in violation of Article 14 of
the Constitution of India. Consequently, the learned Single Judge,
having sustained the Regulation, was not justified in issuing
directions inconsistent with its mandatory requirement. The
impugned order therefore warrants interference to that extent.
Accordingly, W.A. Nos. 569/2026 and 570/2026 preferred by M/s
Rays Power Infra Limited are hereby dismissed.
W.A. Nos.
1961/2025 and 1992/2025 preferred by the CTUIL, W.A. Nos.
- 62 -
WA No. 1961 of 2025
C/W WA No. 1703 of 2025
WA No. 1708 of 2025
AND 5 OTHERS
1703/2025 and 1708/2025 preferred by Essar Renewables Limited
and W.A. Nos. 1963/2025 and 1965/2025 preferred by AMPIN
Energy Utility Private Limited and connected appellants are hereby
allowed.
It is held that the Regulation 5.8(vii)(a) of Central
Electricity Regulatory Commission (Connectivity and General
Network
Access
to
the
Inter-State
Transmission
System)
Regulations, 2022 is valid and the challenge to the constitutional
validity of Regulation 5.8(vii)(a) of the GNA Regulations, raised by
the petitioner-M/s Rays Power Infra Limited, is hereby rejected.
42.
The pending applications in all the appeals stand disposed
of.
Sd/(VIBHU BAKHRU)
CHIEF JUSTICE
Sd/(K.S. HEMALEKHA)
JUDGE
CKL
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review