Judgments
LegalFirms.in Judgments · legalfirms.in/judgments/abdul-hameed-s-o-nisar-ahmed-vs-executive-engineer-20260325/ · Printed 28 Nov 2026
Civil

Abdul Hameed S/O Nisar Ahmed vs Executive Engineer

Add to a compilation

Keep judgments in folders, mark the paragraphs you rely on, and print a compilation with an index. It comes with the Research and Advocate Pro judgment plans and with a campus licence. Sign in · See the plans

Court
Rajasthan High Court
Date
25 March 2026
Case No.
CW 15276/2022
Result
Allowed
Bench
Ashok Kumar Jain
Cite this judgment
Citation
Link for your website or blog
Cite the court's own record or the law report in court filings.

The court's order

The closing paragraphs of the judgment, in the court's own words. The reasons are in the full text below.

20. In view of the discussion made here above, S.B. Civil Writ dated 26.02.2019 in LCA Case No. 448/2001 and award dated

28. 02.2019 in LCR Case No. 45/2001 are hereby set aside and the matter is remitted back to the Labour Court. The Labour Court is [2026:RJ-JP:15484] (13 of 13) [CW-14885/2022] directed to re-register the reference and decide afresh on the point of reference as referred by the Labour Department. However, the Labour Court is free to consider and mould the relief as discussed hereinabove.

Filed under

Industrial Disputes Act, 1947 Section 10, Industrial Disputes Act, 1947 Section 2A, Industrial Disputes Act, 1947

The law this judgment cites

Opens the section on Law Maker (lawmaker.in), our sister site for law students.

Full Judgment Text

Text read from the judgment PDF published on the High Court's eCourts portal, through the Indian High Court Judgments open data set (Dattam Labs, CC BY 4.0). The court's own copy is the authoritative text.

[2026:RJ-JP:15484] HIGH COURT OF JUDICATURE FOR RAJASTHAN BENCH AT JAIPUR S.B. Civil Writ Petition No. 14885/2022 Abdul Waheed S/o Abdul Hameed, Aged About 55 Years, Resident Of Shama Colony, Chhawni Kota 32005 (Rajasthan) ----Petitioner Versus Executive Engineer, Savan Bhado Project, Block Kota Rajasthan. ----Respondent Connected With S.B. Civil Writ Petition No. 15276/2022 Abdul Hameed S/o Nisar Ahmed, Aged About 56 Years, Resident Of Borkheda Kota (Rajasthan) ----Petitioner Versus Executive Engineer, Savan Bhado Project, Block Kota Rajasthan. ----Respondent For Petitioner(s) : Mr. Kaleem Ahamed Khan For Respondent(s) : Mr. Gopal Krishan Sharma, AGC HON'BLE MR. JUSTICE ASHOK KUMAR JAIN Order 25/03/2026 1. These writ petitions were filed from different awards but raising common question of law. The services of the petitioners of both the writ petitions were terminated on 17.08.1988 by the respondents. Thus they are decided with a common order. 2. S.B. Civil Writ Petition No. 14885/2022 is filed by petitioner Abdul Waheed aggrieved from award dated 26.02.2019 in LCA Case No. 448/2001 on a reference dated 05.07.2001 sent by the Labour Department under Section 10 of the Industrial Dispute Act. The Labour Court has rejected the claim on the ground of delay as [2026:RJ-JP:15484] (2 of 13) [CW-14885/2022] the dispute was raised after eight years of termination. The prayer of the writ petition is reproduced as under:"I. That by issuing an appropriate writ, order or direction be quashed and set aside the award dated 26-02-2019(Annexure-19). II. The respondent may be directed to reinstate the petitioner in role of service of Welder as he was working earlier under the employment of the respondent. III. That respondent may be directed to pay all the back wages and benefits of the service as prescribed by the law. IV. Any other direction which this Hon'ble Court deems just and proper in favour of the petitioners may kindly be passed. V. Cost of the writ petition may be awarded in favour of the petitioner." 3. S.B. Civil Writ Petition No.15276/2022 is filed by petitioner Abdul Hameed aggrieved from award dated 28.02.2019 in LCR Case No. 45/2001 on a reference by Labour Department dated 06.01.2001 under Section 10 of the Industrial Disputes Act, 1947. The prayer of the writ petition is reproduced as under:"I. That by issuing an appropriate writ, order or direction be quashed and set aside the award dated 28-02-2019(Annexure-17). II. The respondent may be directed to reinstate the petitioner in role of service of Welder as he was working earlier under the employment of the respondent. III. That respondent may be directed to pay all the back wages and benefits of the service as prescribed by the law. IV. Any other direction which this Hon'ble Court deems just and proper in favour of the petitioners may kindly be passed. V. Cost of the writ petition may be awarded in favour of the petitioner." 4. Learned counsel for the petitioners submits that vide letter dated 16.08.1988 the respondent has terminated the services of Tarachand, Abdul Hameed and Abdul Waheed with effect from 17.08.1988 (Annexure-1) and two workmen Abdul Hameed and (3 of 13) [2026:RJ-JP:15484] [CW-14885/2022] Abdul Waheed are before this Hon'ble Court by way of filing of these writ petitions. He further submits that the workman Tarachand has challenged the order dated 16.08.1988 by submitting a reference before the Labour Court, Kota which was decided on 21.04.1995 as LCR No.72/1990 and Labour Court has declared termination of service with effect from 17.08.1988 as unfair and illegal and reinstated Tarachand into service. He also submits that the case of the petitioners is identical with Tarachand as he was terminated with Abdul Hameed and Abdul Waheed by a common order. He further referred communication and reminder submitted that the Conciliation Officer on 22.08.1988 and the Joint Labour Commissioner on 03.02.1997 and submitted that the reference was not made on time to the Labour Court. He further submitted that if reference is not made on time, then it is not a case of delay by the petitioners. He further submitted that the respondent has not raised any objection about delay in raising the dispute but Labour Court itself has decided the reference only on ground that the termination on 17.08.1988 cannot be examined after so much of delay. He further submitted that Labour Court was bound to answer the reference and when the issue of delay was neither referred nor framed, then the reference cannot be rejected or returned on a question, which was not referred. He also submitted that the Labour Court without examining the legality of order has decided the claim, thus the order passed by the Labour Court is against the settled principle of law. 5. Aforesaid contentions were opposed by learned counsel for the respondent and he submitted that the services of the workmen were terminated only after making a payment of one (4 of 13) [2026:RJ-JP:15484] [CW-14885/2022] month salary and there is no illegality in termination order dated 16.08.1988. He submits that the dispute was raised only after adjudication of dispute in favour of Tarachand. He further submits that if the reference has been answered on the ground of delay, then the petitioners have no right to claim any relief from this Hon'ble Court. 6. Heard learned counsel for the parties and perused the material placed on record. 7. The material on record indicate that three persons Tarachand, Abdul Hameed and Abdul Waheed were working as daily wagers with the respondent and their services were discontinued by the respondent with effect from 17.08.1988 vide order dated 16.08.1988 (Annexure-1) but after making payment of one month's salary in lieu of notice. Tarachand has raised a labour dispute before the Conciliation Officer through union and Labour Department has made a reference on 08.05.1990 under Section 10 of the Industrial Disputes Act, 1947. This reference was decided as LCR Case No. 72/1990 on 21.04.1995 by the Labour Court, Kota and after declaring the termination as unfair and illegal, the respondent was directed to reinstate Tarachand with continuity. 8. The material on record submitted by the petitioners indicate that the dispute regarding termination on 17.08.1988 was also raised by Karamchari Union, Kota on 22.08.1988 and a specific dispute is raised about illegal termination of services of Abdul Waheed (Annexure-7 in CWP No. 14885/2022) and Abdul Hameed on 22.08.1988 (Annexure-6 in CWP No. 15276/2022) and these documents are placed on record. Further, reminders are also (5 of 13) [2026:RJ-JP:15484] [CW-14885/2022] placed on record to show that the dispute is raised soon after the termination. The material on record also indicate that representation dated 03.02.1997 was submitted to the Joint Labour Commissioner indicating delay by Conciliation Officer in making reference. Ultimately, this reference was made when Karamchari Union, Kota has made a representation on 01.10.1997 about delay of 9 years in the reference. 9. As soon as the dispute is referred by the Labour Department, a statement of claim is filed and a reply is filed by the respondentDepartment. The reply submitted by the respondents clearly indicate that they have not raised any ground of delay in their reply but the ground of delay was raised only in affidavit. The workman has specifically mentioned about raising a dispute on 22.08.1988 before the Conciliation Officer and further failure of conciliation in August 1989. The reference was only made in 2001. 10. The material on record also indicate that the representative of respondent was present before the Conciliation Officer even in 1999. In the reference made by Labour Department, no specific question about delay in raising the dispute was mentioned, which means the respondent has not raised any objection about delay. 11. The Labour Court has largely placed reliance upon the judgment in case of Sri. Prabhakar vs Joint Director Sericulture Department and Anr. reported as AIR 2016 SC 2984 = (2015) 15 SCC 1, wherein Hon'ble Supreme Court has considered applicability of the Limitation Act in matter relating to Industrial Disputes and we are reproducing following paragraphs from said judgment:"26) The aforesaid case law depicts the following: (6 of 13) [2026:RJ-JP:15484] [CW-14885/2022] (a) Law of limitation does not apply to the proceedings under the Industrial Disputes Act, 1947. (b) The words 'at any time' used in Section 10 would support that there is no period of limitation in making an order of reference. (c) At the same time, the appropriate Government has to keep in mind as to whether the dispute is still existing or live dispute and has not become a stale claim and if that is so, the reference can be refused. (d) Whether dispute is alive or it has become stale/non-existent at the time when the workman approaches the appropriate Government is an aspect which would depend upon the facts and circumstances of each case and there cannot be any hard and fast rule regarding the time for making the order of reference." 12. Section 2A of the Industrial Disputes Act, 1947 provides that dispute relating to discharge, dismissal, retrenchment, or termination of an individual, are deemed as industrial dispute, hence, an individual is having a right to raise the dispute. It was observed that:“36) It is now a well recognised principle of jurisprudence that a right not exercised for a long time is non-existent. Even when there is no limitation period prescribed by any statute relating to certain proceedings, in such cases Courts have coined the doctrine of laches and delays as well as doctrine of acquiescence and non-suited the litigants who approached the Court belatedly without any justifiable explanation for bringing the action after unreasonable delay. Doctrine of laches is in fact an application of maxim of equity "delay defeats equities. 37) This principle is applied in those cases where discretionary orders of the Court are claimed, such as specific performance, permanent or temporary injunction, appointment of receiver etc. These principles are also applied in the writ petitions filed under Articles 32 and 226 of Constitution of India. [2026:RJ-JP:15484] (7 of 13) [CW-14885/2022] In such cases, Courts can still refuse relief where the delay on the petitioner's part has prejudiced the respondent even though the petitioner might have come to Court within the period prescribed by the Limitation Act. 38) Likewise, if a party having a right stands by and sees another acting in a manner inconsistent with that right and makes no objection while the act is in progress he cannot afterwards complain. This principle is based on the doctrine of acquiescence implying that in such a case party who did not make any objection acquiesced into the alleged wrongful act of the other party and, therefore, has no right to complain against that alleged wrong. 39) Thus, in those cases where period of limitation is prescribed within which the action is to be brought before the Court, if the action is not brought within that prescribed period the aggrieved party looses remedy and cannot enforce his legal right after the period of limitation is over. Likewise, in other cases even where no limitation is prescribed, but for a long period the aggrieved party does not approach the machinery provided under the law for redressal of his grievance, it can be presumed that relief can be denied on the ground of unexplained delay and laches and/or on the presumption that such person has waived his right or acquiesced into the act of other. As mentioned above, these principles as part of equity are based on principles relatable to sound public policy that if a person does not exercise his right for a long time then such a right is non-existent. 40) On the basis of aforesaid discussion, we summarise the legal position as under: An industrial dispute has to be referred by the appropriate Government for adjudication and the workman cannot approach the Labour Court or Industrial Tribunal directly, except in those cases which are covered by Section 2A of the Act. Reference is made under Section 10 of the Act in those cases where the appropriate Government forms an opinion that 'any industrial dispute exists or is apprehended'. The words 'industrial dispute exists' are of paramount importance unless there is an existence of an industrial dispute (or the dispute is apprehended or it is apprehended such a dispute [2026:RJ-JP:15484] (8 of 13) [CW-14885/2022] may arise in near future), no reference is to be made. Thus, existence or apprehension of an industrial dispute is a sine qua non for making the reference. No doubt, at the time of taking a decision whether a reference is to be made or not, the appropriate Government is not to go into the merits of the dispute. Making of reference is only an administrative function. At the same time, on the basis of material on record, satisfaction of the existence of the industrial dispute or the apprehension of an industrial dispute is necessary. Such existence/apprehension of industrial dispute, thus, becomes a condition precedent, though it will be only subjective satisfaction based on material on record. Since, we are not concerned with the satisfaction dealing with cases where there is apprehended industrial dispute, discussion that follows would confine to existence of an industrial dispute. Dispute or difference arises when one party make a demand and other party rejects the same. It is held by this Court in number of cases that before raising the industrial dispute making of demand is a necessary pre-condition. In such a scenario, if the services of a workman are terminated and he does not make the demand and/or raise the issue alleging wrongful termination immediately thereafter or within reasonable time and raises the same after considerable lapse of period, whether it can be said that industrial dispute still exist. Since there is no period of limitation, it gives right to the workman to raise the dispute even belatedly. However, if the dispute is raised after a long period, it has to be seen as to whether such a dispute still exists? Thus, notwithstanding the fact that law of limitation does not apply, it is to be shown by the workman that there is a dispute in praesenti. For this purpose, he has to demonstrate that even if considerable period has lapsed and there are laches and delays, such delay has not resulted into making the industrial dispute seized to exist. Therefore, if the workman is able to give satisfactory explanation for these laches and delays and demonstrate that the circumstances discloses that issue is still alive, delay would not come in his way because of the reason that law of limitation has no application. On [2026:RJ-JP:15484] (9 of 13) [CW-14885/2022] the other hand, if because of such delay dispute no longer remains alive and is to be treated as “dead”, then it would be non-existent dispute which cannot be referred. Take, for example, a case where the workman issues notice after his termination, questioning the termination and demanding reinstatement. He is able to show that there were discussions from time to time and the parties were trying to sort out the matter amicably. Or he is able to show that there were assurances by the Management to the effect that he would be taken back in service and because of these reasons, he did not immediately raise the dispute by approaching the labour authorities seeking reference or did not invoke the remedy under Section 2A of the Act. In such a scenario, it can be treated that the dispute was live and existing as the workman never abandoned his right. However, in this very example, even if the notice of demand was sent but it did not evoke any positive response or there was specific rejection by the Management of his demand contained in the notice and thereafter he sleeps over the matter for number of years, it can be treated that he accepted the factum of his termination and rejection thereof by the Management and acquiesced into the said rejection. Take another example. A workman approaches the Civil Court by filing a suit against his termination which was pending for number of years and was ultimately dismissed on the ground that Civil Court did not have jurisdiction to enforce the contract of personal service and does not grant any reinstatement. At that stage, when the suit is dismissed or he withdraws that suit and then involves the machinery under the Act, it can lead to the conclusion that dispute is still alive as the workman had not accepted the termination but was agitating the same; albeit in a wrong forum. In contrast, in those cases where there was no agitation by the workman against his termination and the dispute is raised belatedly and the delay or laches remain unexplained, it would be presumed that he had waived his right or acquiesced into the act of termination and, therefore, at the time when the dispute is raised it had become stale and was not an 'existing dispute'. In such circumstances, the [2026:RJ-JP:15484] (10 of 13) [CW-14885/2022] appropriate Government can refuse to make reference. In the alternative, the Labour Court/Industrial Court can also hold that there is no “industrial dispute” within the meaning of Section 2(k) of the Act and, therefore, no relief can be granted. 41) We may hasten to clarify that in those cases where the Court finds that dispute still existed, though raised belatedly, it is always permissible for the Court to take the aspect of delay into consideration and mould the relief. In such cases, it is still open for the Court to either grant reinstatement without back wages or lesser back wages or grant compensation instead of reinstatement. We are of the opinion that the law on this issue has to be applied in the aforesaid perspective in such matters. 42) To summarise, although there is no limitation prescribed under the Act for making a reference under Section 10(1) of the Act, yet it is for the 'appropriate Government' to consider whether it is expedient or not to make the reference. The words 'at any time' used in Section 10(1) do not admit of any limitation in making an order of reference and laws of limitation are not applicable to proceedings under the Act. However, the policy of industrial adjudication is that very stale claims should not be generally encouraged or allowed inasmuch as unless there is satisfactory explanation for delay as, apart from the obvious risk to industrial peace from the entertainment of claims after long lapse of time, it is necessary also to take into account the unsettling effect which it is likely to have on the employers' financial arrangement and to avoid dislocation of an industry. 13. In case of Sri. Prabhakar vs Joint Director Sericulture Department and Anr. (supra), the order of termination was of 01.04.1985 and dispute was raised in 1999 (after 14 years of termination). On a reference, the Labour Court has decided in favour of the workman, but the writ petition preferred by the employer was dismissed but in a writ appeal preferred by (11 of 13) [2026:RJ-JP:15484] [CW-14885/2022] Management, same was allowed and award was quashed. Hon'ble Supreme Court has considered an issue where there was no explanation for substantial delay of 14 years after termination, as it was considered that the dispute was not existing at the time of reference. 14. Here in this case, the dispute was raised on 22.08.1988 and the same was demonstrated before the Labour Court. The material on record also indicate that the reference was made on basis of a complaint of Union dated 04.10.1997. The complaint of Union is available wherein previous letters and reminders were also mentioned. It indicate that the Labour Court has not considered the explanation submitted by the petitioners-workmen in both the cases which means without considering the explanation in particular promptness in raising the dispute, the reference was considered to file at belated stage. There was no objection in the reply to the statement of claim. There was no question referred on record about delay in raising dispute, thus, the judgment was not appropriately applied by the Labour Court. 15. Admittedly, there is no limitation prescribed in matters relating to industrial dispute and when there is no limitation then in such eventuality the Labour Court can mould the relief. 16. In the case of Bharat Sanchar Nigam Limited v. Bhurumal, (2014) 7 SCC 177, Hon’ble Supreme Court has held that even if the order of termination is found to be violative of the provisions of the Act of 1947, reinstatement with full back wages is not automatic and monetary compensation may be granted instead. In the said case, the period of engagement was very [2026:RJ-JP:15484] short and the Court (12 of 13) [CW-14885/2022] has closed the dispute by awarding compensation in lieu of reinstatement. 17. In the case of State of Uttarakhand v. Raj Kumar, (2019) 14 SCC 353 and Ranveer Singh v. State of Uttar Pradesh, AIR Online 2021 SC 794, it was held that delay affects the chances of reinstatement and in every matter reinstatement is not the only remedy, and the Court may award suitable compensation. 18. Considering aforesaid, the Labour Court was duty-bound to answer the reference and may deny the relief of reinstatement if it found that there was delay in raising the dispute or any other reason including non-existent dispute but it has to decide the question referred by the Labour Commissioner. The Labour Court cannot stay away from answering the reference, and it may deny the relief on ground of delay or any other reason. The Labour Court, instead of examining the reference on basis of material on record, has rejected the claim on ground of delay on opinion that dispute is non-existent. 19. Having considered the reasons assigned by the Labour Court and the material placed on record, I am of the considered view that where the Labour Court has not answered the reference, the appropriate remedy is to remitted back the matter to the Labour Court for decision afresh. 20. In view of the discussion made here above, S.B. Civil Writ Petition Nos.14885/2022 and 15276/2022 are allowed and award dated 26.02.2019 in LCA Case No. 448/2001 and award dated 28.02.2019 in LCR Case No. 45/2001 are hereby set aside and the matter is remitted back to the Labour Court. The Labour Court is [2026:RJ-JP:15484] (13 of 13) [CW-14885/2022] directed to re-register the reference and decide afresh on the point of reference as referred by the Labour Department. However, the Labour Court is free to consider and mould the relief as discussed hereinabove. 21. The parties are directed to appear before the concerned Labour Court on 04.05.2026. 22. With the aforesaid the writ petitions are disposed with pending applications, if any. 23. No order as to cost. (ASHOK KUMAR JAIN),J MR/11-12

This page is for informational and research purposes only and does not constitute legal advice. Consult a qualified advocate for advice specific to your situation.

Is your name in this judgment and should it be masked, or is something on this page wrong? Request a review

All Rajasthan HC judgments →